Alexander Eckl
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Alexander Eckl has a total of 7 co-authors. Here are the top co-authors by number of shared publications:
- Susanne Albers
Technical University of Munich
3 shared publications Susanne Albers
Technical University of Munich
2 shared publications- Anja Kirschbaum
Advanced Optimization in a Networked Economy (AdONE) Technical University of Munich Germany
1 shared publication - Kevin Schewior
Department of Mathematics and Computer Science University of Cologne Germany
1 shared publication - Luisa Peter
Department of Informatics Technical University of Munich Boltzmannstr. 3 85748 Garching Germany
1 shared publication - Marilena Leichter
Operations Research, Department of Mathematics, Technische Universität München, Munich, Germany
1 shared publication
Latest Publications
- Open Access
A Stronger Impossibility for Fully Online Matching
We revisit the fully online matching model (Huang et al., J.\ ACM, 2020), an extension of the classic online matching model due to Karp, Vazirani, and Vazirani (STOC 1990), which has recently received a lot of attention (Huang et al., SODA 2019 and FOCS 2020), partly due to applications in ride-sharing platforms. It has been shown that the fully online version is harder than the classic version for which the achievable competitive ratio is at most $0.6317$, rather than precisely $1-\frac{1}{e}\approx 0.6321$. We introduce two new ideas to the construction. By optimizing the parameters of the modified construction numerically, we obtain an improved impossibility result of $0.6297$. Like the previous bound, the new bound even holds for fractional (rather than randomized) algorithms on bipartite graphs.Open AccessA Stronger Impossibility for Fully Online Matching
We revisit the fully online matching model (Huang et al., J.\ ACM, 2020), an extension of the classic online matching model due to Karp, Vazirani, and Vazirani (STOC 1990), which has recently received a lot of attention (Huang et al., SODA 2019 and FOCS 2020), partly due to applications in ride-sharing platforms. It has been shown that the fully online version is harder than the classic version for which the achievable competitive ratio is at most $0.6317$, rather than precisely $1-\frac{1}{e}\approx 0.6321$. We introduce two new ideas to the construction. By optimizing the parameters of the modified construction numerically, we obtain an improved impossibility result of $0.6297$. Like the previous bound, the new bound even holds for fractional (rather than randomized) algorithms on bipartite graphs. - Open Access
Scheduling with Testing on Multiple Identical Parallel Machines
Scheduling with testing is a recent online problem within the framework of explorable uncertainty motivated by environments where some preliminary action can influence the duration of a task. Jobs have an unknown processing time that can be explored by running a test. Alternatively, jobs can be executed for the duration of a given upper limit. We consider this problem within the setting of multiple identical parallel machines and present competitive deterministic algorithms and lower bounds for the objective of minimizing the makespan of the schedule. In the non-preemptive setting, we present the SBS algorithm whose competitive ratio approaches $3.1016$ if the number of machines becomes large. We compare this result with a simple greedy strategy and a lower bound which approaches $2$. In the case of uniform testing times, we can improve the SBS algorithm to be $3$-competitive. For the preemptive case we provide a $2$-competitive algorithm and a tight lower bound which approaches the same value.Open AccessScheduling with Testing on Multiple Identical Parallel Machines
Scheduling with testing is a recent online problem within the framework of explorable uncertainty motivated by environments where some preliminary action can influence the duration of a task. Jobs have an unknown processing time that can be explored by running a test. Alternatively, jobs can be executed for the duration of a given upper limit. We consider this problem within the setting of multiple identical parallel machines and present competitive deterministic algorithms and lower bounds for the objective of minimizing the makespan of the schedule. In the non-preemptive setting, we present the SBS algorithm whose competitive ratio approaches $3.1016$ if the number of machines becomes large. We compare this result with a simple greedy strategy and a lower bound which approaches $2$. In the case of uniform testing times, we can improve the SBS algorithm to be $3$-competitive. For the preemptive case we provide a $2$-competitive algorithm and a tight lower bound which approaches the same value. - Open Access
Explorable Uncertainty in Scheduling with Non-Uniform Testing Times
The problem of scheduling with testing in the framework of explorable uncertainty models environments where some preliminary action can influence the duration of a task. In the model, each job has an unknown processing time that can be revealed by running a test. Alternatively, jobs may be run untested for the duration of a given upper limit. Recently, D\"urr et al. [5] have studied the setting where all testing times are of unit size and have given lower and upper bounds for the objectives of minimizing the sum of completion times and the makespan on a single machine. In this paper, we extend the problem to non-uniform testing times and present the first competitive algorithms. The general setting is motivated for example by online user surveys for market prediction or querying centralized databases in distributed computing. Introducing general testing times gives the problem a new flavor and requires updated methods with new techniques in the analysis. We present constant competitive ratios for the objective of minimizing the sum of completion times in the deterministic case, both in the non-preemptive and preemptive setting. For the preemptive setting, we additionally give a first lower bound. We also present a randomized algorithm with improved competitive ratio. Furthermore, we give tight competitive ratios for the objective of minimizing the makespan, both in the deterministic and the randomized setting.
Open AccessExplorable Uncertainty in Scheduling with Non-Uniform Testing Times
The problem of scheduling with testing in the framework of explorable uncertainty models environments where some preliminary action can influence the duration of a task. In the model, each job has an unknown processing time that can be revealed by running a test. Alternatively, jobs may be run untested for the duration of a given upper limit. Recently, D\"urr et al. [5] have studied the setting where all testing times are of unit size and have given lower and upper bounds for the objectives of minimizing the sum of completion times and the makespan on a single machine. In this paper, we extend the problem to non-uniform testing times and present the first competitive algorithms. The general setting is motivated for example by online user surveys for market prediction or querying centralized databases in distributed computing. Introducing general testing times gives the problem a new flavor and requires updated methods with new techniques in the analysis. We present constant competitive ratios for the objective of minimizing the sum of completion times in the deterministic case, both in the non-preemptive and preemptive setting. For the preemptive setting, we additionally give a first lower bound. We also present a randomized algorithm with improved competitive ratio. Furthermore, we give tight competitive ratios for the objective of minimizing the makespan, both in the deterministic and the randomized setting.
- 31 July 2021
- Published by Springer Nature
- p. 29-42
Scheduling with Testing on Multiple Identical Parallel Machines
- 31 July 2021
- Published by Springer Nature
- p. 29-42
Scheduling with Testing on Multiple Identical Parallel Machines
- Open Access
- 6 July 2021
- Published by Springer Nature
- p. 127-142
Explorable Uncertainty in Scheduling with Non-uniform Testing Times
The problem of scheduling with testing in the framework of explorable uncertainty models environments where some preliminary action can influence the duration of a task. In the model, each job has an unknown processing time that can be revealed by running a test. Alternatively, jobs may be run untested for the duration of a given upper limit. Recently, Dürr et al. [4] have studied the setting where all testing times are of unit size and have given lower and upper bounds for the objectives of minimizing the sum of completion times and the makespan on a single machine. In this paper, we extend the problem to non-uniform testing times and present the first competitive algorithms. The general setting is motivated for example by online user surveys for market prediction or querying centralized databases in distributed computing. Introducing general testing times gives the problem a new flavor and requires updated methods with new techniques in the analysis. We present constant competitive ratios for the objective of minimizing the sum of completion times in the deterministic case, both in the non-preemptive and preemptive setting. For the preemptive setting, we additionally give a first lower bound. We also present a randomized algorithm with improved competitive ratio. Furthermore, we give tight competitive ratios for the objective of minimizing the makespan, both in the deterministic and the randomized setting.
- 6 July 2021
- Published by Springer Nature
- p. 127-142
Open AccessExplorable Uncertainty in Scheduling with Non-uniform Testing Times
The problem of scheduling with testing in the framework of explorable uncertainty models environments where some preliminary action can influence the duration of a task. In the model, each job has an unknown processing time that can be revealed by running a test. Alternatively, jobs may be run untested for the duration of a given upper limit. Recently, Dürr et al. [4] have studied the setting where all testing times are of unit size and have given lower and upper bounds for the objectives of minimizing the sum of completion times and the makespan on a single machine. In this paper, we extend the problem to non-uniform testing times and present the first competitive algorithms. The general setting is motivated for example by online user surveys for market prediction or querying centralized databases in distributed computing. Introducing general testing times gives the problem a new flavor and requires updated methods with new techniques in the analysis. We present constant competitive ratios for the objective of minimizing the sum of completion times in the deterministic case, both in the non-preemptive and preemptive setting. For the preemptive setting, we additionally give a first lower bound. We also present a randomized algorithm with improved competitive ratio. Furthermore, we give tight competitive ratios for the objective of minimizing the makespan, both in the deterministic and the randomized setting.
- Open Access
Minimization of Weighted Completion Times in Path-based Coflow Scheduling
Coflow scheduling models communication requests in parallel computing frameworks where multiple data flows between shared resources need to be completed before computation can continue. In this paper, we introduce Path-based Coflow Scheduling, a generalized problem variant that considers coflows as collections of flows along fixed paths on general network topologies with node capacity restrictions. For this problem, we minimize the coflows' total weighted completion time. We show that flows on paths in the original network can be interpreted as hyperedges in a hypergraph and transform the path-based scheduling problem into an edge scheduling problem on this hypergraph. We present a $(2\lambda + 1)$-approximation algorithm when node capacities are set to one, where $\lambda$ is the maximum number of nodes in a path. For the special case of simultaneous release times for all flows, our result improves to a $(2\lambda)$-approximation. Furthermore, we generalize the result to arbitrary node constraints and obtain a $(2\lambda\Delta + 1)$- and a $(2\lambda\Delta)$-approximation in the case of general and zero release times, where $\Delta$ captures the capacity disparity between nodes.Open AccessMinimization of Weighted Completion Times in Path-based Coflow Scheduling
Coflow scheduling models communication requests in parallel computing frameworks where multiple data flows between shared resources need to be completed before computation can continue. In this paper, we introduce Path-based Coflow Scheduling, a generalized problem variant that considers coflows as collections of flows along fixed paths on general network topologies with node capacity restrictions. For this problem, we minimize the coflows' total weighted completion time. We show that flows on paths in the original network can be interpreted as hyperedges in a hypergraph and transform the path-based scheduling problem into an edge scheduling problem on this hypergraph. We present a $(2\lambda + 1)$-approximation algorithm when node capacities are set to one, where $\lambda$ is the maximum number of nodes in a path. For the special case of simultaneous release times for all flows, our result improves to a $(2\lambda)$-approximation. Furthermore, we generalize the result to arbitrary node constraints and obtain a $(2\lambda\Delta + 1)$- and a $(2\lambda\Delta)$-approximation in the case of general and zero release times, where $\Delta$ captures the capacity disparity between nodes.