Agus Sugiyono
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Agus Sugiyono has a total of 68 co-authors. Here are the top co-authors by number of shared publications:
Ira Fitriana
Badan Riset dan Inovasi Nasional
3 shared publications- Prima Trie Wijaya
Research Center for Conversion and Conservation Energy - National Research and Innovation Agency
3 shared publications Adiarso
Center for Assessment of Process Industry and Energy, Agency for the Assessment and Application of Technology (BPPT) Building 720, Cluster of Technology Innovation and Business, Science and Technology Park, South Tangerang City, Banten, Indonesia
2 shared publications- Agus Nurrohim
Research Center for Conversion and Conservation Energy - National Research and Innovation Agency
2 shared publications - Ali Ahmudi
Department of Electrical Engineering, Faculty of Engineering, Universitas Indonesia, Depok, INDONESIA
2 shared publications - Edi Hilmawan
Department of Chemistry and Chemical Engineering, Kanazawa University
2 shared publications
Latest Publications
- 23 February 2026
- Published by Springer Nature in BioEnergy Research
- Vol. 19  (1) , 35
Advancing Sorghum-Based Bioethanol for the Energy Transition Program in Indonesia: Economic and Environmental Aspects
- 23 February 2026
- Published by Springer Nature in BioEnergy Research
- Vol. 19  (1) , 35
Advancing Sorghum-Based Bioethanol for the Energy Transition Program in Indonesia: Economic and Environmental Aspects
- Open Access
- 1 January 2026
- Published by Institute of Advanced Engineering and Science in Indonesian Journal of Electrical Engineering and Computer Science
- Vol. 41  (1) , 180-190
Enhancing wind energy prediction accuracy with a hybrid Weibull distribution and ANN model: a case study across ten locations in Java Island, Indonesia
Accurate wind speed forecasting is essential for optimizing renewable energy (RE) systems, especially in coastal and island regions with high variability. This study proposes a hybrid predictive model that combines Weibull distribution parameters with artificial neural networks (ANN) to enhance forecasting accuracy. Using ten years of hourly NASA POWER data from 10 locations across Java Island, 24 scenarios were tested with varying combinations of Weibull and meteorological variables. Results demonstrate that incorporating both Weibull shape (k) and scale (c) parameters significantly improves performance, with the best configuration (Scenario 1) achieving a MAPE of 0.44% in Garut. Excluding one or both parameters sharply reduced accuracy, with errors rising up to 35.12%. Beyond technical accuracy, the findings emphasize the practical relevance of Weibull-informed ANN models for energy planning. Reliable forecasts support better wind resource assessment, grid integration, and investment decisions, reducing uncertainties that often hinder wind power deployment. By providing accurate and stable predictions across diverse locations, this approach offers policymakers and planners a robust tool to accelerate RE development and meet national energy targets.
- 1 January 2026
- Published by Institute of Advanced Engineering and Science in Indonesian Journal of Electrical Engineering and Computer Science
- Vol. 41  (1) , 180-190
Open AccessEnhancing wind energy prediction accuracy with a hybrid Weibull distribution and ANN model: a case study across ten locations in Java Island, Indonesia
Accurate wind speed forecasting is essential for optimizing renewable energy (RE) systems, especially in coastal and island regions with high variability. This study proposes a hybrid predictive model that combines Weibull distribution parameters with artificial neural networks (ANN) to enhance forecasting accuracy. Using ten years of hourly NASA POWER data from 10 locations across Java Island, 24 scenarios were tested with varying combinations of Weibull and meteorological variables. Results demonstrate that incorporating both Weibull shape (k) and scale (c) parameters significantly improves performance, with the best configuration (Scenario 1) achieving a MAPE of 0.44% in Garut. Excluding one or both parameters sharply reduced accuracy, with errors rising up to 35.12%. Beyond technical accuracy, the findings emphasize the practical relevance of Weibull-informed ANN models for energy planning. Reliable forecasts support better wind resource assessment, grid integration, and investment decisions, reducing uncertainties that often hinder wind power deployment. By providing accurate and stable predictions across diverse locations, this approach offers policymakers and planners a robust tool to accelerate RE development and meet national energy targets.
- 10 December 2025
- Published by Aalborg University in International Journal of Sustainable Energy Planning and Management
- Vol. 47, 43-56
Strategies Toward Energy Transition in Indonesia
Coal remains the dominant source of electricity generation in Indonesia, accounting for around 55% of installed capacity. As a fossil fuel, coal contributes significantly to greenhouse gas (GHG) emissions, posing a challenge to Indonesia’s commitment to the Paris Agreement. Biomass co-firing in coal power plants offers a promising pathway to reduce GHG emissions. However, sustainable biomass supply is a major challenge due to Indonesia’s archipelagic geography, which causes regional disparities in power capacity, fuel types, and biomass potential. This study assesses the potential of multi-regional biomass supply in relation to emission reduction targets, using secondary data for provincial biomass waste inventories is assessed. The Low Emissions Analysis Platform (LEAP) model projects coal demand from 2025 to 2045 under two scenarios: business as usual (BAU) and biomass co-firing (BCF) with biomass shares of 5%, 10%, and 15%. Findings show that municipal and industrial waste alone cannot sustain long-term co-firing at the national level. Therefore, multi-regional supply-demand analysis is essential. Provinces such as Riau, North Kalimantan, Central Kalimantan, West Kalimantan, Papua, Bangka Belitung Islands, and Jambi are identified as surplus regions. A 15% biomass co-firing scenario could reduce emissions by 108 Mt of CO₂ by 2045 and lower emission intensity nationwide.
- 10 December 2025
- Published by Aalborg University in International Journal of Sustainable Energy Planning and Management
- Vol. 47, 43-56
Strategies Toward Energy Transition in Indonesia
Coal remains the dominant source of electricity generation in Indonesia, accounting for around 55% of installed capacity. As a fossil fuel, coal contributes significantly to greenhouse gas (GHG) emissions, posing a challenge to Indonesia’s commitment to the Paris Agreement. Biomass co-firing in coal power plants offers a promising pathway to reduce GHG emissions. However, sustainable biomass supply is a major challenge due to Indonesia’s archipelagic geography, which causes regional disparities in power capacity, fuel types, and biomass potential. This study assesses the potential of multi-regional biomass supply in relation to emission reduction targets, using secondary data for provincial biomass waste inventories is assessed. The Low Emissions Analysis Platform (LEAP) model projects coal demand from 2025 to 2045 under two scenarios: business as usual (BAU) and biomass co-firing (BCF) with biomass shares of 5%, 10%, and 15%. Findings show that municipal and industrial waste alone cannot sustain long-term co-firing at the national level. Therefore, multi-regional supply-demand analysis is essential. Provinces such as Riau, North Kalimantan, Central Kalimantan, West Kalimantan, Papua, Bangka Belitung Islands, and Jambi are identified as surplus regions. A 15% biomass co-firing scenario could reduce emissions by 108 Mt of CO₂ by 2045 and lower emission intensity nationwide.
- Open Access
- 2 January 2025
- Published by PT. Heca Sentra Analitika in Leuser Journal of Environmental Studies
- Vol. 3  (1) , 1-19
Optimizing Potential Supply Chain of Biomass Agricultural Waste for Co-firing of Coal Power Plant Using MCDA, GIS, and Linear Programming in the Java and Sumatra Islands, Indonesia
The development of renewable energy is a key priority for the Indonesian government and many other nations. Utilizing biomass as a co-firing fuel in coal-fired power plants (PLTUs) offers a viable pathway to meet renewable energy targets in the electricity sector. Co-firing technology involves substituting coal with biomass at specific ratios while maintaining the operational quality and efficiency of the power plants. Indonesia plans to implement a co-firing program in 114 PLTUs, with a combined capacity of 18.1 GW, requiring approximately 9 million tons of biomass annually. This study aims to develop a biomass supply chain model for co-firing, focusing on transportation cost optimization. Geographic Information Systems (GIS), Multi-Criteria Decision Analysis (MCDA), and Linear Programming are employed to map biomass potential from agricultural waste, identify optimal storage and factory locations, calculate the shortest distances to PLTUs, and design an efficient supply chain. Key biomass sources considered include agricultural waste from rice, corn, cassava, palm oil, coconut, sugarcane, and rubber. The study concentrates on co-firing in the Java and Sumatra regions, which house 14 and 12 PLTUs, respectively. Assuming a 5% biomass mix, the total annual bio-pellet demand is estimated at 3.34 million tons. By contrast, the annual production capacity of bio-pellets is calculated to be 143.58 million tons, indicating a surplus supply. Optimization results confirm that the available biomass supply can adequately meet the co-firing requirements for PLTUs in Java and Sumatra. The study also identifies optimal locations for storage facilities and bio-pellet factories near PLTU sites, enhancing supply chain efficiency. By integrating data on biomass potential, storage, factory, and PLTU locations, this research facilitates the design of an effective and efficient biomass supply chain, contributing to the broader goal of renewable energy development.
- 2 January 2025
- Published by PT. Heca Sentra Analitika in Leuser Journal of Environmental Studies
- Vol. 3  (1) , 1-19
Open AccessOptimizing Potential Supply Chain of Biomass Agricultural Waste for Co-firing of Coal Power Plant Using MCDA, GIS, and Linear Programming in the Java and Sumatra Islands, Indonesia
The development of renewable energy is a key priority for the Indonesian government and many other nations. Utilizing biomass as a co-firing fuel in coal-fired power plants (PLTUs) offers a viable pathway to meet renewable energy targets in the electricity sector. Co-firing technology involves substituting coal with biomass at specific ratios while maintaining the operational quality and efficiency of the power plants. Indonesia plans to implement a co-firing program in 114 PLTUs, with a combined capacity of 18.1 GW, requiring approximately 9 million tons of biomass annually. This study aims to develop a biomass supply chain model for co-firing, focusing on transportation cost optimization. Geographic Information Systems (GIS), Multi-Criteria Decision Analysis (MCDA), and Linear Programming are employed to map biomass potential from agricultural waste, identify optimal storage and factory locations, calculate the shortest distances to PLTUs, and design an efficient supply chain. Key biomass sources considered include agricultural waste from rice, corn, cassava, palm oil, coconut, sugarcane, and rubber. The study concentrates on co-firing in the Java and Sumatra regions, which house 14 and 12 PLTUs, respectively. Assuming a 5% biomass mix, the total annual bio-pellet demand is estimated at 3.34 million tons. By contrast, the annual production capacity of bio-pellets is calculated to be 143.58 million tons, indicating a surplus supply. Optimization results confirm that the available biomass supply can adequately meet the co-firing requirements for PLTUs in Java and Sumatra. The study also identifies optimal locations for storage facilities and bio-pellet factories near PLTU sites, enhancing supply chain efficiency. By integrating data on biomass potential, storage, factory, and PLTU locations, this research facilitates the design of an effective and efficient biomass supply chain, contributing to the broader goal of renewable energy development.
- Open Access
- 5 October 2024
- Published by Center of Biomass and Renewable Energy Scientia Academy in International Journal of Renewable Energy Development
- Vol. 13  (6) , 1136-1148
Renewable energy in sustainable cities: Challenges and opportunities by the case study of Nusantara Capital City (IKN)
Indonesia's future IKN capital might be sustainable, low-carbon, and climate-resilient. The Low Emissions Analysis Platform (LEAP) simulates energy efficiency in various demand sectors, renewable energy, and sustainable transportation solutions. Sustainable cars, such as renewable-energy-powered electric and green hydrogen-powered vehicles, can reduce energy consumption by 43% in 2045 and 33% in 2060, respectively, compared to BAU. GHG emissions per capita will drop 70% in 2045 and 63% in 2060. In the net-zero emission (NZE) scenario, IKN can reach 100% green energy by 2045 with a 4.4 GW solar power plant, a 0.92 GWh BESS, and a full load hour capability of 4 hours. We will use 1.1 GW of hydropower and 143 MW of wind power by 2045. In 2060, hydropower will be 2.8 GW, wind power will be 184 MW, and solar power will be 8 GW with 1.6 GWh of BESS. Lack of legislation, technical expertise, high prices, inadequate grid infrastructure, and insufficient renewable electricity restrict BESS use in Indonesia. Solar energy installation requirements, subsidies, and off-grid project incentives can all help ease BESS use. Forecasts predict 0.53 GW of rooftop solar PV capacity by 2045 and 3.35 GW by 2060. Net metering and solar tariffs boost rooftop solar system profitability. One ton of green hydrogen production requires 55.7 MWh from a solar power plant. Solar power plant capacity will rise to 0.49 GW by 2045, producing 19,359 tons of green hydrogen, and almost quintuple to 89,594 tons by 2060. Hydrogen generation, storage, transit, and distribution require specific infrastructure due to high capital costs and a lack of networks, yet interest in them is growing.
- 5 October 2024
- Published by Center of Biomass and Renewable Energy Scientia Academy in International Journal of Renewable Energy Development
- Vol. 13  (6) , 1136-1148
Open AccessRenewable energy in sustainable cities: Challenges and opportunities by the case study of Nusantara Capital City (IKN)
Indonesia's future IKN capital might be sustainable, low-carbon, and climate-resilient. The Low Emissions Analysis Platform (LEAP) simulates energy efficiency in various demand sectors, renewable energy, and sustainable transportation solutions. Sustainable cars, such as renewable-energy-powered electric and green hydrogen-powered vehicles, can reduce energy consumption by 43% in 2045 and 33% in 2060, respectively, compared to BAU. GHG emissions per capita will drop 70% in 2045 and 63% in 2060. In the net-zero emission (NZE) scenario, IKN can reach 100% green energy by 2045 with a 4.4 GW solar power plant, a 0.92 GWh BESS, and a full load hour capability of 4 hours. We will use 1.1 GW of hydropower and 143 MW of wind power by 2045. In 2060, hydropower will be 2.8 GW, wind power will be 184 MW, and solar power will be 8 GW with 1.6 GWh of BESS. Lack of legislation, technical expertise, high prices, inadequate grid infrastructure, and insufficient renewable electricity restrict BESS use in Indonesia. Solar energy installation requirements, subsidies, and off-grid project incentives can all help ease BESS use. Forecasts predict 0.53 GW of rooftop solar PV capacity by 2045 and 3.35 GW by 2060. Net metering and solar tariffs boost rooftop solar system profitability. One ton of green hydrogen production requires 55.7 MWh from a solar power plant. Solar power plant capacity will rise to 0.49 GW by 2045, producing 19,359 tons of green hydrogen, and almost quintuple to 89,594 tons by 2060. Hydrogen generation, storage, transit, and distribution require specific infrastructure due to high capital costs and a lack of networks, yet interest in them is growing.
- 1 January 2024
- Published by AIP Publishing in AIP Conference Proceedings
- Vol. 3080  (1)
Multi-regional analysis of biomass agriculture waste potential and bio-pellet development for electricity in Indonesia
The potential of renewable energy sources in each region would be different; hence, it requires multi-regional analysis in energy management, including inter-re
- 1 January 2024
- Published by AIP Publishing in AIP Conference Proceedings
- Vol. 3080  (1)
Multi-regional analysis of biomass agriculture waste potential and bio-pellet development for electricity in Indonesia
The potential of renewable energy sources in each region would be different; hence, it requires multi-regional analysis in energy management, including inter-re
- Open Access
- 1 January 2023
- Published by AIP Publishing in AIP Conference Proceedings
- Vol. 2517  (1)
The role of battery energy storage system in supporting the net-zero emission target in Indonesia’s electricity system
Government of Indonesian has launched a National Grand Energy Strategy that will accelerate the use of new and renewable energy for power generation. Besides that, there are many discourses on implementing a net-zero emission target in 2050 or after. Various large-scale power generation options can be utilized to replace coal and gas-based power generation, such as hydro, geothermal, solar, wind and nuclear power generation towards net-zero emissions. The prospects for these various options are evaluated based on generation cost using the LEAP (Low Emissions Analysis Platform) model. The 4 scenarios were evaluated, i.e. business as usual (BAU), solar power plant with battery energy storage system (BESS), nuclear power plant (NPP), and coal and gas power plant with carbon capture, utilization and storage (CCUS). The development of intermittent solar power plant cannot be carried out on a large scale unless coupled with a BESS. The cheapest generation costs are in the BAU scenario, but cannot reach the net-zero emission target. The next three scenarios can be used as an option to achieve the net-zero emission target. The NPP scenario has a lower cost than the CCUS and BESS scenarios, but there are challenges in public acceptance. The CCUS scenario is difficult to implement because it is still based on fossil fuels and the generation costs are also high. The BESS scenario can compete in generation costs with the NPP scenario, if BESS investment costs can continue to decline in the long term.
- 1 January 2023
- Published by AIP Publishing in AIP Conference Proceedings
- Vol. 2517  (1)
Open AccessThe role of battery energy storage system in supporting the net-zero emission target in Indonesia’s electricity system
Government of Indonesian has launched a National Grand Energy Strategy that will accelerate the use of new and renewable energy for power generation. Besides that, there are many discourses on implementing a net-zero emission target in 2050 or after. Various large-scale power generation options can be utilized to replace coal and gas-based power generation, such as hydro, geothermal, solar, wind and nuclear power generation towards net-zero emissions. The prospects for these various options are evaluated based on generation cost using the LEAP (Low Emissions Analysis Platform) model. The 4 scenarios were evaluated, i.e. business as usual (BAU), solar power plant with battery energy storage system (BESS), nuclear power plant (NPP), and coal and gas power plant with carbon capture, utilization and storage (CCUS). The development of intermittent solar power plant cannot be carried out on a large scale unless coupled with a BESS. The cheapest generation costs are in the BAU scenario, but cannot reach the net-zero emission target. The next three scenarios can be used as an option to achieve the net-zero emission target. The NPP scenario has a lower cost than the CCUS and BESS scenarios, but there are challenges in public acceptance. The CCUS scenario is difficult to implement because it is still based on fossil fuels and the generation costs are also high. The BESS scenario can compete in generation costs with the NPP scenario, if BESS investment costs can continue to decline in the long term.
- Open Access
- 26 June 2022
- Published by Politeknik Sukabumi in JTERA (Jurnal Teknologi Rekayasa)
- Vol. 7  (1) , 65-72
Peran Kendaraan Bermotor Listrik Berbasis Baterai dalam Mengurangi Permintaan BBM di Indonesia
Peran Kendaraan Bermotor Listrik Berbasis Baterai dalam Mengurangi Permintaan BBM di Indonesia
- 26 June 2022
- Published by Politeknik Sukabumi in JTERA (Jurnal Teknologi Rekayasa)
- Vol. 7  (1) , 65-72
Open AccessPeran Kendaraan Bermotor Listrik Berbasis Baterai dalam Mengurangi Permintaan BBM di Indonesia
Peran Kendaraan Bermotor Listrik Berbasis Baterai dalam Mengurangi Permintaan BBM di Indonesia
- Open Access
- 1 May 2021
- Published by IOP Publishing in IOP Conference Series: Earth and Environmental Science
- Vol. 753  (1) , 012011
Decarbonizing the electricity system in Sumatra region using nuclear and renewable energy based power generation
The Indonesian national energy policy mandates that the new and renewable energy in 2025 reaches a share of 23% and in 2050 rises a share of 31% in the primary energy mix. The energy mix by types is further detailed in the national energy plan (RUEN). Since Indonesia is committed to participating in efforts to mitigate global climate change, the energy sector is expected to contribute to the greenhouse gas (GHG) reduction target of up to 29% (unconditional) and 41% (conditional) under Business as Usual (BAU) by 2030. The use of nuclear power and renewable energy-based power generations can reduce GHG emissions in the electricity sector. Sumatra region is a potential region for the development of renewable energy. In this study, various options were made to reduce GHG emissions by utilizing nuclear power and renewable energy-based power generations. Assuming that electricity planning in the Sumatra region, as stated in the Electricity Supply Business Plan (RUPTL) from PLN as a Business as Usual (BaU) scenario, then an alternative scenario can be made by replacing coal power generation using low-carbon power generation. Hydropower, geothermal, and nuclear power generations are prospective options as they have large capacity per unit. At the same time, the utilization of other renewable energy sources still face some challenges due to the intermittent generation. The east coast regions of Sumatra that do not have the potential hydropower and geothermal sources, suit for nuclear power generation.
- 1 May 2021
- Published by IOP Publishing in IOP Conference Series: Earth and Environmental Science
- Vol. 753  (1) , 012011
Open AccessDecarbonizing the electricity system in Sumatra region using nuclear and renewable energy based power generation
The Indonesian national energy policy mandates that the new and renewable energy in 2025 reaches a share of 23% and in 2050 rises a share of 31% in the primary energy mix. The energy mix by types is further detailed in the national energy plan (RUEN). Since Indonesia is committed to participating in efforts to mitigate global climate change, the energy sector is expected to contribute to the greenhouse gas (GHG) reduction target of up to 29% (unconditional) and 41% (conditional) under Business as Usual (BAU) by 2030. The use of nuclear power and renewable energy-based power generations can reduce GHG emissions in the electricity sector. Sumatra region is a potential region for the development of renewable energy. In this study, various options were made to reduce GHG emissions by utilizing nuclear power and renewable energy-based power generations. Assuming that electricity planning in the Sumatra region, as stated in the Electricity Supply Business Plan (RUPTL) from PLN as a Business as Usual (BaU) scenario, then an alternative scenario can be made by replacing coal power generation using low-carbon power generation. Hydropower, geothermal, and nuclear power generations are prospective options as they have large capacity per unit. At the same time, the utilization of other renewable energy sources still face some challenges due to the intermittent generation. The east coast regions of Sumatra that do not have the potential hydropower and geothermal sources, suit for nuclear power generation.
- Open Access
- 1 February 2021
- Published by IOP Publishing in IOP Conference Series: Materials Science and Engineering
- Vol. 1053  (1) , 012099
Development of Natural Gas Infrastructure to Enhance National Energy Security in Indonesia
The current use of energy in Indonesia highly still depends on fossil-derived energy. Thus, policies to reduce the use of fossil energy towards the use of new and renewable energy (NRE), which is more environmentally friendly, receive great concern. The government encourages the use of low-carbon technology following up the Paris Agreement to reduce greenhouse gas (GHG) emissions by 29% (without assistance) and by 41% (with international assistance) under Business as Usual (BAU) by 2030. However, accelerating the utilization of renewable energy still faces some obstacles because the economic price of NRE is still more expensive than that of fossil energy. The most likely transition policy is to substitute the use of oil and fuel to natural gas through improving natural gas infrastructure. This transition is following the Sustainable Development Goal (SDG) which guides the achievement of global goals until 2030, namely to ensure access to affordable, reliable, sustainable, and modern energy for all. The development of natural gas infrastructure is currently in an early stage (point to point scheme) and is expected to develop into a hub and spoke scheme towards multiple networks. The more developed infrastructure will further enhance national energy security in the long run.
- 1 February 2021
- Published by IOP Publishing in IOP Conference Series: Materials Science and Engineering
- Vol. 1053  (1) , 012099
Open AccessDevelopment of Natural Gas Infrastructure to Enhance National Energy Security in Indonesia
The current use of energy in Indonesia highly still depends on fossil-derived energy. Thus, policies to reduce the use of fossil energy towards the use of new and renewable energy (NRE), which is more environmentally friendly, receive great concern. The government encourages the use of low-carbon technology following up the Paris Agreement to reduce greenhouse gas (GHG) emissions by 29% (without assistance) and by 41% (with international assistance) under Business as Usual (BAU) by 2030. However, accelerating the utilization of renewable energy still faces some obstacles because the economic price of NRE is still more expensive than that of fossil energy. The most likely transition policy is to substitute the use of oil and fuel to natural gas through improving natural gas infrastructure. This transition is following the Sustainable Development Goal (SDG) which guides the achievement of global goals until 2030, namely to ensure access to affordable, reliable, sustainable, and modern energy for all. The development of natural gas infrastructure is currently in an early stage (point to point scheme) and is expected to develop into a hub and spoke scheme towards multiple networks. The more developed infrastructure will further enhance national energy security in the long run.