Gabrielle Delos
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Research Interests
Gabrielle Delos has a total of 3 co-authors. Here are the top co-authors by number of shared publications:
- Eungcheol Kim
Department of Civil and Environmental Engineering, Incheon National University, Incheon 22012, Republic of Korea
1 shared publication - Myungseob (Edward) Kim
Western New England Univ
1 shared publication - Tyler Clark
Western New England University, Springfield, MA 01095, USA
1 shared publication
Latest Publications
- Open Access
- 5 November 2019
- Published by MDPI AG in Sustainability
- Vol. 11 (21) , 6166
Post-Construction Alignment Revision in Direct-Fixation Railroad Tracks
In railroad construction—in particular, direct-fixation tracks—a longitudinal concrete block known as a “plinth” is used to elevate the profiles of the railroad track from the aerial guideway (e.g., bridge deck). A post-construction alignment revision is often required if the plinth elevation surpasses its maximum tolerance after the concrete pour. In such cases, the plinth surface needs to be grinded to meet the design elevation, or a shim should be inserted underneath the rail pad to raise the profile elevation. Considering both sides of the rail plinths, vertical design factors, and performance specifications, re-optimization of the vertical profile is of great interest, but the process poses challenges and represents a practical research problem. An optimization model aimed at minimizing the cost of post-construction alignment repairs is proposed and a real-case numerical example is analyzed to check the effectiveness of the model.
- 5 November 2019
- Published by MDPI AG in Sustainability
- Vol. 11 (21) , 6166
Open AccessPost-Construction Alignment Revision in Direct-Fixation Railroad Tracks
In railroad construction—in particular, direct-fixation tracks—a longitudinal concrete block known as a “plinth” is used to elevate the profiles of the railroad track from the aerial guideway (e.g., bridge deck). A post-construction alignment revision is often required if the plinth elevation surpasses its maximum tolerance after the concrete pour. In such cases, the plinth surface needs to be grinded to meet the design elevation, or a shim should be inserted underneath the rail pad to raise the profile elevation. Considering both sides of the rail plinths, vertical design factors, and performance specifications, re-optimization of the vertical profile is of great interest, but the process poses challenges and represents a practical research problem. An optimization model aimed at minimizing the cost of post-construction alignment repairs is proposed and a real-case numerical example is analyzed to check the effectiveness of the model.