BEBernard Espion

Bernard Espion

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article

Previous Organizations / Institutes

The organizations / institutes from the scholar's other articles in the past ten years


Bernard Espion has a total of 51 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Assessment of heritage value and resistance of a 1935 Vierendeel steel railway bridge

    by Philippe Van Bogaert, Bernard Espion

    From 1923 to 1960, a significant number of “Vierendeel” steel railway bridges have been built in Katanga and Belgium. In the town of Mechelen, three railway lines cross the Mechelen-Leuven canal, offering a distinctive illustration of this type of application. Two of these are 1953-built bridges; suffering severe deterioration, they were refurbished in 2021–2022. The third and oldest bridge (L25), erected in 1935, was found to have numerous cracks in the vertical members and to exhibit significant corrosion damage in auxiliary parts. As a result, doubts about this bridge capacity to carry the required loads developed. The authority responsible for the care of monuments encourages the conservation of these historic structures. An extensive experimental and numerical examination was used to analyze the material characteristics, load carrying capacity and fatigue strength. An independent committee provided guidance on the heritage value of the bridge, reviewed critically the results of the analyses, issued an opinion on the origins of cracks and proposed the refurbishment of the bridge. This paper summarizes the findings of this committee.


  • Open Access

    Statistical modelling of the influence of the stress ratio on the fatigue strength estimation. Application on specimens coming from riveted structures.

    by Paul Dario Toasa Caiza, Stephane Sire, Bernard Espion, Muriel Ragueneau

    As testimony of the engineering development during the industrial revolution, old riveted bridges are maintained by several policies worldwide and in some cases because of their historical importance protected. A main concern of these policies is preserving their structural integrity, which depends on a fatigue assessment of their components and assemblies. In these structures, the stress ratio considerably affects the fatigue strength, but the actual standards do not consider this fact. Some deterministic models have been proposed in order to overcome this issue. However, they are based on restrictive and empirical assumptions. Moreover, no statistical considerations are made, although fatigue strength is a random variable. In this paper, the suggested models are studied and then enhanced by statistical considerations. Finally, a statistical fatigue strength model as function of the stress ratio is proposed and applied on riveted specimens from old German Bridges and newly manufactured specimens of steel S235.

  • Assessing the durability and residual carrying capacity of a prestressed footbridge built in Brussels (Belgium) in 1944

    by Bernard Espion, Michel Provost

    In October 1944, a 20.9m span footbridge was built in Brussels (Belgium) across the Canal Charleroi-Brussels: it was the first applications of prestressing by post-tensioning to a concrete bridge-type structure in Belgium, and one of the earliest worldwide. The tendons consisted of high strength steel wires 5mm in diameter anchored in so-called « Sandwich » anchorages, a system of post-tensioning developed in Belgium from 1942 onwards by Professor Gustave Magnel with the Blaton-Aubert Company. This system will be extensively used in Belgium during the next 20 years, and was also applied to build the first prestressed concrete bridge in the US in 1949 (Walnut Lane, Philadelphia). The dead weight of the footbridge is 60 tons. Some years ago, the local Authority had decided that this footbridge had to be replaced. This 1944 prestressed concrete footbridge was obviously an engineering heritage structure, but preserving it in use somewhere else raised many problems in terms of reliability. The authors therefore proposed to the Authority to study in depth this historical structure in order to collect information that could be useful to assess the durability and actual carrying capacity of concrete structures built with the same prestressing technology in the period 1945-1965, many of them still standing. The paper presents the main findings from the load testing of this footbridge, that took place in October 2018, and the results from the characterization of its materials.


  • Civil engineering heritage: country profile – Belgium

    by Bernard Espion, Robin Engels, Michel Provost

    This paper is a review of the civil engineering heritage of Belgium, one of the series of country profiles being published by Engineering History and Heritage. It is presented under four headings: ‘Belgium’s major civil engineering achievements’, ‘National and regional recognition of engineering heritage’, ‘Exemplar conservation of engineering structures’ and ‘Information sources for engineering heritage’. This profile discusses engineering structures of heritage importance, including the following, all built before 1945: several canals (in chronological order: from Brussels to the Rupel; from Pommerœl to Antoing; from Charleroi to Brussels; the Centre canal, with its four hydraulic boat lifts; the Albert canal, from Liège to Antwerp, with its Vierendeel all welded bridges); the Palace of Justice in Brussels; the Gileppe dam; the forts of Meuse River; the Mativa footbridge in Liège; the hall of exhibitions Palais 5 in Brussels; and the first prestressed concrete railway bridge project in the world. The profile lists organisations in Belgium active in helping conserve its engineering heritage, including the Flemish Association for Industrial Archaeology, Museum of Industry, Work and Textiles, Patrimoine Industriel Wallonie-Bruxelles and BruxellesFabriques/BrusselFabriek, and concludes with a short list of sources of information allowing the reader to find further information about Belgium’s civil engineering heritage.


  • Early Prestressed Steel–Concrete Composite Continuous Bridges in Belgium

    by Y. Rammer, B. Espion

    Book chapter written by Y. Rammer and B. Espion and published in Engineering History and Heritage Structures – Viewpoints and Approaches, International Association for Bridge and Structural Engineering (IABSE), 2017.


  • Pioneering hypar thin shell concrete roofs in the 1930s

    by Bernard Espion

    The paper explores the conditions of emergence and first applications of thin hypar concrete shells. They appeared in France in the 1930s in the context of building hangars for aircraft and roofs for workshops at air or naval bases. Two French engineers were mainly involved in the development of this form: BERNARD LAFFAILLE, who began designing conoid shells in 1927 but actually never got the opportunity to build concrete hypars, and FERNAND AIMOND, who established the membrane theory of the hypar in 1932 and applied it to design and construct several HP roofs in 1934–1939. The paper describes these forgotten structures and recalls the influence of AIMOND's contributions from the mid‐1930s on the subsequent widespread adoption of the hypar.Anfänge der dünnen Hyparschalen aus Beton in den 1930er‐JahrenDieser Beitrag beschäftigt sich mit den Bedingungen der Entstehung und den ersten Anwendungen von dünnen Hyparschalen (HP‐Schalen) aus Beton. Diese ergaben sich in den 1930er‐Jahren in Frankreich im Zusammenhang mit der Errichtung von Flugzeughangars und Werkstattdächern für Flugplätze und Flottenstützpunkte. Es waren zwei französische Ingenieure, die hauptsächlich an der Entwicklung dieser neuen Bauart beteiligt waren: BERNARD LAFFAILLE, der 1927 mit dem Entwurf von Konoidschalen begann, jedoch nie die Gelegenheit hatte, Hyparschalen aus Beton zu bauen, und FERNAND AIMOND, der 1932 die Membrantheorie der Hyparschalen etabliert hat und diese auch in den Jahren 1934‐1939 für den Entwurf und die Errichtung zahlreicher HP‐Schalendächer angewendet hat. Im Beitrag werden diese heute teilweise in Vergessenheit geratenen Konstruktionen beschrieben und daran erinnert, welchen Einfluss AIMOND seit Mitte der 1930er‐Jahre auf die anschließende verbreitete Anwendung von Hyparschalen hatte.


  • Editorial

    by Bernard Espion

    SCOPUS: ed.jinfo:eu-repo/semantics/publishe


  • Three historic railway bridges in Katanga, DR Congo

    by Bernard Espion, Michel Provost, Olivier Bastin, Philippe Bouillard

    The crossing of rivers in Katanga (Democratic Republic of Congo) by railway lines in the 1920s and 1930s gave Belgian engineers and contractors the opportunity to build record spans for railway bridges. The crossing of the Lualaba River at Bukama consists of four Vierendeel steel girders each with a 62 m span, which were the largest of their type at the time of their erection in 1925. The crossing of the Lualaba at Kongolo, built in 1937–1939, required a 495 m long reinforced concrete continuous beam bridge with 14 spans, the largest measuring 70 m. It was the first significant concrete beam bridge constructed with a travelling gantry supporting movable formwork. The crossing of the Lukaga River (1938–1939) is a three-span concrete bridge with the 70 m long central span built using the cantilever method, which makes this bridge the oldest of its type in the world. This paper highlights the landmark characteristics of these forgotten bridges.