Mubarak Mubarak
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Mubarak Mubarak has a total of 37 co-authors. Here are the top co-authors by number of shared publications:
Abdullah Abdullah
2 shared publications- Ahyin Bilhuda Dasopang
Department of Civil Engineering, Faculty of Engineering, Universitas Syiah Kuala, Banda Aceh 23111, Indonesia
2 shared publications - Alfa Taras Bulba2 shared publications
Azmeri Azmeri
2 shared publications- Cut Dwi Refika
Universitas Syiah Kuala, Engineering Faculty, Civil Engineering Department, Syech Abdur-Rauf No. 7 Darussalam, 23111, Banda Aceh, Indonesia
2 shared publications - Cut Zukhrina Oktaviani2 shared publications
Latest Publications
- Open Access
- 6 June 2026
- Published by Engineering, Technology & Applied Science Research in Engineering, Technology & Applied Science Research
- Vol. 16 (3) , 36796-36804
The Impact of Land Use Change on the Hydrological Response in a Mountainous Watershed Using the SCS-CN Model
The Geuni Watershed, a sub-basin of the Meureudu Watershed, has experienced recurrent flooding in recent years, indicating increasing hydrological vulnerability in mountainous tropical catchments. This study quantifies the effects of land-cover change and Watershed characteristics on flood discharge in the Geuni Watershed using a hydrological modeling approach. The Soil Conservation Service–Curve Number (SCS–CN) method was used to estimate direct runoff under different land-use scenarios, and spatial analysis was conducted using Geographic Information Systems (GIS). Rainfall data were processed to derive design storm events, and morphometric parameters were analyzed to evaluate Watershed response characteristics. The results indicate no significant increase in Curve Number (CN) values in areas where forest and mixed vegetation are converted to agricultural land and settlements. Steep topography and a relatively short time of concentration further intensify peak flow generation, leading to rapid flood onset in downstream areas. The findings demonstrate that flood occurrences in the Geuni Watershed are driven by the combined effects of high-intensity rainfall, unfavorable morphometric characteristics, and anthropogenic land-cover alteration. Within the Meureudu basin system, hydrological disturbances in the Geuni Subwatershed cumulatively contribute to basin-scale flood risk. The study highlights the need for integrated Watershed management strategies, including upstream conservation, reforestation, soil and water conservation measures, and land-use control to mitigate future flood hazards. The proposed approach provides an engineering-oriented, spatially explicit framework suitable for flood risk assessment in comparable tropical mountainous Watersheds.
- 6 June 2026
- Published by Engineering, Technology & Applied Science Research in Engineering, Technology & Applied Science Research
- Vol. 16 (3) , 36796-36804
Open AccessThe Impact of Land Use Change on the Hydrological Response in a Mountainous Watershed Using the SCS-CN Model
The Geuni Watershed, a sub-basin of the Meureudu Watershed, has experienced recurrent flooding in recent years, indicating increasing hydrological vulnerability in mountainous tropical catchments. This study quantifies the effects of land-cover change and Watershed characteristics on flood discharge in the Geuni Watershed using a hydrological modeling approach. The Soil Conservation Service–Curve Number (SCS–CN) method was used to estimate direct runoff under different land-use scenarios, and spatial analysis was conducted using Geographic Information Systems (GIS). Rainfall data were processed to derive design storm events, and morphometric parameters were analyzed to evaluate Watershed response characteristics. The results indicate no significant increase in Curve Number (CN) values in areas where forest and mixed vegetation are converted to agricultural land and settlements. Steep topography and a relatively short time of concentration further intensify peak flow generation, leading to rapid flood onset in downstream areas. The findings demonstrate that flood occurrences in the Geuni Watershed are driven by the combined effects of high-intensity rainfall, unfavorable morphometric characteristics, and anthropogenic land-cover alteration. Within the Meureudu basin system, hydrological disturbances in the Geuni Subwatershed cumulatively contribute to basin-scale flood risk. The study highlights the need for integrated Watershed management strategies, including upstream conservation, reforestation, soil and water conservation measures, and land-use control to mitigate future flood hazards. The proposed approach provides an engineering-oriented, spatially explicit framework suitable for flood risk assessment in comparable tropical mountainous Watersheds.
- Open Access
- 14 May 2026
- Published by Elsevier in SSRN Electronic Journal
Nature-Based Solutions for Integrated River Management and Flood Risk Reduction: A Modeling Approach
Nature-Based Solutions (NbS) have emerged as a sustainable approach for flood risk reduction and integrated river basin management under increasing climate variability and land-use change. This study develops an integrated river management model incorporating hydrological, hydraulic, spatial, ecological, and socio-economic components. The framework consists of eight key elements: hydrology, hydraulics, spatial analysis, erosion–sedimentation, land use, flood assessment, community participation, and NbS implementation. A combined modeling approach using regression analysis and socio-economic assessment was applied to evaluate the influence of community characteristics on river basin management (RBM) performance. The results demonstrate that proper river boundary delineation and NbS implementation significantly improve flood mitigation capacity by reducing peak discharge and surface runoff. Vegetation-based stabilization and upstream retention systems enhance infiltration and reduce erosion, while economically valuable vegetation increases community acceptance. The benefit–cost ratio of 4.68 indicates strong economic feasibility of NbS implementation. Furthermore, socio-economic variables—particularly education, income, and NbS knowledge—significantly influence community participation (p < 0.05). The study highlights that integrating eco-hydraulic modeling with community-based approaches provides a robust framework for sustainable and resilient river basin management in tropical regions.
- 14 May 2026
- Published by Elsevier in SSRN Electronic Journal
Open AccessNature-Based Solutions for Integrated River Management and Flood Risk Reduction: A Modeling Approach
Nature-Based Solutions (NbS) have emerged as a sustainable approach for flood risk reduction and integrated river basin management under increasing climate variability and land-use change. This study develops an integrated river management model incorporating hydrological, hydraulic, spatial, ecological, and socio-economic components. The framework consists of eight key elements: hydrology, hydraulics, spatial analysis, erosion–sedimentation, land use, flood assessment, community participation, and NbS implementation. A combined modeling approach using regression analysis and socio-economic assessment was applied to evaluate the influence of community characteristics on river basin management (RBM) performance. The results demonstrate that proper river boundary delineation and NbS implementation significantly improve flood mitigation capacity by reducing peak discharge and surface runoff. Vegetation-based stabilization and upstream retention systems enhance infiltration and reduce erosion, while economically valuable vegetation increases community acceptance. The benefit–cost ratio of 4.68 indicates strong economic feasibility of NbS implementation. Furthermore, socio-economic variables—particularly education, income, and NbS knowledge—significantly influence community participation (p < 0.05). The study highlights that integrating eco-hydraulic modeling with community-based approaches provides a robust framework for sustainable and resilient river basin management in tropical regions.
- Open Access
- 15 January 2026
- Published by CV. Popular Scientist in Disaster in Civil Engineering and Architecture
- Vol. 3 (1) , 89-103
Assessing Service Quality of a Type C Passenger Terminal Using Importance–Performance Analysis: A User-Based Approach
As a passenger terminal, Lueng Bata Mini-Bus Terminal in Banda Aceh serves as a vital hub for regional mobility and local economic activities. However, the increasing volume of users has highlighted several service-related shortcomings, including inadequate facilities, poor sanitation, and the lack of accurate departure information. This study aims to evaluate the terminal’s service quality from the users' perspective using the Importance-Performance Analysis (IPA) method. Primary data were collected through 250 respondents comprising passengers, drivers, local business operators, and community members who interact with the terminal. The findings reveal a Level of Suitability score of 78.561%, indicating that current service delivery falls short of user expectations. Several service attributes most notably, the availability of services information and the clarity of evacuation routes were identified as critical weaknesses that require immediate attention. These attributes were categorized in the IPA matrix as high-priority areas for improvement. The findings provide empirical evidence to support terminal upgrading decisions, particularly the need to align terminal status with actual service deman, with the ultimate goal of aligning operational performance more closely with user needs and expectations.
- 15 January 2026
- Published by CV. Popular Scientist in Disaster in Civil Engineering and Architecture
- Vol. 3 (1) , 89-103
Open AccessAssessing Service Quality of a Type C Passenger Terminal Using Importance–Performance Analysis: A User-Based Approach
As a passenger terminal, Lueng Bata Mini-Bus Terminal in Banda Aceh serves as a vital hub for regional mobility and local economic activities. However, the increasing volume of users has highlighted several service-related shortcomings, including inadequate facilities, poor sanitation, and the lack of accurate departure information. This study aims to evaluate the terminal’s service quality from the users' perspective using the Importance-Performance Analysis (IPA) method. Primary data were collected through 250 respondents comprising passengers, drivers, local business operators, and community members who interact with the terminal. The findings reveal a Level of Suitability score of 78.561%, indicating that current service delivery falls short of user expectations. Several service attributes most notably, the availability of services information and the clarity of evacuation routes were identified as critical weaknesses that require immediate attention. These attributes were categorized in the IPA matrix as high-priority areas for improvement. The findings provide empirical evidence to support terminal upgrading decisions, particularly the need to align terminal status with actual service deman, with the ultimate goal of aligning operational performance more closely with user needs and expectations.
- Open Access
- 15 January 2026
- Published by CV. Popular Scientist in Disaster in Civil Engineering and Architecture
- Vol. 3 (1) , 18-30
Assessment of Service Quality of Sinabang Ferry Port Based on Sinabang - Calang Route Users’ Perception
Sinabang Ferry Port serves as a vital transportation hub connecting Simeulue Island with the mainland Sumatra, especially in serving remote and underdeveloped areas. As passenger traffic increases, evaluating service quality becomes crucial to support port management improvements and increase user satisfaction. This study aims to analyze the level of service at Sinabang Ferry Port based on user satisfaction and identify service attributes that need to be prioritized for quality improvement. The data were analyzed using the Importance Performance Analysis (IPA) method with five dimensions of service quality, namely tangibles, reliability, responsiveness, assurance, and empathy. The number of respondents was set at 156 people using the Slovin formula based on the average weekly number of passengers. The results showed that the level of user satisfaction with Sinabang Ferry Port services obtained an average level of suitability (LoS) score of 85,13%, indicating that user may dissatisfaction with port services and the need for improvements. The attributes that need to be prioritized (Quadrant I) include facilities for people with disabilities, pregnant women, and the elderly, information about terminal layout, departures and arrivals, and the availability of security equipment, such as CCTV. Furthermore, the tangibles, reliability, and assurance dimensions require significant attention to enhance service quality. These results provide essential insights for port authorities in formulating targeted and sustainable strategies to strengthen ferry service management and support regional accessibility.
- 15 January 2026
- Published by CV. Popular Scientist in Disaster in Civil Engineering and Architecture
- Vol. 3 (1) , 18-30
Open AccessAssessment of Service Quality of Sinabang Ferry Port Based on Sinabang - Calang Route Users’ Perception
Sinabang Ferry Port serves as a vital transportation hub connecting Simeulue Island with the mainland Sumatra, especially in serving remote and underdeveloped areas. As passenger traffic increases, evaluating service quality becomes crucial to support port management improvements and increase user satisfaction. This study aims to analyze the level of service at Sinabang Ferry Port based on user satisfaction and identify service attributes that need to be prioritized for quality improvement. The data were analyzed using the Importance Performance Analysis (IPA) method with five dimensions of service quality, namely tangibles, reliability, responsiveness, assurance, and empathy. The number of respondents was set at 156 people using the Slovin formula based on the average weekly number of passengers. The results showed that the level of user satisfaction with Sinabang Ferry Port services obtained an average level of suitability (LoS) score of 85,13%, indicating that user may dissatisfaction with port services and the need for improvements. The attributes that need to be prioritized (Quadrant I) include facilities for people with disabilities, pregnant women, and the elderly, information about terminal layout, departures and arrivals, and the availability of security equipment, such as CCTV. Furthermore, the tangibles, reliability, and assurance dimensions require significant attention to enhance service quality. These results provide essential insights for port authorities in formulating targeted and sustainable strategies to strengthen ferry service management and support regional accessibility.
- Open Access
- 25 December 2025
- Published by Atlantis Press SARL
- p. 223-233
Analysis of the Relationship Between Heavy Equipment Supply Chain Variables in Road Construction Development
- 25 December 2025
- Published by Atlantis Press SARL
- p. 223-233
Open AccessAnalysis of the Relationship Between Heavy Equipment Supply Chain Variables in Road Construction Development
- Open Access
- 25 December 2025
- Published by Atlantis Press SARL
- p. 147-160
Strategic Transformation of Sustainable Housing: Prioritisation Analysis of Key Factors with AHP-MAGC Method for Green Future in Banda Aceh and Aceh Besar
- 25 December 2025
- Published by Atlantis Press SARL
- p. 147-160
Open AccessStrategic Transformation of Sustainable Housing: Prioritisation Analysis of Key Factors with AHP-MAGC Method for Green Future in Banda Aceh and Aceh Besar
- Open Access
- 10 December 2024
- Published by LPPM Unsyiah in Journal of The Civil Engineering Student
- Vol. 6 (3) , 130-136
Potensi Kemunculan Risiko Untuk Faktor Material, Peralatan, Metode Konstruksi, dan Tenaga Kerja Pada Proyek Jalan Lingkungan
Proyek jalan lingkungan merupakan proyek jalan umum yang dioperasikan untuk penyediaan layanan lalu lintas angkutan lingkungan. Sumber daya adalah fase penting dalam pelaksanaan dan faktor penentu pencapaian tujuan dan sasaran proyek. Oleh karenanya, perencanaan sumber daya proyek haruslah baik, tepat dan terorganisir demi memperoleh sasaran proyek. Baik buruk kinerja pekerjaan ditentukan oleh biaya, waktu dan mutu yang dicapai. Untuk memperoleh tujuan tersebut diperlukannya manajemen proyek. Namun pada waktu pelaksanaan proyek sering mengalami risiko dan oleh karena itu manajemen risiko perlu dilakukan guna meminimalisir risiko yang muncul. Hal lain juga menunjang munculnya risiko ialah adanya penyebaran pandemi virus Covid-19 yang meningkat pada tahun 2021 dan mempengaruhi waktu, biaya dan mutu proyek. Tujuan dari penelitian ini ialah mengetahui faktor risiko sumber daya dan risk frequency yang terjadi pada pelaksanaan proyek jalan lingkungan pada 4 Kabupaten/Kota di Provinsi Aceh. Data sekunder penelitian ini diperoleh dari hasil studi literatur, sedangkan data primer diperoleh dari jawaban responden pada kuesioner. Pengujian data dilakukan dengan uji data validitas dan reliabilitas kemudian dilakukan anaisis data deskriptif dan analisis Frequency Index. Berdasarkan hasil penelitian didapatkan 34 variabel risiko yang terjadi pada pelaksanaan proyek dan variabel risiko kenaikan harga material adalah variabel yang paling tertinggi dengan nilai FI diperoleh 0,730.
- 10 December 2024
- Published by LPPM Unsyiah in Journal of The Civil Engineering Student
- Vol. 6 (3) , 130-136
Open AccessPotensi Kemunculan Risiko Untuk Faktor Material, Peralatan, Metode Konstruksi, dan Tenaga Kerja Pada Proyek Jalan Lingkungan
Proyek jalan lingkungan merupakan proyek jalan umum yang dioperasikan untuk penyediaan layanan lalu lintas angkutan lingkungan. Sumber daya adalah fase penting dalam pelaksanaan dan faktor penentu pencapaian tujuan dan sasaran proyek. Oleh karenanya, perencanaan sumber daya proyek haruslah baik, tepat dan terorganisir demi memperoleh sasaran proyek. Baik buruk kinerja pekerjaan ditentukan oleh biaya, waktu dan mutu yang dicapai. Untuk memperoleh tujuan tersebut diperlukannya manajemen proyek. Namun pada waktu pelaksanaan proyek sering mengalami risiko dan oleh karena itu manajemen risiko perlu dilakukan guna meminimalisir risiko yang muncul. Hal lain juga menunjang munculnya risiko ialah adanya penyebaran pandemi virus Covid-19 yang meningkat pada tahun 2021 dan mempengaruhi waktu, biaya dan mutu proyek. Tujuan dari penelitian ini ialah mengetahui faktor risiko sumber daya dan risk frequency yang terjadi pada pelaksanaan proyek jalan lingkungan pada 4 Kabupaten/Kota di Provinsi Aceh. Data sekunder penelitian ini diperoleh dari hasil studi literatur, sedangkan data primer diperoleh dari jawaban responden pada kuesioner. Pengujian data dilakukan dengan uji data validitas dan reliabilitas kemudian dilakukan anaisis data deskriptif dan analisis Frequency Index. Berdasarkan hasil penelitian didapatkan 34 variabel risiko yang terjadi pada pelaksanaan proyek dan variabel risiko kenaikan harga material adalah variabel yang paling tertinggi dengan nilai FI diperoleh 0,730.
- 2 August 2024
- Published by Trans Tech Publications, Ltd. in Construction Technologies and Architecture
- Vol. 14, 25-32
The Stage of Function Analysis for Value engineering (ve) on the Rukoh Dam Steering Construction Project
Rukoh Dam is one of the structures that can increase the reliability of providing raw water for various purposes. The dam is expected to be able to accommodate excess water during the rainy season and anticipate water shortages during the dry season. The Rukoh dam is located in the flow of the Rukoh crew which will be assisted by the directional channels from the Inong Tiro crew dam to provide sufficient water drainage. This research aims to identify work items based on functions to ensure that the application of Value Engineering (Value Engineering) can or can not be carried out on the Rukoh Dam Irrigation Tunnel Construction Project Pidie Regency. The function analysis stage is the most important stage in value engineering because function analysis is what differentiates value engineering from other cost saving techniques. The process carried out is to identify work items through functional analysis based on their function in comparison of cost with value. From the Pareto analysis and graph, there are two high-cost work items, namely the Kr Inong supply and tunnel work. However, the cost-savings review was carried out only on suppletion duct work. At this stage of function analysis, it is known that the carrier channel structure work produces C/W ˃ 2.59, which means that it is indicated that there are unnecessary costs so that it can be continued to the next stage.
- 2 August 2024
- Published by Trans Tech Publications, Ltd. in Construction Technologies and Architecture
- Vol. 14, 25-32
The Stage of Function Analysis for Value engineering (ve) on the Rukoh Dam Steering Construction Project
Rukoh Dam is one of the structures that can increase the reliability of providing raw water for various purposes. The dam is expected to be able to accommodate excess water during the rainy season and anticipate water shortages during the dry season. The Rukoh dam is located in the flow of the Rukoh crew which will be assisted by the directional channels from the Inong Tiro crew dam to provide sufficient water drainage. This research aims to identify work items based on functions to ensure that the application of Value Engineering (Value Engineering) can or can not be carried out on the Rukoh Dam Irrigation Tunnel Construction Project Pidie Regency. The function analysis stage is the most important stage in value engineering because function analysis is what differentiates value engineering from other cost saving techniques. The process carried out is to identify work items through functional analysis based on their function in comparison of cost with value. From the Pareto analysis and graph, there are two high-cost work items, namely the Kr Inong supply and tunnel work. However, the cost-savings review was carried out only on suppletion duct work. At this stage of function analysis, it is known that the carrier channel structure work produces C/W ˃ 2.59, which means that it is indicated that there are unnecessary costs so that it can be continued to the next stage.
- 2 August 2024
- Published by Trans Tech Publications, Ltd. in Construction Technologies and Architecture
- Vol. 14, 17-24
Hazard and Risk Analysis of Main Dam Work of Rukoh Dam Construction Project Pidie Regency
The construction of the dam project poses a significant risk of workplace accidents, particularly due to the inherent dangers associated with large-scale construction. One such incident occurred at the Karaloe Dam site in South Sulawesi in 2019, resulting in the tragic death of a heavy equipment operator who fell from a height of 85 meters along with his machinery. This study aims to identify hazards and conduct a risk assessment of workplace accidents affecting construction, workers, communities, and the environment in the Main Dam Works of the Rukoh Dam Construction Project, Pidie Regency. The determination of hazards is qualitative, employing a case study approach through direct field observation. The Identification of Hazards Risk Assessment Determination of Risk Control and Opportunities (IBPRP) method is used, along with the determination of risk levels based on the risk matrix outlined in Minister of PUPR Regulation Number 10 of 2021. The analysis yielded 23 potential hazards, comprising 14 moderate-risk categories and 9 high-risk categories. However, following control measures such as engineering solutions, administrative protocols, and the utilization of personal protective equipment, the overall potential hazards have been mitigated to a low-risk level. The potential hazard with the highest risk level at the worksite is exposure to tire blowouts from heavy vehicles, specifically dump trucks.Keywords: Project Main Dam, Hazard Identification, Risk Assessment, Risk Level
- 2 August 2024
- Published by Trans Tech Publications, Ltd. in Construction Technologies and Architecture
- Vol. 14, 17-24
Hazard and Risk Analysis of Main Dam Work of Rukoh Dam Construction Project Pidie Regency
The construction of the dam project poses a significant risk of workplace accidents, particularly due to the inherent dangers associated with large-scale construction. One such incident occurred at the Karaloe Dam site in South Sulawesi in 2019, resulting in the tragic death of a heavy equipment operator who fell from a height of 85 meters along with his machinery. This study aims to identify hazards and conduct a risk assessment of workplace accidents affecting construction, workers, communities, and the environment in the Main Dam Works of the Rukoh Dam Construction Project, Pidie Regency. The determination of hazards is qualitative, employing a case study approach through direct field observation. The Identification of Hazards Risk Assessment Determination of Risk Control and Opportunities (IBPRP) method is used, along with the determination of risk levels based on the risk matrix outlined in Minister of PUPR Regulation Number 10 of 2021. The analysis yielded 23 potential hazards, comprising 14 moderate-risk categories and 9 high-risk categories. However, following control measures such as engineering solutions, administrative protocols, and the utilization of personal protective equipment, the overall potential hazards have been mitigated to a low-risk level. The potential hazard with the highest risk level at the worksite is exposure to tire blowouts from heavy vehicles, specifically dump trucks.Keywords: Project Main Dam, Hazard Identification, Risk Assessment, Risk Level
- Open Access
- 22 June 2023
- Published by LPPM Unsyiah in Journal of The Civil Engineering Student
- Vol. 5 (2) , 176-182
Analisis Frekuensi Indeks untuk Penilaian Potensi Kemunculan Risiko Pada Proyek Rumah Dhuafa
Analisis Frekuensi Indeks untuk Penilaian Potensi Kemunculan Risiko Pada Proyek Rumah Dhuafa
- 22 June 2023
- Published by LPPM Unsyiah in Journal of The Civil Engineering Student
- Vol. 5 (2) , 176-182
Open AccessAnalisis Frekuensi Indeks untuk Penilaian Potensi Kemunculan Risiko Pada Proyek Rumah Dhuafa
Analisis Frekuensi Indeks untuk Penilaian Potensi Kemunculan Risiko Pada Proyek Rumah Dhuafa