Shuren Wang
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Shuren Wang has a total of 9 co-authors. Here are the top co-authors by number of shared publications:
Dahu Rui
International Joint Research Laboratory of Henan Province for Underground Space Development and Disaster Prevention, Henan Polytechnic University, Jiaozuo 454003, China; State Key Laboratory of Frozen Soil Engineering, Cold and Arid Regions Environmental and Engineering Research Institute, Chinese Academy of Sciences, Lanzhou 730000, China
1 shared publicationHaiqing Zhang
Beijing Civil King Information Technology Corporation, Ltd
1 shared publicationJianfei Liu
International Joint Research Laboratory of Henan Province for Underground Space Development and Disaster Prevention, Henan Polytechnic University, Jiaozuo 454003, China
1 shared publicationMingchng Ji
International Joint Research Laboratory of Henan Province for Underground Space Development and Disaster Prevention, Henan Polytechnic University, Jiaozuo 454003, China
1 shared publicationPing Wang
Shen Kan Qinghuangdao Engineering & Technology Corporation, MCC
1 shared publicationTao Yu
Shen Kan Qinghuangdao Engineering & Technology Corporation, MCC
1 shared publication
Latest Publications
- 1 May 2019
- Published by Elsevier in Journal of Hazardous Materials
- Vol. 369, 87-95
Remediation of Cd- and Pb- contaminated clay soils through combined freeze-thaw and soil washing
- 1 May 2019
- Published by Elsevier in Journal of Hazardous Materials
- Vol. 369, 87-95
Remediation of Cd- and Pb- contaminated clay soils through combined freeze-thaw and soil washing
- Open Access
- 1 February 2015
- Published by The Institute for Research and Community Services (LPPM) ITB in Journal of Engineering and Technological Sciences
- Vol. 47 (1) , 46-56
Potential Risk Analysis of Tailings Dam under Preloading Condition and Its Countermeasures
It is very important for mine production safety to ensure the stability of the tailings dam. Taking a flatland tailings pond as the background, a threedimensional computational model was built based on a tailings dam under mullock heap preloading condition. Considering the current operating water level conditions, a liquid-solid coupling analysis of the model was conducted.The deformation characteristics of the tailings dam were revealed during successive preloading at the front of the dam. The safety factor and the potential slide face of the tailings dam were calculated under different conditions using the strength reduction method. The results show that the tailings dam in its current condition is basically stable, but if the mullock heap continues to be heightened, the tailings dam will become unstable. Therefore, in order to limit the height of the mullock heap, establishing a monitor and early warning mechanism are put forward to ensure mine production safety.
- 1 February 2015
- Published by The Institute for Research and Community Services (LPPM) ITB in Journal of Engineering and Technological Sciences
- Vol. 47 (1) , 46-56
Open AccessPotential Risk Analysis of Tailings Dam under Preloading Condition and Its Countermeasures
It is very important for mine production safety to ensure the stability of the tailings dam. Taking a flatland tailings pond as the background, a threedimensional computational model was built based on a tailings dam under mullock heap preloading condition. Considering the current operating water level conditions, a liquid-solid coupling analysis of the model was conducted.The deformation characteristics of the tailings dam were revealed during successive preloading at the front of the dam. The safety factor and the potential slide face of the tailings dam were calculated under different conditions using the strength reduction method. The results show that the tailings dam in its current condition is basically stable, but if the mullock heap continues to be heightened, the tailings dam will become unstable. Therefore, in order to limit the height of the mullock heap, establishing a monitor and early warning mechanism are put forward to ensure mine production safety.