Zuhaila Mat Yasin
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Zuhaila Mat Yasin has a total of 47 co-authors. Here are the top co-authors by number of shared publications:
Titik Khawa Abdul Rahman
Faculty of Electrical Engineering, University of King Abdulaziz, Jeddah, Saudi Arabia
5 shared publications- Zuhaina Zakaria
Universiti Teknologi MARA
5 shared publications - Nur Ashida Salim
Universiti Teknologi MARA (UiTM)
4 shared publications - Hasmaini Mohamad
Power System Planning and Operation Research Group, Faculty of Electrical Engineering, Universiti Teknologi Mara, Shah Alam 40450, Selangor, Malaysia
3 shared publications - Titik Khawa Abdul Rahman
Asia e University
3 shared publications - Nur Fadilah Ab Aziz
Institute of Power Engineering (IPE), Universiti Tenaga Nasional, Jalan IKRAM-UNITEN, Kajang 43000, Selangor, Malaysia
2 shared publications
Latest Publications
- Open Access
- 1 September 2024
- Published by Institute of Advanced Engineering and Science in International Journal of Advances in Applied Sciences
- Vol. 13 (3) , 647-654
Optimal location and sizing of battery energy storage system using grasshopper optimization algorithm
An energy storage system called a battery energy storage system (BESS) collects energy from various sources, builds up that energy, and then stores it in rechargeable batteries for future use. The battery's electrochemical energy can be discharged and supplied to buildings such as residences, electric cars, and commercial and industrial buildings. The advantages of utilizing BESSs, such as minimizing energy loss, improving voltage profile, peak shaving, and increasing power quality, may be reduced if incorrect decisions about the appropriate position and capacity for BESSs are chosen. Furthermore, the optimal position and size for BESSs are critical since deploying a BESS at every bus, particularly in an extensive network, is not a cost-effective option, and installing oversized BESSs would result in higher investment expenses. Hence, this study suggests a proficient method for identifying the most suitable position and the sizes of BESS to save costs. The grasshopper optimization algorithm (GOA) and evolutionary programming (EP) were employed to address the optimization challenge on the IEEE 69-bus distribution test system. The goal of the optimization is to minimize the overall cost. The findings indicate that the GOA has strong resilience and possesses a superior capacity for optimizing cost reduction in comparison to EP.
- 1 September 2024
- Published by Institute of Advanced Engineering and Science in International Journal of Advances in Applied Sciences
- Vol. 13 (3) , 647-654
Open AccessOptimal location and sizing of battery energy storage system using grasshopper optimization algorithm
An energy storage system called a battery energy storage system (BESS) collects energy from various sources, builds up that energy, and then stores it in rechargeable batteries for future use. The battery's electrochemical energy can be discharged and supplied to buildings such as residences, electric cars, and commercial and industrial buildings. The advantages of utilizing BESSs, such as minimizing energy loss, improving voltage profile, peak shaving, and increasing power quality, may be reduced if incorrect decisions about the appropriate position and capacity for BESSs are chosen. Furthermore, the optimal position and size for BESSs are critical since deploying a BESS at every bus, particularly in an extensive network, is not a cost-effective option, and installing oversized BESSs would result in higher investment expenses. Hence, this study suggests a proficient method for identifying the most suitable position and the sizes of BESS to save costs. The grasshopper optimization algorithm (GOA) and evolutionary programming (EP) were employed to address the optimization challenge on the IEEE 69-bus distribution test system. The goal of the optimization is to minimize the overall cost. The findings indicate that the GOA has strong resilience and possesses a superior capacity for optimizing cost reduction in comparison to EP.
- Open Access
- 1 September 2022
- Published by Institute of Advanced Engineering and Science in International Journal of Power Electronics and Drive Systems (IJPEDS)
- Vol. 13 (3) , 1751-1760
Implementation of artificial intelligence for prediction performance of solar thermal system
A related input parameter is used in this case study to forecast solar thermal systems (STS) capabilities and to compare which artificial neural network (ANN) algorithms and other artificial intelligence (AI) methods have the most reliable predictor for STS performance. In order to gauge the performance of the STS, this research aims to implement AI for predicting STS performance by comparing the ANN technique with other methods. Three different training algorithms which are Levenberg-Marquardt (LM), scaled conjugate gradient (SCG) and Bayesian regularization (BR) are considered in this research. This research will identify acceptable parameters and the best AI technique to use in predicting the STS performance. Previous research on STS demonstrates that the efficiency of STS has been estimated using different input parameters. The results show that the prediction of the LM training algorithm is the best for STS performance.
- 1 September 2022
- Published by Institute of Advanced Engineering and Science in International Journal of Power Electronics and Drive Systems (IJPEDS)
- Vol. 13 (3) , 1751-1760
Open AccessImplementation of artificial intelligence for prediction performance of solar thermal system
A related input parameter is used in this case study to forecast solar thermal systems (STS) capabilities and to compare which artificial neural network (ANN) algorithms and other artificial intelligence (AI) methods have the most reliable predictor for STS performance. In order to gauge the performance of the STS, this research aims to implement AI for predicting STS performance by comparing the ANN technique with other methods. Three different training algorithms which are Levenberg-Marquardt (LM), scaled conjugate gradient (SCG) and Bayesian regularization (BR) are considered in this research. This research will identify acceptable parameters and the best AI technique to use in predicting the STS performance. Previous research on STS demonstrates that the efficiency of STS has been estimated using different input parameters. The results show that the prediction of the LM training algorithm is the best for STS performance.
- 23 November 2021
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 174-179
Optimal DG Placement for Power System Reliability based on N-1 Contingency Analysis
Typically, consumers experience power outages as a result of transmission system issues. Transmission lines are one of the most used technical systems for transporting large amounts of electricity from one part of a country to the farthest point in the opposite direction. The transmission lines traverse many terrain types and geographic regions, which makes them more sensitive to various types of atmospheric disasters and causes frequent line faults and power outages. Therefore, power system reliability and power loss are important, since if these losses are higher than the industry norm, the amount of power accessible to customers will be reduced. Power from a distributed generator (DG) system is incorporated into a power system in this study to improve the power system reliability, average energy not supplied (AENS), and reduce transmission line losses. The results of an optimal DG installation are gained from the penetration of distributed generation in an IEEE 14-bus system by using the Evolutionary Programming (EP) optimization technique. The results prove that with the use of EP optimization, power system reliability can be improved post optimization.
- 23 November 2021
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 174-179
Optimal DG Placement for Power System Reliability based on N-1 Contingency Analysis
Typically, consumers experience power outages as a result of transmission system issues. Transmission lines are one of the most used technical systems for transporting large amounts of electricity from one part of a country to the farthest point in the opposite direction. The transmission lines traverse many terrain types and geographic regions, which makes them more sensitive to various types of atmospheric disasters and causes frequent line faults and power outages. Therefore, power system reliability and power loss are important, since if these losses are higher than the industry norm, the amount of power accessible to customers will be reduced. Power from a distributed generator (DG) system is incorporated into a power system in this study to improve the power system reliability, average energy not supplied (AENS), and reduce transmission line losses. The results of an optimal DG installation are gained from the penetration of distributed generation in an IEEE 14-bus system by using the Evolutionary Programming (EP) optimization technique. The results prove that with the use of EP optimization, power system reliability can be improved post optimization.
- Open Access
- 1 September 2020
- Published by Institute of Advanced Engineering and Science in International Journal of Power Electronics and Drive Systems (IJPEDS)
- Vol. 11 (3) , 1249-1258
Multi-machine transient stability by using static synchronous series compensator
Transient stability in power system is vital to be addressed due to large disturbances that could damage the system such as load changes and voltage increases. This paper presents a multi-machine transient stability using the Static Synchronous Series Compensator (SSSC). SSSC is a device that is connected in series with the power transmission line and produces controllable voltage which contribute to a better performance in the power system stability. As a result, this research has observed a comparison of the synchronization of a three-phase system during single-phase faults before and after installing the SSSC device. In addition, this research investigates the ability of three different types of controllers i.e. Proportional Integral (PI), Proportional Integral Derivation (PID), and Generic controllers to be added to the SSSC improve the transient stability as it cannot operate by itself. This is because the improvement is too small and not able to achieve the desired output. The task presented is to improve the synchronization of the system and time taken for the voltage to stabilize due to the fault. The simulation result shows that the SSSC with an additional controller can improve the stability of a multi-machine power system in a single phase fault.
- 1 September 2020
- Published by Institute of Advanced Engineering and Science in International Journal of Power Electronics and Drive Systems (IJPEDS)
- Vol. 11 (3) , 1249-1258
Open AccessMulti-machine transient stability by using static synchronous series compensator
Transient stability in power system is vital to be addressed due to large disturbances that could damage the system such as load changes and voltage increases. This paper presents a multi-machine transient stability using the Static Synchronous Series Compensator (SSSC). SSSC is a device that is connected in series with the power transmission line and produces controllable voltage which contribute to a better performance in the power system stability. As a result, this research has observed a comparison of the synchronization of a three-phase system during single-phase faults before and after installing the SSSC device. In addition, this research investigates the ability of three different types of controllers i.e. Proportional Integral (PI), Proportional Integral Derivation (PID), and Generic controllers to be added to the SSSC improve the transient stability as it cannot operate by itself. This is because the improvement is too small and not able to achieve the desired output. The task presented is to improve the synchronization of the system and time taken for the voltage to stabilize due to the fault. The simulation result shows that the SSSC with an additional controller can improve the stability of a multi-machine power system in a single phase fault.
- 1 December 2019
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-6
Harmonic Distortion Prediction Model of a Grid -Connected Photovoltaic Using Grey Wolf Optimizer - Least Square Support Vector Machine
This paper depicts a new technique for prediction of the total harmonic distortion (THD) in Grid-Connected Photovoltaic System. Global environmental awareness, increasing demand for energy and down price tendency has led to new opportunities for utilization of renewable energy resources such as photovoltaic (PV) system. The integration of PV system to the grid must comply with the relevant standards given by the utility company. However, the output of PV somehow causes a harmonic distortion as the installation of inverter. The output of PV mainly depends on solar irradiation. Therefore, solar irradiation is selected as one of the input to the prediction model. The hybridize method of heuristic-algorithm namely Grey Wolf Optimizer-Least Square Support Vector (GWO-LSSVM) is introduced in order to improve the prediction accuracy. GWO is inspired by the leadership hierarchy and hunting mechanism of grey wolf in nature. The top hierarchy of grey wolf that considered as the fittest solution is alpha, followed by beta, delta and omega. The optimization process implementing three main steps such as hunting, searching for prey, encircling prey and attacking prey. GWO is utilized to optimize the parameters in LS-SVM model. The results showed that GWO-LSSVM predict more accurate than PSO-LSSVM and LSVM.
- 1 December 2019
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-6
Harmonic Distortion Prediction Model of a Grid -Connected Photovoltaic Using Grey Wolf Optimizer - Least Square Support Vector Machine
This paper depicts a new technique for prediction of the total harmonic distortion (THD) in Grid-Connected Photovoltaic System. Global environmental awareness, increasing demand for energy and down price tendency has led to new opportunities for utilization of renewable energy resources such as photovoltaic (PV) system. The integration of PV system to the grid must comply with the relevant standards given by the utility company. However, the output of PV somehow causes a harmonic distortion as the installation of inverter. The output of PV mainly depends on solar irradiation. Therefore, solar irradiation is selected as one of the input to the prediction model. The hybridize method of heuristic-algorithm namely Grey Wolf Optimizer-Least Square Support Vector (GWO-LSSVM) is introduced in order to improve the prediction accuracy. GWO is inspired by the leadership hierarchy and hunting mechanism of grey wolf in nature. The top hierarchy of grey wolf that considered as the fittest solution is alpha, followed by beta, delta and omega. The optimization process implementing three main steps such as hunting, searching for prey, encircling prey and attacking prey. GWO is utilized to optimize the parameters in LS-SVM model. The results showed that GWO-LSSVM predict more accurate than PSO-LSSVM and LSVM.
- Open Access
- 1 October 2017
- Published by Institute of Advanced Engineering and Science in Indonesian Journal of Electrical Engineering and Computer Science
- Vol. 8 (1) , 253-261
Optimum Enhance Time of Use (ETOU) for Demand Side Electricity Pricing in Regulated Market: An Implementation Using Evolutionary Algorithm
The energy growth in Malaysia is rapidly increasing as the country moves forward with the advancement of industrial revolution. Peak hours require more energy generation, thus cost is also more expensive than during off-peak. Due to this reason, Demand Side Management (DSM) through Demand Response (DR) technique is introduced to modify the demand profile by implementing different strategies of measures. The objective of this study is to optimize the energy profile for commercial sector, as well as analyse the significance of electricity cost reduction by using the optimization technique. A Meta-heuristic technique called as Evolutionary Algorithm (EA) has been implemented in this study to optimize the load profile of a commercial installation. Significant testing shows that the proposed optimization technique has the ability to reform the Maximum Demand from peak zone to off-peak zone to reduce electricity cost. The test results have been validated through 4 cases, which are conventional method for C1 ETOU, C2 ETOU, and C1 ETOU with Optimization technique, and C2 ETOU with optimization technique tariff, respectively. The impact of the EP has been analysed, while the performance of six-time segmentation of C1 and C2 ETOU tariff indicate that the electricity cost for the medium voltage of installation has been reduced. It is hoped that the results from this study can benefit consumers by giving them the flexibility to rearrange their own energy consumption profile, so that the demand side will enjoy significant reduction of electricity cost in the future.
- 1 October 2017
- Published by Institute of Advanced Engineering and Science in Indonesian Journal of Electrical Engineering and Computer Science
- Vol. 8 (1) , 253-261
Open AccessOptimum Enhance Time of Use (ETOU) for Demand Side Electricity Pricing in Regulated Market: An Implementation Using Evolutionary Algorithm
The energy growth in Malaysia is rapidly increasing as the country moves forward with the advancement of industrial revolution. Peak hours require more energy generation, thus cost is also more expensive than during off-peak. Due to this reason, Demand Side Management (DSM) through Demand Response (DR) technique is introduced to modify the demand profile by implementing different strategies of measures. The objective of this study is to optimize the energy profile for commercial sector, as well as analyse the significance of electricity cost reduction by using the optimization technique. A Meta-heuristic technique called as Evolutionary Algorithm (EA) has been implemented in this study to optimize the load profile of a commercial installation. Significant testing shows that the proposed optimization technique has the ability to reform the Maximum Demand from peak zone to off-peak zone to reduce electricity cost. The test results have been validated through 4 cases, which are conventional method for C1 ETOU, C2 ETOU, and C1 ETOU with Optimization technique, and C2 ETOU with optimization technique tariff, respectively. The impact of the EP has been analysed, while the performance of six-time segmentation of C1 and C2 ETOU tariff indicate that the electricity cost for the medium voltage of installation has been reduced. It is hoped that the results from this study can benefit consumers by giving them the flexibility to rearrange their own energy consumption profile, so that the demand side will enjoy significant reduction of electricity cost in the future.
- Open Access
- 1 October 2017
- Published by Institute of Advanced Engineering and Science in Indonesian Journal of Electrical Engineering and Computer Science
- Vol. 8 (1) , 129-136
Ant Lion Optimizer for Solving Unit Commitment Problem in Smart Grid System
This paper proposed the integration of solar energy resources into the conventional unit commitment. The growing concern about the depletion of fossil fuels increased the awareness on the importance of renewable energy resources, as an alternative energy resources in unit commitment operation. However, the present renewable energy resources is intermitted due to unpredicted photovoltaic output. Therefore, Ant Lion Optimizer (ALO) is proposed to solve unit commitment problem in smart grid system with consideration of uncertainties .ALO is inspired by the hunting appliance of ant lions in natural surroundings. A 10-unit system with the constraints, such as power balance, spinning reserve, generation limit, minimum up and down time constraints are considered to prove the effectiveness of the proposed method. The performance of proposed algorithm are compared with the performance of Dynamic Programming (DP). The results show that the integration of solar energy resources in unit commitment scheduling can improve the total operating cost significantly.
- 1 October 2017
- Published by Institute of Advanced Engineering and Science in Indonesian Journal of Electrical Engineering and Computer Science
- Vol. 8 (1) , 129-136
Open AccessAnt Lion Optimizer for Solving Unit Commitment Problem in Smart Grid System
This paper proposed the integration of solar energy resources into the conventional unit commitment. The growing concern about the depletion of fossil fuels increased the awareness on the importance of renewable energy resources, as an alternative energy resources in unit commitment operation. However, the present renewable energy resources is intermitted due to unpredicted photovoltaic output. Therefore, Ant Lion Optimizer (ALO) is proposed to solve unit commitment problem in smart grid system with consideration of uncertainties .ALO is inspired by the hunting appliance of ant lions in natural surroundings. A 10-unit system with the constraints, such as power balance, spinning reserve, generation limit, minimum up and down time constraints are considered to prove the effectiveness of the proposed method. The performance of proposed algorithm are compared with the performance of Dynamic Programming (DP). The results show that the integration of solar energy resources in unit commitment scheduling can improve the total operating cost significantly.
- 1 October 2017
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 151-156
Prediction of photovoltaic system output using hybrid least square support vector machine
The electrical system photovoltaic (PV) modules required special design considerations due to unpredictable and sudden changes in weather conditions such as the solar irradiation level as well as the cell operating temperature. Therefore, this study presents a practical and reliable approach for the prediction of PV power output using an intelligent-based technique namely Cuckoo Search Algorithm - Least Square Support Vector Machine (CS-LSSVM). Available historical output power data are analyzed and appropriate features are selected for the model. There are two inputs vectors to the model consists of solar irradiation and ambient temperature. Cuckoo Search Algorithm (CS) is hybrid with LS-SVM in order to optimize the RBF parameters for better prediction performance. The performance of CS-LSSVM is compared with those obtained from LS-SVM using cross-validation technique in terms of accuracy. In this paper, Mean Absolute Percentage Error (MAPE) is used to quantify the performance of the prediction. Besides that, evaluation also carried out by calculating the correlation of determination. The historical PV data is utilized to validate the workability of the proposed technique. The results showed that CS-LSSVM provides better performance in predicting photovoltaic system power output.
- 1 October 2017
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 151-156
Prediction of photovoltaic system output using hybrid least square support vector machine
The electrical system photovoltaic (PV) modules required special design considerations due to unpredictable and sudden changes in weather conditions such as the solar irradiation level as well as the cell operating temperature. Therefore, this study presents a practical and reliable approach for the prediction of PV power output using an intelligent-based technique namely Cuckoo Search Algorithm - Least Square Support Vector Machine (CS-LSSVM). Available historical output power data are analyzed and appropriate features are selected for the model. There are two inputs vectors to the model consists of solar irradiation and ambient temperature. Cuckoo Search Algorithm (CS) is hybrid with LS-SVM in order to optimize the RBF parameters for better prediction performance. The performance of CS-LSSVM is compared with those obtained from LS-SVM using cross-validation technique in terms of accuracy. In this paper, Mean Absolute Percentage Error (MAPE) is used to quantify the performance of the prediction. Besides that, evaluation also carried out by calculating the correlation of determination. The historical PV data is utilized to validate the workability of the proposed technique. The results showed that CS-LSSVM provides better performance in predicting photovoltaic system power output.
- Open Access
- 1 May 2017
- Published by Institute of Advanced Engineering and Science in Indonesian Journal of Electrical Engineering and Computer Science
- Vol. 6 (2) , 357-367
Impact of Distributed Generation on the Fault Current in Power Distribution System
Monitoring fault current is very important in power system protection. Therefore, the impact of installing Distributed Generation (DG) on the fault current is investigated in this paper. Three types of fault currents which are single line-to-ground, double line-to-ground and three phase fault are analyzed at various fault locations. The optimal location of DG was identified heuristically using power system simulation program for planning, design and analysis of distribution system (PSS/Adept). The simulation was conducted by observing the power losses of the test system by installing DG at each load buses. Bus with minimum power loss was chosen as the optimal location of DG. In order to study the impact of DG to the fault current, various locations and sizes of DG were also selected. The simulations were conducted on IEEE 33-bus distribution test system and IEEE 69-bus distribution test system. The results showed that the impact of DG to the fault current is significant especially when fault occurs at busses near to DG location.
- 1 May 2017
- Published by Institute of Advanced Engineering and Science in Indonesian Journal of Electrical Engineering and Computer Science
- Vol. 6 (2) , 357-367
Open AccessImpact of Distributed Generation on the Fault Current in Power Distribution System
Monitoring fault current is very important in power system protection. Therefore, the impact of installing Distributed Generation (DG) on the fault current is investigated in this paper. Three types of fault currents which are single line-to-ground, double line-to-ground and three phase fault are analyzed at various fault locations. The optimal location of DG was identified heuristically using power system simulation program for planning, design and analysis of distribution system (PSS/Adept). The simulation was conducted by observing the power losses of the test system by installing DG at each load buses. Bus with minimum power loss was chosen as the optimal location of DG. In order to study the impact of DG to the fault current, various locations and sizes of DG were also selected. The simulations were conducted on IEEE 33-bus distribution test system and IEEE 69-bus distribution test system. The results showed that the impact of DG to the fault current is significant especially when fault occurs at busses near to DG location.
- 1 December 2016
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 91-96
Modelling neutral to earth voltage (NTEV) on the commercial building
Power Quality (PQ) problems on distribution system (DS) can be categorized as voltage sag, voltage swell, harmonic, transient and others. Nowadays, due to the nonlinear loads, imbalanced loads, improper wiring and poor grounding on DS, the neutral to earth voltage (NTEV) become issue of the PQ problem. Generally, magnitude of the NTEV is zero value if the system is balance, however it changes to the nonzero value due many factor as mention above. Furthermore, in order to study the effect and factor of commercial building and DS, a reliable model need to be applied. The main contribution of this paper is to determine NTEV and NC magnitude and shape in the DS. Then, this paper presented the model of the three phase four-wire underground cable on the commercial building; the comparison of measurement data and simulation result on the NTEV and NC. This model using XLPE cable as the connection from the transformer to the load, CIM as the load at commercial building, and RLC ground electrode as the grounding system. In order to validated this simulation, the model is tested on the two different data of the commercial building. The simulation results are similar identical with the measurement, even the shape of the NTEV and NC are different. As the conclusion, the objective is to determine the magnitude and shape of the NTEV and NC are successfully done and this model can be used to determine the NTEV rise on the others commercial building and also can be used to study the factor contribution due to elevated of NTEV.
- 1 December 2016
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 91-96
Modelling neutral to earth voltage (NTEV) on the commercial building
Power Quality (PQ) problems on distribution system (DS) can be categorized as voltage sag, voltage swell, harmonic, transient and others. Nowadays, due to the nonlinear loads, imbalanced loads, improper wiring and poor grounding on DS, the neutral to earth voltage (NTEV) become issue of the PQ problem. Generally, magnitude of the NTEV is zero value if the system is balance, however it changes to the nonzero value due many factor as mention above. Furthermore, in order to study the effect and factor of commercial building and DS, a reliable model need to be applied. The main contribution of this paper is to determine NTEV and NC magnitude and shape in the DS. Then, this paper presented the model of the three phase four-wire underground cable on the commercial building; the comparison of measurement data and simulation result on the NTEV and NC. This model using XLPE cable as the connection from the transformer to the load, CIM as the load at commercial building, and RLC ground electrode as the grounding system. In order to validated this simulation, the model is tested on the two different data of the commercial building. The simulation results are similar identical with the measurement, even the shape of the NTEV and NC are different. As the conclusion, the objective is to determine the magnitude and shape of the NTEV and NC are successfully done and this model can be used to determine the NTEV rise on the others commercial building and also can be used to study the factor contribution due to elevated of NTEV.