Ivan Damnjanovic
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Ivan Damnjanovic has a total of 28 co-authors. Here are the top co-authors by number of shared publications:
Kenneth Reinschmidt
College Station, TX, USA
6 shared publications- Molly Gunby
Graduate Research Assistant, Texas A&M Univ., Zachry Dept. of Civil Engineering, College Station, TX 77843
3 shared publications - Deog Sang Bae
Is a PhD candidate at Texas A&M University in College Station, TX
2 shared publications - Mustafa M. Cobanoglu
Univ. of Texas at Arlington
2 shared publications Paolo Gardoni
Zachry Department of Civil Engineering , Texas A&M University , College Station, TX, 77843-3136, USA
2 shared publications- Paul Govan
GE Aerospace, Greenville, SC, USA
2 shared publications
Latest Publications
- Open Access
- 1 April 2023
- Published by Iowa State University in The Journal of Technology, Management, and Applied Engineering
- Vol. 39 (2)
Assessment of an Autonomous Racing Controller: A Case Study From the Indy Autonomous Challenge ’ s Simulation Race
The Indy Autonomous Challenge (IAC) was a competition among universities from around the world created to showcase fully autonomous operations under the extreme circumstances encountered in high-performance racing. The pinnacle of the virtual portion of the competition occurred on June 30,2021, during the IAC Simulation Race that consisted of a series of qualifying events followed by a head-to-head race. The objectives of this paper are to present a team’s controller and demonstrate its performance throughout the IAC until the final simulation race. The results presented in this paper were obtained by testing the team’s controller within a simulated environment. The final controller is capable of sustaining speeds of nearly 300 kph (186 mph) with an average speed of 280 kph(174 mph) and a maximum speed of 298 kph (185 mph). The final steering proportional-integral-derivative controller yielded cross-track errors no more than 4.7 meters from the desired waypoint. Analysis of the simulated vehicle’s G-G diagram reveals that the vehicle could sustain operations while experiencing over 2.5 Gs of lateral force as it navigated the turns of the track, and there is evidence to suggest that future work can be performed to tap into the full potential of the tires’ grip capabilities.The results presented in this report are indicative that the race team’s controller can perform safe high-speed operations in the presence of seven additional script-controlled opponents within a simulated environment.
- 1 April 2023
- Published by Iowa State University in The Journal of Technology, Management, and Applied Engineering
- Vol. 39 (2)
Open AccessAssessment of an Autonomous Racing Controller: A Case Study From the Indy Autonomous Challenge ’ s Simulation Race
The Indy Autonomous Challenge (IAC) was a competition among universities from around the world created to showcase fully autonomous operations under the extreme circumstances encountered in high-performance racing. The pinnacle of the virtual portion of the competition occurred on June 30,2021, during the IAC Simulation Race that consisted of a series of qualifying events followed by a head-to-head race. The objectives of this paper are to present a team’s controller and demonstrate its performance throughout the IAC until the final simulation race. The results presented in this paper were obtained by testing the team’s controller within a simulated environment. The final controller is capable of sustaining speeds of nearly 300 kph (186 mph) with an average speed of 280 kph(174 mph) and a maximum speed of 298 kph (185 mph). The final steering proportional-integral-derivative controller yielded cross-track errors no more than 4.7 meters from the desired waypoint. Analysis of the simulated vehicle’s G-G diagram reveals that the vehicle could sustain operations while experiencing over 2.5 Gs of lateral force as it navigated the turns of the track, and there is evidence to suggest that future work can be performed to tap into the full potential of the tires’ grip capabilities.The results presented in this report are indicative that the race team’s controller can perform safe high-speed operations in the presence of seven additional script-controlled opponents within a simulated environment.
- 1 March 2020
- Published by American Society of Civil Engineers (ASCE) in ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering
- Vol. 6 (1)
Structural Network Measures for Risk Assessment of Construction Projects
Risk assessment is an integral part of project management; however, its implementation is often challenging. One of the key challenges is how to collect reliable data for modeling risks. The objective of this paper is to introduce a network-based approach for risk assessment when data is limited or unreliable. The proposed structural network measures focus on relative connectivity of project tasks, resources, and risk events; or in other words, the data that are typically available from project planning and considered more reliable. The central concept is built upon the method called resource-based project risk management, which involves the identification and assessment of risks in terms of resource impacts and the subsequent effects on duration and/or cost of project tasks. The proposed methodology is illustrated using case study data.
- 1 March 2020
- Published by American Society of Civil Engineers (ASCE) in ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering
- Vol. 6 (1)
Structural Network Measures for Risk Assessment of Construction Projects
Risk assessment is an integral part of project management; however, its implementation is often challenging. One of the key challenges is how to collect reliable data for modeling risks. The objective of this paper is to introduce a network-based approach for risk assessment when data is limited or unreliable. The proposed structural network measures focus on relative connectivity of project tasks, resources, and risk events; or in other words, the data that are typically available from project planning and considered more reliable. The central concept is built upon the method called resource-based project risk management, which involves the identification and assessment of risks in terms of resource impacts and the subsequent effects on duration and/or cost of project tasks. The proposed methodology is illustrated using case study data.
- 24 May 2019
- Published by Springer Nature
- p. 65-80
Monte Carlo Simulation Approach for the Probability Distribution of Project Performance Functions
- 24 May 2019
- Published by Springer Nature
- p. 65-80
Monte Carlo Simulation Approach for the Probability Distribution of Project Performance Functions
- 24 May 2019
- Published by Springer Nature
- p. 165-180
Approximate Risk Function for Project Durations
- 24 May 2019
- Published by Springer Nature
- p. 45-64
Second Moment Approach for the Probability Distribution of Project Performance Functions
- 24 May 2019
- Published by Springer Nature
- p. 45-64
Second Moment Approach for the Probability Distribution of Project Performance Functions
- 24 May 2019
- Published by Springer Nature
- p. 81-107
Correlation in Projects
- 24 May 2019
- Published by Springer Nature
- p. 181-203
Contingency and Management Reserves
- 24 May 2019
- Published by Springer Nature
- p. 143-164
Sensitivity and Common Cause Effects
- 1 March 2018
- Published by American Society of Civil Engineers (ASCE) in Journal of Management in Engineering
- Vol. 34 (2)
Analysis of Performance-Based Pavement Markings and Markers Contracts: Case Study from San Antonio
Performance-based specifications are becoming an increasingly popular method for delivery of transportation infrastructure assets including pavement markings and markers. However, in spite of their recent popularity, it is unclear how effective performance-based specifications are when compared with the traditional methods, such as unit-based contracts. This case study aims to bridge this gap by assessing the cost-effectiveness of the first performance-based contract for pavement markings and markers let by the Texas DOT (TxDOT) San Antonio District. The analysis is based on a comprehensive data set, which includes activity reports with installation quantities and man-hours, reimbursement and deduction reports, and condition assessment for a period of 5 years (from 2006 to 2011). The results show that the implementation of the contract did not provide the key benefits of performance-based contracting, such as financing, reduced costs, and the overall improvement in the condition of the managed network.
- 1 March 2018
- Published by American Society of Civil Engineers (ASCE) in Journal of Management in Engineering
- Vol. 34 (2)
Analysis of Performance-Based Pavement Markings and Markers Contracts: Case Study from San Antonio
Performance-based specifications are becoming an increasingly popular method for delivery of transportation infrastructure assets including pavement markings and markers. However, in spite of their recent popularity, it is unclear how effective performance-based specifications are when compared with the traditional methods, such as unit-based contracts. This case study aims to bridge this gap by assessing the cost-effectiveness of the first performance-based contract for pavement markings and markers let by the Texas DOT (TxDOT) San Antonio District. The analysis is based on a comprehensive data set, which includes activity reports with installation quantities and man-hours, reimbursement and deduction reports, and condition assessment for a period of 5 years (from 2006 to 2011). The results show that the implementation of the contract did not provide the key benefits of performance-based contracting, such as financing, reduced costs, and the overall improvement in the condition of the managed network.
- 22 January 2018
- Published by With Intelligence LLC in The Journal of Structured Finance
- Vol. 23 (4) , 57-68
Credit Risk Assessment and Monitoring of TIF Bonds
Local governments have multiple options to secure financing for infrastructure projects, including using tax-increment financing (TIF) bonds. Although the TIF concept brings numerous benefits, it is also associated with several key challenges, including characterizing the uncertainty in tax increment revenue as the most prominent challenge. This article presents a framework that aims to help all market stakeholders better understand the credit risk associated with TIF bonds. The framework focuses on reconstituting the asset credit risk profile and detecting early warning signals of changing conditions. The key benefit of the proposed framework is its capacity to use publically available time series data. The case study illustrating the framework is based on the “Uptown Development Authority” bond, structured to support redevelopment projects in Houston, Texas.
- 22 January 2018
- Published by With Intelligence LLC in The Journal of Structured Finance
- Vol. 23 (4) , 57-68
Credit Risk Assessment and Monitoring of TIF Bonds
Local governments have multiple options to secure financing for infrastructure projects, including using tax-increment financing (TIF) bonds. Although the TIF concept brings numerous benefits, it is also associated with several key challenges, including characterizing the uncertainty in tax increment revenue as the most prominent challenge. This article presents a framework that aims to help all market stakeholders better understand the credit risk associated with TIF bonds. The framework focuses on reconstituting the asset credit risk profile and detecting early warning signals of changing conditions. The key benefit of the proposed framework is its capacity to use publically available time series data. The case study illustrating the framework is based on the “Uptown Development Authority” bond, structured to support redevelopment projects in Houston, Texas.