Axel Gandy
3 shared publications- David James Brayshaw
Department of Meteorology University of Reading Reading UK
3 shared publications - Axel Gandy
Imperial College London
1 shared publication David J. Brayshaw
1 shared publication
Latest Publications
- Open Access
- 13 January 2023
- Published by Elsevier in Applied Energy
- Vol. 334
Reducing climate risk in energy system planning: A posteriori time series aggregation for models with storage
- 13 January 2023
- Published by Elsevier in Applied Energy
- Vol. 334
Open AccessReducing climate risk in energy system planning: A posteriori time series aggregation for models with storage
- Open Access
Efficient quantification of the impact of demand and weather uncertainty in power system models
This paper introduces a new approach to quantify the impact of forward propagated demand and weather uncertainty on power system planning and operation models. Recent studies indicate that such sampling uncertainty, originating from demand and weather time series inputs, should not be ignored. However, established uncertainty quantification approaches fail in this context due to the data and computing resources required for standard Monte Carlo analysis with disjoint samples. The method introduced here uses an m out of n bootstrap with shorter time series than the original, enhancing computational efficiency and avoiding the need for any additional data. It both quantifies output uncertainty and determines the sample length required for desired confidence levels. Simulations and validation exercises are performed on two capacity expansion planning models and one unit commitment and economic dispatch model. A diagnostic for the validity of estimated uncertainty bounds is discussed. The models, data and code are made available.
Open AccessEfficient quantification of the impact of demand and weather uncertainty in power system models
This paper introduces a new approach to quantify the impact of forward propagated demand and weather uncertainty on power system planning and operation models. Recent studies indicate that such sampling uncertainty, originating from demand and weather time series inputs, should not be ignored. However, established uncertainty quantification approaches fail in this context due to the data and computing resources required for standard Monte Carlo analysis with disjoint samples. The method introduced here uses an m out of n bootstrap with shorter time series than the original, enhancing computational efficiency and avoiding the need for any additional data. It both quantifies output uncertainty and determines the sample length required for desired confidence levels. Simulations and validation exercises are performed on two capacity expansion planning models and one unit commitment and economic dispatch model. A diagnostic for the validity of estimated uncertainty bounds is discussed. The models, data and code are made available.
- 14 October 2020
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Power Systems
- Vol. 36 (3) , 1771-1779
Efficient Quantification of the Impact of Demand and Weather Uncertainty in Power System Models
This paper introduces a new approach to quantify the impact of forward propagated demand and weather uncertainty on power system planning and operation models. Recent studies indicate that such sampling uncertainty, originating from demand and weather time series inputs, should not be ignored. However, established uncertainty quantification approaches fail in this context due to the data and computing resources required for standard Monte Carlo analysis with disjoint samples. The method introduced here uses an m out of n bootstrap with shorter time series than the original, enhancing computational efficiency and avoiding the need for any additional data. It both quantifies output uncertainty and determines the sample length required for desired confidence levels. Simulations and validation exercises are performed on two capacity expansion planning models and one unit commitment and economic dispatch model. A diagnostic for the validity of estimated uncertainty bounds is discussed. The models, data and code are made available.
- 14 October 2020
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Power Systems
- Vol. 36 (3) , 1771-1779
Efficient Quantification of the Impact of Demand and Weather Uncertainty in Power System Models
This paper introduces a new approach to quantify the impact of forward propagated demand and weather uncertainty on power system planning and operation models. Recent studies indicate that such sampling uncertainty, originating from demand and weather time series inputs, should not be ignored. However, established uncertainty quantification approaches fail in this context due to the data and computing resources required for standard Monte Carlo analysis with disjoint samples. The method introduced here uses an m out of n bootstrap with shorter time series than the original, enhancing computational efficiency and avoiding the need for any additional data. It both quantifies output uncertainty and determines the sample length required for desired confidence levels. Simulations and validation exercises are performed on two capacity expansion planning models and one unit commitment and economic dispatch model. A diagnostic for the validity of estimated uncertainty bounds is discussed. The models, data and code are made available.
- 1 October 2019
- Published by Elsevier in Applied Energy
- Vol. 251, 113114
Importance subsampling: improving power system planning under climate-based uncertainty
- 1 October 2019
- Published by Elsevier in Applied Energy
- Vol. 251, 113114
Importance subsampling: improving power system planning under climate-based uncertainty