Mohammad Mahmoodian Shooshtari
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Research Interests
Mohammad Mahmoodian Shooshtari has a total of 2 co-authors. Here are the top co-authors by number of shared publications:
- Mohammad Karimi Chahartaghi
PhD student, Department of Civil Engineering – Water Resources Engineering and Management, Shoushtar Branch, Islamic Azad University, Shoushtar, Iran
1 shared publication - Sohrab Nazari
Department of Civil Engineering, Eghlid Branch, Islamic Azad University, Eghlid, Iran
1 shared publication
Latest Publications
- 29 April 2019
- Published by Taylor & Francis in Journal of Hydraulic Research
- Vol. 58 (2) , 274-282
Investigating the effect of a parapet wall on the hydraulic performance of an arced piano key weir
Piano key weirs (PKWs) are classified as broad-crested weirs offering a high hydraulic performance. In this experimental study, the hydraulic performance of PKWs (of curved plan-form) under different hydraulic and geometric conditions was studied. A total of 16 experimental models with four different arc radii (35, 49, 70 and 90 cm) and central angles (90°, 65°, 50°, 45°) with a parapet wall of 4.5 cm height were considered. The results showed that by increasing the angle of the curved plan-form, the hydraulic performance of the weir was further affected by the parapet wall. Moreover, the parapet wall increased the hydraulic performance by 10% at most. In addition, the arced PKW with a parapet wall increased the performance by 2.98 and 3.82 times compared to the arced sharp-crested weir and the linear sharp-crested weir, respectively.
- 29 April 2019
- Published by Taylor & Francis in Journal of Hydraulic Research
- Vol. 58 (2) , 274-282
Investigating the effect of a parapet wall on the hydraulic performance of an arced piano key weir
Piano key weirs (PKWs) are classified as broad-crested weirs offering a high hydraulic performance. In this experimental study, the hydraulic performance of PKWs (of curved plan-form) under different hydraulic and geometric conditions was studied. A total of 16 experimental models with four different arc radii (35, 49, 70 and 90 cm) and central angles (90°, 65°, 50°, 45°) with a parapet wall of 4.5 cm height were considered. The results showed that by increasing the angle of the curved plan-form, the hydraulic performance of the weir was further affected by the parapet wall. Moreover, the parapet wall increased the hydraulic performance by 10% at most. In addition, the arced PKW with a parapet wall increased the performance by 2.98 and 3.82 times compared to the arced sharp-crested weir and the linear sharp-crested weir, respectively.