Claudio Mourgues
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Claudio Mourgues has a total of 35 co-authors. Here are the top co-authors by number of shared publications:
- Luis Fernando Alarcon
Pontificia Universidad Católica de Chile
9 shared publications - Harrison Mesa
School of Civil Construction, Faculty of Engineering, Pontificia Universidad Católica de Chile, Santiago 7820436, Chile
4 shared publications - Eugenio Pellicer
Universitat Politècnica de València
3 shared publications - Pablo Guindos
Faculty of Architecture and Centro de Innovación Tecnolóxica en Edificación e Enxeñaría Civil (CITEEC), Universidade da Coruña, 15071 A Coruña, Spain
3 shared publications - Paz Arroyo
Pontificia Universidad Catolica de Chile, Santiago, Chile
3 shared publications - Rodrigo Fernando Herrera
Pontificia Universidad Católica de Valparaíso
3 shared publications
Latest Publications
- 6 November 2025
- Published by Springer Nature
- p. 333-344
VR-Based Jobsite Visits for Construction Engineers
- 6 November 2025
- Published by Springer Nature
- p. 333-344
VR-Based Jobsite Visits for Construction Engineers
- Open Access
- 11 July 2025
- Published by MDPI AG in Applied Sciences
- Vol. 15 (14) , 7820
An Interface Design Method Based on Situation Awareness and Immersive Analytics for Augmented and Mixed Reality Decision Support Systems in Construction
Research on augmented reality (AR) and mixed reality (MR) demonstrated their potential to support decision-making in construction. However, most efforts emphasized technological advancements, often overlooking how to present and interact with information to effectively support decision-making in AR/MR environments. This study proposes an interface design method that integrates situation awareness (SA) and immersive analytics (IA), two complementary frameworks that address user information needs and immersive interaction design. The method guides the design of AR/MR interfaces by aligning information content, presentation, and interaction with SA requirements and IA design principles. To evaluate its effectiveness, the method was applied to develop AR and MR interface prototypes for a simulated decision-making task involving field managers during indoor construction activities of high-rise construction projects. Results show high levels of SA achieved by participants, with no statistically significant differences between AR and MR interfaces, demonstrating the method’s effectiveness to support SA in both environments. The proposed method provides a structured approach for designing immersive interfaces that enable better perception, comprehension, and projection in dynamic construction scenarios. Moreover, it provides designers with practical guidance for interface development and allows practitioners to assess existing AR/MR solutions based on their capacity to enhance SA through IA.
- 11 July 2025
- Published by MDPI AG in Applied Sciences
- Vol. 15 (14) , 7820
Open AccessAn Interface Design Method Based on Situation Awareness and Immersive Analytics for Augmented and Mixed Reality Decision Support Systems in Construction
Research on augmented reality (AR) and mixed reality (MR) demonstrated their potential to support decision-making in construction. However, most efforts emphasized technological advancements, often overlooking how to present and interact with information to effectively support decision-making in AR/MR environments. This study proposes an interface design method that integrates situation awareness (SA) and immersive analytics (IA), two complementary frameworks that address user information needs and immersive interaction design. The method guides the design of AR/MR interfaces by aligning information content, presentation, and interaction with SA requirements and IA design principles. To evaluate its effectiveness, the method was applied to develop AR and MR interface prototypes for a simulated decision-making task involving field managers during indoor construction activities of high-rise construction projects. Results show high levels of SA achieved by participants, with no statistically significant differences between AR and MR interfaces, demonstrating the method’s effectiveness to support SA in both environments. The proposed method provides a structured approach for designing immersive interfaces that enable better perception, comprehension, and projection in dynamic construction scenarios. Moreover, it provides designers with practical guidance for interface development and allows practitioners to assess existing AR/MR solutions based on their capacity to enhance SA through IA.
- Open Access
Impact of Using an Exchange Model (EM) to Support the Early Assessment Process of Industrialized Timber Projects
Standardized information on the processes and requirements for information exchanges is critical to ensure accurate cost estimations. However, traditional methods based on 2D information lack the standardization and information required for efficient and reliable early commercial evaluation. This study aims to evaluate the effectiveness and efficiency of the information exchange model (EM-01) proposed for the commercial evaluation of industrialized timber projects. This study adopted two illustrative cases of projects to make a comparative analysis between the traditional method that prefabrication companies use and the EM-01. The evaluation focused on effectiveness, efficiency, level of certainty, and the user’s perception. The results indicate that both methods enable project evaluation. However, the EM-01 offers better efficiency by reducing work time, reduces uncertainty by minimizing assumptions, and improves the user’s perception of the reliability of the commercial evaluation. The EM-01 provides more standardized information and specific structural design data supporting the early commercial evaluation. This study supports the idea that incorporating standardized information into the processes and requirements for information exchanges enhances the accuracy and reliability of early commercial evaluation in industrialized timber projects.
Open AccessImpact of Using an Exchange Model (EM) to Support the Early Assessment Process of Industrialized Timber Projects
Standardized information on the processes and requirements for information exchanges is critical to ensure accurate cost estimations. However, traditional methods based on 2D information lack the standardization and information required for efficient and reliable early commercial evaluation. This study aims to evaluate the effectiveness and efficiency of the information exchange model (EM-01) proposed for the commercial evaluation of industrialized timber projects. This study adopted two illustrative cases of projects to make a comparative analysis between the traditional method that prefabrication companies use and the EM-01. The evaluation focused on effectiveness, efficiency, level of certainty, and the user’s perception. The results indicate that both methods enable project evaluation. However, the EM-01 offers better efficiency by reducing work time, reduces uncertainty by minimizing assumptions, and improves the user’s perception of the reliability of the commercial evaluation. The EM-01 provides more standardized information and specific structural design data supporting the early commercial evaluation. This study supports the idea that incorporating standardized information into the processes and requirements for information exchanges enhances the accuracy and reliability of early commercial evaluation in industrialized timber projects.
- Open Access
- 14 April 2025
- Published by MDPI AG in Preprints.org
Impact of Using an Exchange Model (EM) to Support the Early Assessment Process of Industrialized Timber Projects
The early commercial evaluation process of industrialized timber projects is critical to ensure accurate cost estimations and informed decision-making. However, traditional methods based on 2D information lack the standardization and information required for efficient and reliable early commercial evaluation. This study aims to validate the effectiveness and efficiency of the information exchange model (EM-01) proposed for the commercial evaluation of industrialized timber projects. This study adopted two illustrative cases of projects to make a comparative analysis between the traditional method that prefabrication companies use and the EM-01. The evaluation focused on effectiveness, efficiency, level of certainty, and the user’s perception. The results indicate that both methods enable project evaluation. However, the EM-01 offers better efficiency by reducing work time, reduces uncertainty by minimizing assumptions, and improves the user’s perception of the reliability of the commercial evaluation. The EM-01 provides more standardized information and specific structural design data supporting the early commercial evaluation. This study supports the idea that incorporating standardized information into the processes and requirements for information exchanges enhances the accuracy and reliability of early commercial evaluation in industrialized timber projects.
- 14 April 2025
- Published by MDPI AG in Preprints.org
Open AccessImpact of Using an Exchange Model (EM) to Support the Early Assessment Process of Industrialized Timber Projects
The early commercial evaluation process of industrialized timber projects is critical to ensure accurate cost estimations and informed decision-making. However, traditional methods based on 2D information lack the standardization and information required for efficient and reliable early commercial evaluation. This study aims to validate the effectiveness and efficiency of the information exchange model (EM-01) proposed for the commercial evaluation of industrialized timber projects. This study adopted two illustrative cases of projects to make a comparative analysis between the traditional method that prefabrication companies use and the EM-01. The evaluation focused on effectiveness, efficiency, level of certainty, and the user’s perception. The results indicate that both methods enable project evaluation. However, the EM-01 offers better efficiency by reducing work time, reduces uncertainty by minimizing assumptions, and improves the user’s perception of the reliability of the commercial evaluation. The EM-01 provides more standardized information and specific structural design data supporting the early commercial evaluation. This study supports the idea that incorporating standardized information into the processes and requirements for information exchanges enhances the accuracy and reliability of early commercial evaluation in industrialized timber projects.
- Open Access
- 24 April 2023
- Published by Wiley in Advances in Civil Engineering
- Vol. 2023, 1-17
IDM for the Conceptual Evaluation Process of Industrialized Timber Projects
Interest in industrialized timber construction systems, in particular light-frame systems, has increased worldwide due to its various benefits. However, it is very important for projects executed under the off-site construction system to consider the different manufacture and assembly requirements in their design, following the design for manufacturing and assembly (DFMA) concept. It is fundamental that these requirements and assumptions for manufacture and assembly be considered in a conceptual evaluation during the early stages of the project, as these have an impact on stakeholder decision making, detailed design, production, and sourcing strategies. To accomplish this, the use of building information modeling (BIM) has simplified the different processes and tasks required in the development of these projects, in addition to the synergy between both methodologies. However, it is vital to be clear about the information requirements of each process to properly use the BIM methodology. This paper presents the proposal of a BIM standard, the information delivery manual (IDM), which identifies the associated process map and the information parameters required for early evaluation, which were validated with local prefabrication companies as well as compared to the property sets present in the IFC standard.
- 24 April 2023
- Published by Wiley in Advances in Civil Engineering
- Vol. 2023, 1-17
Open AccessIDM for the Conceptual Evaluation Process of Industrialized Timber Projects
Interest in industrialized timber construction systems, in particular light-frame systems, has increased worldwide due to its various benefits. However, it is very important for projects executed under the off-site construction system to consider the different manufacture and assembly requirements in their design, following the design for manufacturing and assembly (DFMA) concept. It is fundamental that these requirements and assumptions for manufacture and assembly be considered in a conceptual evaluation during the early stages of the project, as these have an impact on stakeholder decision making, detailed design, production, and sourcing strategies. To accomplish this, the use of building information modeling (BIM) has simplified the different processes and tasks required in the development of these projects, in addition to the synergy between both methodologies. However, it is vital to be clear about the information requirements of each process to properly use the BIM methodology. This paper presents the proposal of a BIM standard, the information delivery manual (IDM), which identifies the associated process map and the information parameters required for early evaluation, which were validated with local prefabrication companies as well as compared to the property sets present in the IFC standard.
- Open Access
Exploring Value Generation in Target Value Design Applying a Value Analysis Model
Target value design (TVD) is a management approach that applies target costing in the design and construction industry. TVD enables a project environment with favorable characteristics to generate value. However, because the TVD’s primary assessment is cost, target cost can be met without necessarily achieving the project’s full value. This research applies the action research approach to implement TVD in a housing project and explores the value generation of the project using a value analysis model (VAM) to study the balance between cost and value fulfillment in the product and design process. According to the results, even though the target cost was achieved, the desired value of the project was not achieved during the project design. However, there is a tendency to increase value over time to a greater extent in the product and not so much in the process. The main contributions of this study are the possibility of comparing cost and value, identifying the emphasis of product over process and cost over value throughout the TVD project. This study enhances the literature on project value generation and maximization, offering new knowledge for a better understanding of how to conduct a value analysis in combination with costing in TVD projects.
Open AccessExploring Value Generation in Target Value Design Applying a Value Analysis Model
Target value design (TVD) is a management approach that applies target costing in the design and construction industry. TVD enables a project environment with favorable characteristics to generate value. However, because the TVD’s primary assessment is cost, target cost can be met without necessarily achieving the project’s full value. This research applies the action research approach to implement TVD in a housing project and explores the value generation of the project using a value analysis model (VAM) to study the balance between cost and value fulfillment in the product and design process. According to the results, even though the target cost was achieved, the desired value of the project was not achieved during the project design. However, there is a tendency to increase value over time to a greater extent in the product and not so much in the process. The main contributions of this study are the possibility of comparing cost and value, identifying the emphasis of product over process and cost over value throughout the TVD project. This study enhances the literature on project value generation and maximization, offering new knowledge for a better understanding of how to conduct a value analysis in combination with costing in TVD projects.
- Open Access
Comparing Team Interactions in Traditional and BIM-Lean Design Management
There is qualitative evidence showing that design teams that use BIM-lean management have a higher level of interaction than design teams that do not use this management approach. However, there is no quantitative empirical evidence of this higher level of interaction. Therefore, the objective of this paper is to present quantitative empirical evidence of the differences among the various types of interactions of a design team. Two case studies were analyzed, and their design management was assessed from a lean BIM perspective while their team interactions were assessed using social network analysis (SNA). To achieve the aim of this paper, four steps were performed: (1) case study selection; (2) description of the design management of the projects from the lean design management and BIM perspectives; (3) assessment of design team interaction; and (4) comparison using SNA. The results show that the project that applied BIM-lean management exhibited higher levels of interactions among its design team members than the traditional team; transparent, orderly, and standardized information flows; a collaborative, trusting, and learning environment; and commitment management. None of these interaction elements were visible in the project that did not apply BIM-lean management. It is suggested that an analysis be performed on a representative sample of projects in the future so that conclusive statistical inferences could be made.
Open AccessComparing Team Interactions in Traditional and BIM-Lean Design Management
There is qualitative evidence showing that design teams that use BIM-lean management have a higher level of interaction than design teams that do not use this management approach. However, there is no quantitative empirical evidence of this higher level of interaction. Therefore, the objective of this paper is to present quantitative empirical evidence of the differences among the various types of interactions of a design team. Two case studies were analyzed, and their design management was assessed from a lean BIM perspective while their team interactions were assessed using social network analysis (SNA). To achieve the aim of this paper, four steps were performed: (1) case study selection; (2) description of the design management of the projects from the lean design management and BIM perspectives; (3) assessment of design team interaction; and (4) comparison using SNA. The results show that the project that applied BIM-lean management exhibited higher levels of interactions among its design team members than the traditional team; transparent, orderly, and standardized information flows; a collaborative, trusting, and learning environment; and commitment management. None of these interaction elements were visible in the project that did not apply BIM-lean management. It is suggested that an analysis be performed on a representative sample of projects in the future so that conclusive statistical inferences could be made.
- Open Access
- 15 September 2021
- Published by Association for Computing Machinery (ACM)
- p. 103-109
International collaboration between Latin American universities towards educational innovation in engineering: Case study
Collaboration between universities has become a driving force to develop and promote a culture of educational innovation with technology and innovative pedagogical strategies. This research exposes the case study of three Latin American universities that seek to identify problems or educational situations to be addressed and developed innovation proposals in exploring in the solution, through an international collaborative initiative with teams of research professors focused on developing educational innovations that inspire and train future professionals. The case study methodology has three phases: 1) case design, 2) case description and 3) case evaluation. The case is analyzed from two perspectives: international initiative managers and the faculty who collaborate in research with their colleagues from other universities using the funds for the awarded projects. The challenges presented are many: from the generation of faculty teams, communication and collaboration at a distance, differences in structure and schedules between universities, and more. However, the benefits have been equally many as synergies have been created not only between universities and within the institutions themselves, but also with companies; another benefit is the learning and knowledge generated by the collaboration is impacting the students, who are the ultimate goal and inspiration of all academic endeavors.
- 15 September 2021
- Published by Association for Computing Machinery (ACM)
- p. 103-109
Open AccessInternational collaboration between Latin American universities towards educational innovation in engineering: Case study
Collaboration between universities has become a driving force to develop and promote a culture of educational innovation with technology and innovative pedagogical strategies. This research exposes the case study of three Latin American universities that seek to identify problems or educational situations to be addressed and developed innovation proposals in exploring in the solution, through an international collaborative initiative with teams of research professors focused on developing educational innovations that inspire and train future professionals. The case study methodology has three phases: 1) case design, 2) case description and 3) case evaluation. The case is analyzed from two perspectives: international initiative managers and the faculty who collaborate in research with their colleagues from other universities using the funds for the awarded projects. The challenges presented are many: from the generation of faculty teams, communication and collaboration at a distance, differences in structure and schedules between universities, and more. However, the benefits have been equally many as synergies have been created not only between universities and within the institutions themselves, but also with companies; another benefit is the learning and knowledge generated by the collaboration is impacting the students, who are the ultimate goal and inspiration of all academic endeavors.
- Open Access
- 14 July 2021
- Published by IGLC
- p. 107-115
Understanding the Interaction Between Virtual Design, Construction and Lean Construction
- 14 July 2021
- Published by IGLC
- p. 107-115
Open AccessUnderstanding the Interaction Between Virtual Design, Construction and Lean Construction
- 1 January 2021
- Published by Elsevier in Waste Management
- Vol. 119, 267-274
Residential curbside waste collection programs design: A multicriteria and participatory approach using choosing by advantages
- 1 January 2021
- Published by Elsevier in Waste Management
- Vol. 119, 267-274
Residential curbside waste collection programs design: A multicriteria and participatory approach using choosing by advantages