MTMehdi Tavakolan

Mehdi Tavakolan

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article

Previous Organizations / Institutes

The organizations / institutes from the scholar's other articles in the past ten years


Mehdi Tavakolan has a total of 32 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • A simulation-based approach to optimizing resource allocation and logistics in construction projects: a case study

    by Shayan Nikoukar, Mehdi Tavakolan

    Purpose: This research aims to address the challenge of inefficient decision-making in site layout planning and resource allocation for construction projects. Existing approaches often rely on mathematical models that produce unrealistic results or encounter limitations confined to the site itself. To overcome these constraints, this study proposes a simulation-based approach with a focus on automatically optimizing tower crane placement, depot locations, and supplier selection. The primary objective is to minimize project costs while enhancing overall efficiency and productivity. Design/methodology/approach: The implementation integrates a genetic algorithm and a discrete event simulation model featuring a central control kernel. Key considerations include project boundaries, site layout features, depot locations, and manufacturing and transportation capabilities. The simulation process assesses each solution, encompassing critical stages like manufacturing, transfer to depot, site transportation, and installation. The proposed approach is tested using an actual steel structure project in Tehran, Iran. Findings: Results demonstrate substantial cost reductions compared to the contractor plan, showcasing the superiority of the proposed simulation-based optimization approach. The findings underscore the practical applicability of the research, providing valuable insights for industry professionals to make informed decisions and enhance project outcomes in real-world construction projects. Originality/value: This integrated simulation-based optimization approach offers a robust framework for realistic and effective site layout planning and resource allocation in general steel construction projects. Its general simulation mechanism allows for easy expansion and application to similar projects, capable of assessing a large number of alternatives. The research contributes to the field by presenting a novel and effective method for addressing decision-making challenges in construction project planning and resource allocation.


  • An intelligent simulation-based framework for automated planning of concrete construction works

    by Sina Mohammadi, Mehdi Tavakolan, Banafsheh Zahraie

    Purpose: This paper proposes an innovative intelligent simulation-based construction planning framework that introduces a new approach to simulation-based construction planning.Design/methodology/approach: In this approach, the authors developed an ontological inference engine as an integrated part of a constraint-based simulation system that configures the construction processes, defines activities and manages resources considering a variety of requirements and constraints during the simulation. It allows for the incorporation of the latest project information and a deep level of construction planning knowledge in the planning. The construction planning knowledge is represented by an ontology and several semantic rules. Also, the proposed framework uses the project building information model (BIM) to extract information regarding the construction product and the relations between elements. The extracted information is then converted to an ontological format to be useable by the framework.Findings: The authors implemented the framework in a case study project and tested its usefulness and capabilities. It successfully generated the construction processes, activities and required resources based on the construction product, available resources and the planning rules. It also allowed for a variety of analyses regarding different construction strategies and resource planning. Moreover, 4D BIM models that provide a very good understanding of the construction plan can be automatically generated using the proposed framework.Originality/value: The active integration between BIM, discrete-event simulation (DES) and ontological knowledge base and inference engine defines a new class of construction simulation with expandable applications.


  • Open Access

    Heterogeneous or homogeneous? A modified decision-making approach in renewable energy investment projects

    by Abdolmajid Erfani, Mehdi Tavakolan, Ali Hassandokht Mashhadi, Pouria Mohammadi

    The continuous increase of energy consumption resulted in the unavoidable increase in demand for renewable energy (RE) investment projects in recent years. Although the necessity of developing alternative energy sources is clear, the government cannot afford the huge investment in RE investment projects without private sector participation. Therefore, analyzing the decision-making procedure from the investor's point of view is essential to improve this process. Numerous studies in the literature developed various multi-criteria decision-making approaches using expert's judgments to provide informed decisions on RE investment projects. While prior efforts are valuable, accounting heterogeneity impact with regard to experts' background and knowledge on results has not been examined. Therefore, this study aims to develop a modified decision-making approach in RE projects using an analytical hierarchy process to: (1) provide a comprehensive review of investors criteria in RE projects; (2) evaluate how the level of expertise of experts in RE subject has an impact on the achieved common solution; and (3) determine the best RE alternative in different scenarios. Then, Iran, as a case study is selected to illustrate the model practicability. The results indicate that those who have higher expertise in the subject are more concerned about the "consumption market", and "government supportive policies". Whereas economic factors remain the most challenging criteria in less expert participation views. Both groups chose 'wind energy' as the best alternative energy source for investment based on current Iran's energy market. It is anticipated that the developed methodology and its results can be used by (1) government and public agencies to understand the investors' concerns; (2) investors to make a more-informed risk-based decision in RE projects or other complex decision-making projects.


  • Developing an optimization financing cost-scheduling trade-off model in construction project

    by Mehdi Tavakolan, Shayan Nikoukar

    Time-cost trade-off analysis is one of the most challenging tasks of construction project planners. Project planners face complicated multivariate time-cost optimization problems that require simultaneous minimization of total project duration and total project cost while considering issues related to the optimal present value of profit. In addition, given the complexity of construction projects in recent years, clever management has become increasingly important in cases of project financing and scheduling. There are choices and limits that make it difficult for project planners to develop a proper financing plan considering project time status. Therefore, the methods of financing affect the project plan. Parameters such as interest rate, contract terms, and financing options (i.e., types of the loan) in the project construction period can change the final profit value of the project. Hence, a skilled planner should consider various effective parameters for scheduling projects. This study presents a hybrid meta-heuristic algorithm to solve a multi-objective optimization problem in construction project planning and financing. The main objective of the model is to present a Pareto chart that shows the trade-off between duration of the project and the financing cost by considering different durations for each activity of the project and various financing options. The model is first validated in a simple case study and then applied to a large-scale case study. The model shows the optimal solutions which have time and financing cost. For each optimal solution, the model will create a cash flow containing project (direct and indirect cost and payments) and financing flows (borrowed money and repayments of principal and interest) based on a work schedule. Finally, a sensitivity analysis is performed to examine the effects of changes in the various parameters of the project cash flow on the ultimate results. It is shown that the proposed model is superior to the existing models in finding better project planning solutions with lower total project duration and lower total project financing cost in the proposed construction project financing problems. In addition, the proposed model improves the solutions through generations and provides optimal solutions in acceptable processing time.


  • Using a hybrid system dynamics and interpretive structural modeling for risk analysis of design phase of the construction projects

    by Hannaneh Etemadinia, Mehdi Tavakolan

    Risks in construction projects are dynamic in nature and hence should be considered as a complex interrelated system rather than a set of separate individual factors. In this paper, a hybrid SD-ISM method is proposed in order to extend the structural systematic approach of Interpretive Structural Modeling with dynamic capabilities of System Dynamics to analyse the uncertainties in design phase of the construction projects. A mathematical model is developed, validated, and then applied to a case project. Using the sensitivity analysis, project risks are prioritized to identify the major risks which have relatively large influence on project behaviour. Then, quantitative analysis of individual risk factors and overall project risk are performed for the case project. It was shown that how considering the interrelated structures and dynamics of the overall project risk can help the managers for the accurate estimation of the project objectives such as its cost and completion time.