Alexandros Diamantidis
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Alexandros Diamantidis has a total of 35 co-authors. Here are the top co-authors by number of shared publications:
- Chrissoleon T. Papadopoulos
School of Economic Sciences, Aristotle University of Thessaloniki, Thessaloniki, Greece
5 shared publications - Stelios Koukoumialos
Department of Business Administration, University of Thessaly, 41500 Larissa, Greece
4 shared publications - Georgios Varlas
Department of Business Administration, University of the Aegean, 82100 Chios, Greece
3 shared publications - Michael J. Vidalis
University of the Aegean
3 shared publications - Stelios Koukoumialos
Department of Business Administration, University of Thessaly, Volos, Greece
3 shared publications - Evangelos Ioannidis
Department of Economics, Aristotle University of Thessaloniki, 541 24 Thessaloniki, Greece
2 shared publications
Latest Publications
- Open Access
Continuous-Time Markov Chain Modeling of Divergent Multi-Echelon Inventory Systems with Erlang Replenishment Processes
Background: Divergent inventory systems must balance product availability and operating costs under uncertain demand and replenishment. This study examines how replenishment-time variability and retailer-specific inventory decisions affect a two-echelon network. Methods: A continuous-time Markov chain model is developed for one saturated upstream supplier and multiple independent retailers with heterogeneous continuous-review policies, Poisson demand, Erlang-distributed replenishment lead times, and complete lost sales. A recursive matrix-analytic formulation constructs the generator matrix and yields stationary probabilities for calculating operational and economic performance measures. Analytical results are checked against simulation, and numerical experiments examine replenishment variability, rates, and order-up-to levels. Results: Within the settings investigated, reducing replenishment-time variability across retailers while preserving mean lead times increases throughput and reduces lost-sales and total operating costs. Reducing variability only at one retailer yields smaller savings, mainly through lower holding costs. Faster replenishment improves fill rates and reduces total operating costs, with diminishing marginal savings and benefits that depend on the order-up-to level. Conclusions: The framework supports exact steady-state evaluation under the stated assumptions. The findings support jointly assessing replenishment responsiveness and inventory policies using both cost and service measures, while targeting variability reductions according to retailer-specific performance effects.
Open AccessContinuous-Time Markov Chain Modeling of Divergent Multi-Echelon Inventory Systems with Erlang Replenishment Processes
Background: Divergent inventory systems must balance product availability and operating costs under uncertain demand and replenishment. This study examines how replenishment-time variability and retailer-specific inventory decisions affect a two-echelon network. Methods: A continuous-time Markov chain model is developed for one saturated upstream supplier and multiple independent retailers with heterogeneous continuous-review policies, Poisson demand, Erlang-distributed replenishment lead times, and complete lost sales. A recursive matrix-analytic formulation constructs the generator matrix and yields stationary probabilities for calculating operational and economic performance measures. Analytical results are checked against simulation, and numerical experiments examine replenishment variability, rates, and order-up-to levels. Results: Within the settings investigated, reducing replenishment-time variability across retailers while preserving mean lead times increases throughput and reduces lost-sales and total operating costs. Reducing variability only at one retailer yields smaller savings, mainly through lower holding costs. Faster replenishment improves fill rates and reduces total operating costs, with diminishing marginal savings and benefits that depend on the order-up-to level. Conclusions: The framework supports exact steady-state evaluation under the stated assumptions. The findings support jointly assessing replenishment responsiveness and inventory policies using both cost and service measures, while targeting variability reductions according to retailer-specific performance effects.
- Open Access
- 10 September 2026
- Published by MDPI AG in Applied Sciences
- Vol. 16 (18) , 9006
An Exact Continuous-Time Markov Chain Framework for Modeling and Performance Evaluation of Multi-Product Push–Pull Production Systems
Multi-product production systems require effective coordination among production, intermediate storage, downstream processing, and customer demand, particularly under stochastic operating conditions and finite capacity. Unlike existing analytical studies that mainly examine either single-product push–pull systems or multi-product manufacturing systems separately, this work develops an exact CTMC framework that jointly captures product variety, shared buffering, downstream parallelization, sequence-dependent setups, and machine unreliability. The system comprises an unreliable upstream machine with sequence-dependent setup changes, a finite intermediate buffer, a distribution center modeled as a pooled processing resource with (M) identical reliable channels, and dedicated finished-goods buffers serving product-specific demand. A high-dimensional continuous-time Markov chain is formulated, and a systematic algorithm is developed to construct the infinitesimal generator matrix and compute steady-state performance measures. Numerical experiments examine intermediate buffer capacity, downstream processing capacity, priority rules, and upstream machine reliability. Increasing buffer capacity from 0 to 20 increases total throughput from 0.5937 to 1.0988, whereas further expansion to 100 yields only 1.1606, while average work-in-process reaches 19.8524. Downstream capacity exhibits similar diminishing performance gains, while priority rules and machine reliability affect product-level and overall throughput. These findings highlight throughput–inventory trade-offs and demonstrate the framework’s applicability for evaluating alternative configurations.
- 10 September 2026
- Published by MDPI AG in Applied Sciences
- Vol. 16 (18) , 9006
Open AccessAn Exact Continuous-Time Markov Chain Framework for Modeling and Performance Evaluation of Multi-Product Push–Pull Production Systems
Multi-product production systems require effective coordination among production, intermediate storage, downstream processing, and customer demand, particularly under stochastic operating conditions and finite capacity. Unlike existing analytical studies that mainly examine either single-product push–pull systems or multi-product manufacturing systems separately, this work develops an exact CTMC framework that jointly captures product variety, shared buffering, downstream parallelization, sequence-dependent setups, and machine unreliability. The system comprises an unreliable upstream machine with sequence-dependent setup changes, a finite intermediate buffer, a distribution center modeled as a pooled processing resource with (M) identical reliable channels, and dedicated finished-goods buffers serving product-specific demand. A high-dimensional continuous-time Markov chain is formulated, and a systematic algorithm is developed to construct the infinitesimal generator matrix and compute steady-state performance measures. Numerical experiments examine intermediate buffer capacity, downstream processing capacity, priority rules, and upstream machine reliability. Increasing buffer capacity from 0 to 20 increases total throughput from 0.5937 to 1.0988, whereas further expansion to 100 yields only 1.1606, while average work-in-process reaches 19.8524. Downstream capacity exhibits similar diminishing performance gains, while priority rules and machine reliability affect product-level and overall throughput. These findings highlight throughput–inventory trade-offs and demonstrate the framework’s applicability for evaluating alternative configurations.
- Open Access
- 15 May 2026
- Published by MDPI AG in Mathematics
- Vol. 14 (10) , 1696
Analysis of a Serial Supply Network Operating Under VMI Policy with Stochastic Replenishment Times and External Demand
An algorithm based on matrix analytic methods for the exact numerical performance evaluation of a two-echelon vendor-managed inventory system with lost sales is presented in this paper. Both supply and demand uncertainties are taken into consideration. Lead times are modeled using a phase-type (Coxian) distribution with two phases, while the stochastic nature of external demand is captured with a compound Poisson distribution comprised of a pure Poisson arrival process and a discrete empirical distribution for the demand of individual customers. A computer program based on the algorithm is developed and then it is used for an extensive numerical investigation with a view to obtain insights of possible managerial importance.
- 15 May 2026
- Published by MDPI AG in Mathematics
- Vol. 14 (10) , 1696
Open AccessAnalysis of a Serial Supply Network Operating Under VMI Policy with Stochastic Replenishment Times and External Demand
An algorithm based on matrix analytic methods for the exact numerical performance evaluation of a two-echelon vendor-managed inventory system with lost sales is presented in this paper. Both supply and demand uncertainties are taken into consideration. Lead times are modeled using a phase-type (Coxian) distribution with two phases, while the stochastic nature of external demand is captured with a compound Poisson distribution comprised of a pure Poisson arrival process and a discrete empirical distribution for the demand of individual customers. A computer program based on the algorithm is developed and then it is used for an extensive numerical investigation with a view to obtain insights of possible managerial importance.
- Open Access
- 6 October 2025
- Published by MDPI AG in Mathematics
- Vol. 13 (19) , 3199
Analysis of a Three-Echelon Supply Chain System with Multiple Retailers, Stochastic Demand and Transportation Times
In this paper we present an exact numerical model for the evaluation of a three-echelon supply chain with multiple retailers. Poisson demand, exponentially distributed transportation times and lost sales at the retailers are assumed. The system is modeled as a continuous time Markov chain, and the analysis is based on matrix analytic methods. We analyze the infinitesimal generator matrix of the process and develop an algorithm for its construction. Performance measures for the system are calculated algorithmically from the stationary probabilities vector. The algorithm is used for an extensive numerical investigation of the system so that conclusions of managerial importance may be drawn.
- 6 October 2025
- Published by MDPI AG in Mathematics
- Vol. 13 (19) , 3199
Open AccessAnalysis of a Three-Echelon Supply Chain System with Multiple Retailers, Stochastic Demand and Transportation Times
In this paper we present an exact numerical model for the evaluation of a three-echelon supply chain with multiple retailers. Poisson demand, exponentially distributed transportation times and lost sales at the retailers are assumed. The system is modeled as a continuous time Markov chain, and the analysis is based on matrix analytic methods. We analyze the infinitesimal generator matrix of the process and develop an algorithm for its construction. Performance measures for the system are calculated algorithmically from the stationary probabilities vector. The algorithm is used for an extensive numerical investigation of the system so that conclusions of managerial importance may be drawn.
- 1 November 2023
- Published by IATED Academy in ICERI Proceedings
- Vol. 1, 3931-3939
SUPPORTING ALTERNATIVE FLIPPED LEARNING DESIGNS
- 1 November 2023
- Published by IATED Academy in ICERI Proceedings
- Vol. 1, 3931-3939
SUPPORTING ALTERNATIVE FLIPPED LEARNING DESIGNS
- 20 July 2022
- Published by Springer Nature in Operational Research
- Vol. 22 (5) , 4801-4827
Exact analysis of a push–pull system with multiple non identical retailers, a distribution center and multiple non identical unreliable suppliers with supply disruptions
- 20 July 2022
- Published by Springer Nature in Operational Research
- Vol. 22 (5) , 4801-4827
Exact analysis of a push–pull system with multiple non identical retailers, a distribution center and multiple non identical unreliable suppliers with supply disruptions
- 8 March 2021
- Published by Springer Nature in TOP
- Vol. 29 (3) , 799-832
Optimal inventory control policies of a two-stage push–pull production inventory system with lost sales under stochastic production, transportation, and external demand
- 8 March 2021
- Published by Springer Nature in TOP
- Vol. 29 (3) , 799-832
Optimal inventory control policies of a two-stage push–pull production inventory system with lost sales under stochastic production, transportation, and external demand
- 20 December 2019
- Published by Springer Nature in Operational Research
- Vol. 22 (1) , 703-740
Analysis of a two echelon supply chain with merging suppliers, a storage area and a distribution center with parallel channels
- 20 December 2019
- Published by Springer Nature in Operational Research
- Vol. 22 (1) , 703-740
Analysis of a two echelon supply chain with merging suppliers, a storage area and a distribution center with parallel channels
- 2 July 2019
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 58 (13) , 3881-3904
Performance evaluation of flow lines with non-identical and unreliable parallel machines and finite buffers
This paper examines serial production lines with unreliable non-identical parallel machines at each workstation and intermediate buffers with finite capacities. All machines are assumed to have exponential service times, times to failure and repair times. An efficient decomposition technique is introduced for the performance evaluation of such lines. Rather than replacing each parallel-machine workstation with an equivalent single-server workstation, the main contribution of this paper is the presentation of a direct approach to derive and apply decomposition equations directly for every parallel machine at each workstation. Experimental results indicate that such a method can provide a computationally efficient algorithm to analyse large serial unreliable multi-server production lines with a good accuracy compared against simulation and other available methods.
- 2 July 2019
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 58 (13) , 3881-3904
Performance evaluation of flow lines with non-identical and unreliable parallel machines and finite buffers
This paper examines serial production lines with unreliable non-identical parallel machines at each workstation and intermediate buffers with finite capacities. All machines are assumed to have exponential service times, times to failure and repair times. An efficient decomposition technique is introduced for the performance evaluation of such lines. Rather than replacing each parallel-machine workstation with an equivalent single-server workstation, the main contribution of this paper is the presentation of a direct approach to derive and apply decomposition equations directly for every parallel machine at each workstation. Experimental results indicate that such a method can provide a computationally efficient algorithm to analyse large serial unreliable multi-server production lines with a good accuracy compared against simulation and other available methods.