Brian M. Selvy
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Brian M. Selvy has a total of 65 co-authors. Here are the top co-authors by number of shared publications:
Bo Xin
AURA LSST (United States)
3 shared publicationsCharles F. Claver
AURA LSST (United States)
3 shared publicationsJacques Sebag
Large Synoptic Survey Telescope (United States)
3 shared publicationsStuart Marshall
SLAC National Accelerator Lab. (United States)
3 shared publicationsTim Jenness
Large Synoptic Survey Telescope (United States)
3 shared publicationsCharles Claver
LSST (United States)
2 shared publications
Latest Publications
- 1 April 2022
- Published by SPIE-Intl Soc Optical Eng in Journal of Astronomical Telescopes, Instruments, and Systems
- Vol. 8 (02) , 021507-26
Systems engineering processes and tools for requirements management at the Extremely Large Telescopes
The new class of Extremely Large Telescopes (ELTs) has implemented more rigorous systems engineering processes and tools for requirements management than has been used in past observatory projects. The similarities and differences between these activities at the ESO-ELT, GMT, TMT, and NOIRLab US-ELTP projects are summarized. We show that, while the key steps of the requirements management process are common among the ELTs, each project has implemented its own variation of the processes and tools tailored to its needs.
- 1 April 2022
- Published by SPIE-Intl Soc Optical Eng in Journal of Astronomical Telescopes, Instruments, and Systems
- Vol. 8 (02) , 021507-26
Systems engineering processes and tools for requirements management at the Extremely Large Telescopes
The new class of Extremely Large Telescopes (ELTs) has implemented more rigorous systems engineering processes and tools for requirements management than has been used in past observatory projects. The similarities and differences between these activities at the ESO-ELT, GMT, TMT, and NOIRLab US-ELTP projects are summarized. We show that, while the key steps of the requirements management process are common among the ELTs, each project has implemented its own variation of the processes and tools tailored to its needs.
- 10 July 2018
- Published by SPIE-Intl Soc Optical Eng
- Vol. 10705, 25
Monitoring LSST system performance during construction
The Large Synoptic Survey Telescope (LSST) is under construction in Chile. To make the delivered system meet the science goals, the project defines a set of performance metrics, and constantly monitors the system performance by evaluating the metrics against their requirements. In this paper, we describe the latest updates to the comprehensive tool set we have developed for evaluating the LSST system performance, which we collectively refer to as the LSST integrated model, and recent work on utilizing these tools for system verification. We also broaden our set of performance metrics and introduce an integrated-étendue-based metrics framework, which is useful for not just system verification, but also mitigation and optimization. Most of the major metrics currently being monitored fit under this framework, including image quality, system throughput, the single-visit point source 5σdetection limit, etc. We also mointor the Point Spread Function (PSF) ellipticity, which isn't part of this metrics framework, but is an output of the integrated model.
- 10 July 2018
- Published by SPIE-Intl Soc Optical Eng
- Vol. 10705, 25
Monitoring LSST system performance during construction
The Large Synoptic Survey Telescope (LSST) is under construction in Chile. To make the delivered system meet the science goals, the project defines a set of performance metrics, and constantly monitors the system performance by evaluating the metrics against their requirements. In this paper, we describe the latest updates to the comprehensive tool set we have developed for evaluating the LSST system performance, which we collectively refer to as the LSST integrated model, and recent work on utilizing these tools for system verification. We also broaden our set of performance metrics and introduce an integrated-étendue-based metrics framework, which is useful for not just system verification, but also mitigation and optimization. Most of the major metrics currently being monitored fit under this framework, including image quality, system throughput, the single-visit point source 5σdetection limit, etc. We also mointor the Point Spread Function (PSF) ellipticity, which isn't part of this metrics framework, but is an output of the integrated model.
- 10 July 2018
- Published by SPIE-Intl Soc Optical Eng
- Vol. 10705, 30
V&V planning and execution in an integrated model-based engineering environment using MagicDraw, Syndeia, and JIRA
This paper describes the evolution of the processes, methodologies and tools developed and utilized on the Large Synoptic Survey Telescope (LSST) project that provide a complete end-to-end environment for verification planning, execution, and reporting. LSST utilizes No Magic’s MagicDraw Cameo Systems Modeler tool as the core tool for systems modeling, a Jira-based test case/test procedure/test plan tool called Test Management for Jira for verification execution, and Intercax’s Syndeia tool for bi-directional synchronization of data between Cameo Systems Modeler and Jira. Several additional supporting tools and services are also described to round out a complete solution. The paper describes the project’s needs, overall software platform architecture, and customizations developed to provide the end to- end solution.
- 10 July 2018
- Published by SPIE-Intl Soc Optical Eng
- Vol. 10705, 30
V&V planning and execution in an integrated model-based engineering environment using MagicDraw, Syndeia, and JIRA
This paper describes the evolution of the processes, methodologies and tools developed and utilized on the Large Synoptic Survey Telescope (LSST) project that provide a complete end-to-end environment for verification planning, execution, and reporting. LSST utilizes No Magic’s MagicDraw Cameo Systems Modeler tool as the core tool for systems modeling, a Jira-based test case/test procedure/test plan tool called Test Management for Jira for verification execution, and Intercax’s Syndeia tool for bi-directional synchronization of data between Cameo Systems Modeler and Jira. Several additional supporting tools and services are also described to round out a complete solution. The paper describes the project’s needs, overall software platform architecture, and customizations developed to provide the end to- end solution.
- 10 July 2018
- Published by SPIE-Intl Soc Optical Eng
- Vol. 10705, 107050B
An overview of the LSST system integration and commission plan (Conference Presentation)
The Commissioning Phase of the LSST Project is the final stage in the combined NSF and DOE funded LSST construction project. The LSST commission phase is planned to start early in 2020 and be completed near the end of 2022, ending with the LSST Observatory system ready to start survey operations. Commissioning includes the assembly of the three principal subsystems (Telescope, Camera and Data Management) into the LSST Observatory System and the integration and test (AI&T) efforts as well as the science verification activities. The LSST System AI&T and Commissioning Plan is driven by a combination of engineering and scientifically oriented activities to show compliance with technical requirements and readiness to conduct science operations (acquiring data, processing data, and serving data and derived data products to users). LSST System AI&T and Commissioning will be carried out over four phases of activity: Phase-0) Pre-commissioning preparations (work breakdown structure; Phase-1) Early System AI&T with a commissioning camera (ComCam); Phase-2) Full System AI&T when the LSST Science Camera is shipped to Chile, integrated on the telescope and the data management system (DMS) is exercised with full scale data; and Phase-3) Science Validation where a series of mini-surveys are used to characterize the system with respect to the survey performance specifications in the SRD/LSR and functionality of the, leading to operations readiness. The Science Validation Phase concludes with an Operations Readiness Review (ORR). The LSST System Assembly, Integration and Test and Commissioning effort has been planned out over several phases The first phase of commissioning under Early AI&T is designed to test and verify the system level interfaces using ComCam – a 144Mpixel imager utilizing the same control components as the full science camera. During this period, the telescope active optics system will be brought into compliance with system requirements; the scheduler will be exercised and all safety checks verified for autonomous operation; and early DM algorithm testing will be performed with on-sky data from ComCam using a commissioning computing cluster at the Base Facility. The second phase of activities under Full System AI&T is designed to complete the technical integration of the three principal subsystems and EPO, show full compliance with system level requirements as detailed in the Observatory System Specifications and system level interface control documents, and provide full scale data for further DM/EPO software and algorithmic testing and development. System level requirements that flow directly to subsystems without any further derivation will be tested for compliance, at the subsystem level and below, under the supervision of Project Systems Engineering. This document includes the general approach and goals for these tests. It is expected that roughly four (4) months into the Full System AI&T phase the telescope and camera will be fully...
- 10 July 2018
- Published by SPIE-Intl Soc Optical Eng
- Vol. 10705, 107050B
An overview of the LSST system integration and commission plan (Conference Presentation)
The Commissioning Phase of the LSST Project is the final stage in the combined NSF and DOE funded LSST construction project. The LSST commission phase is planned to start early in 2020 and be completed near the end of 2022, ending with the LSST Observatory system ready to start survey operations. Commissioning includes the assembly of the three principal subsystems (Telescope, Camera and Data Management) into the LSST Observatory System and the integration and test (AI&T) efforts as well as the science verification activities. The LSST System AI&T and Commissioning Plan is driven by a combination of engineering and scientifically oriented activities to show compliance with technical requirements and readiness to conduct science operations (acquiring data, processing data, and serving data and derived data products to users). LSST System AI&T and Commissioning will be carried out over four phases of activity: Phase-0) Pre-commissioning preparations (work breakdown structure; Phase-1) Early System AI&T with a commissioning camera (ComCam); Phase-2) Full System AI&T when the LSST Science Camera is shipped to Chile, integrated on the telescope and the data management system (DMS) is exercised with full scale data; and Phase-3) Science Validation where a series of mini-surveys are used to characterize the system with respect to the survey performance specifications in the SRD/LSR and functionality of the, leading to operations readiness. The Science Validation Phase concludes with an Operations Readiness Review (ORR). The LSST System Assembly, Integration and Test and Commissioning effort has been planned out over several phases The first phase of commissioning under Early AI&T is designed to test and verify the system level interfaces using ComCam – a 144Mpixel imager utilizing the same control components as the full science camera. During this period, the telescope active optics system will be brought into compliance with system requirements; the scheduler will be exercised and all safety checks verified for autonomous operation; and early DM algorithm testing will be performed with on-sky data from ComCam using a commissioning computing cluster at the Base Facility. The second phase of activities under Full System AI&T is designed to complete the technical integration of the three principal subsystems and EPO, show full compliance with system level requirements as detailed in the Observatory System Specifications and system level interface control documents, and provide full scale data for further DM/EPO software and algorithmic testing and development. System level requirements that flow directly to subsystems without any further derivation will be tested for compliance, at the subsystem level and below, under the supervision of Project Systems Engineering. This document includes the general approach and goals for these tests. It is expected that roughly four (4) months into the Full System AI&T phase the telescope and camera will be fully...
- 10 July 2018
- Published by SPIE-Intl Soc Optical Eng
- Vol. 10705, 1070503
Dome seeing sensitivity analysis for LSST
High spatial resolution thermal unsteady CFD simulations of LSST are performed and processed to provide image degradation due to dome seeing in FWHM. An analysis of the sensitivity of the image quality to certain important geometric features and aerothermal properties is presented. More specifically, the influence of the LSST vent light baffles and windscreen, the wind speed and the surface temperature of components such as the primary and secondary mirrors, the camera, the telescope structure and dome exterior is assessed and conclusions are drawn. The secondary mirror and camera surface temperatures are found to be among the most critical in minimizing LSST dome seeing.
- 10 July 2018
- Published by SPIE-Intl Soc Optical Eng
- Vol. 10705, 1070503
Dome seeing sensitivity analysis for LSST
High spatial resolution thermal unsteady CFD simulations of LSST are performed and processed to provide image degradation due to dome seeing in FWHM. An analysis of the sensitivity of the image quality to certain important geometric features and aerothermal properties is presented. More specifically, the influence of the LSST vent light baffles and windscreen, the wind speed and the surface temperature of components such as the primary and secondary mirrors, the camera, the telescope structure and dome exterior is assessed and conclusions are drawn. The secondary mirror and camera surface temperatures are found to be among the most critical in minimizing LSST dome seeing.
- 18 August 2016
- Published by SPIE-Intl Soc Optical Eng
- Vol. 9911, 99110D-99110D-19
Using model based systems engineering for the development of the Large Synoptic Survey Telescope's operational plan
- 18 August 2016
- Published by SPIE-Intl Soc Optical Eng
- Vol. 9911, 99110D-99110D-19
Using model based systems engineering for the development of the Large Synoptic Survey Telescope's operational plan
- 8 August 2016
- Published by SPIE-Intl Soc Optical Eng
- Vol. 9913, 991309
LSST control software component design
Construction of the Large Synoptic Survey Telescope system involves several different organizations, a situation that poses many challenges at the time of the software integration of the components. To ensure commonality for the purposes of usability, maintainability, and robustness, the LSST software teams have agreed to the following for system software components: a summary state machine, a manner of managing settings, a flexible solution to specify controller/controllee relationships reliably as needed, and a paradigm for responding to and communicating alarms. This paper describes these agreed solutions and the factors that motivated these.
- 8 August 2016
- Published by SPIE-Intl Soc Optical Eng
- Vol. 9913, 991309
LSST control software component design
Construction of the Large Synoptic Survey Telescope system involves several different organizations, a situation that poses many challenges at the time of the software integration of the components. To ensure commonality for the purposes of usability, maintainability, and robustness, the LSST software teams have agreed to the following for system software components: a summary state machine, a manner of managing settings, a flexible solution to specify controller/controllee relationships reliably as needed, and a paradigm for responding to and communicating alarms. This paper describes these agreed solutions and the factors that motivated these.
- 4 August 2014
- Published by SPIE-Intl Soc Optical Eng
- Vol. 9150, 91500M
Systems engineering in the Large Synoptic Survey Telescope project: an application of model based systems engineering
The Large Synoptic Survey Telescope project was an early adopter of SysML and Model Based Systems Engineering practices. The LSST project began using MBSE for requirements engineering beginning in 2006 shortly after the initial release of the first SysML standard. Out of this early work the LSST’s MBSE effort has grown to include system requirements, operational use cases, physical system definition, interfaces, and system states along with behavior sequences and activities. In this paper we describe our approach and methodology for cross-linking these system elements over the three classical systems engineering domains – requirement, functional and physical - into the LSST System Architecture model. We also show how this model is used as the central element to the overall project systems engineering effort. More recently we have begun to use the cross-linked modeled system architecture to develop and plan the system verification and test process. In presenting this work we also describe “lessons learned” from several missteps the project has had with MBSE. Lastly, we conclude by summarizing the overall status of the LSST’s System Architecture model and our plans for the future as the LSST heads toward construction.
- 4 August 2014
- Published by SPIE-Intl Soc Optical Eng
- Vol. 9150, 91500M
Systems engineering in the Large Synoptic Survey Telescope project: an application of model based systems engineering
The Large Synoptic Survey Telescope project was an early adopter of SysML and Model Based Systems Engineering practices. The LSST project began using MBSE for requirements engineering beginning in 2006 shortly after the initial release of the first SysML standard. Out of this early work the LSST’s MBSE effort has grown to include system requirements, operational use cases, physical system definition, interfaces, and system states along with behavior sequences and activities. In this paper we describe our approach and methodology for cross-linking these system elements over the three classical systems engineering domains – requirement, functional and physical - into the LSST System Architecture model. We also show how this model is used as the central element to the overall project systems engineering effort. More recently we have begun to use the cross-linked modeled system architecture to develop and plan the system verification and test process. In presenting this work we also describe “lessons learned” from several missteps the project has had with MBSE. Lastly, we conclude by summarizing the overall status of the LSST’s System Architecture model and our plans for the future as the LSST heads toward construction.
- 4 August 2014
- Published by SPIE-Intl Soc Optical Eng
- Vol. 9150, 91500N
Using SysML for verification and validation planning on the Large Synoptic Survey Telescope (LSST)
This paper provides an overview of the tool, language, and methodology used for Verification and Validation Planning on the Large Synoptic Survey Telescope (LSST) Project. LSST has implemented a Model Based Systems Engineering (MBSE) approach as a means of defining all systems engineering planning and definition activities that have historically been captured in paper documents. Specifically, LSST has adopted the Systems Modeling Language (SysML) standard and is utilizing a software tool called Enterprise Architect, developed by Sparx Systems. Much of the historical use of SysML has focused on the early phases of the project life cycle. Our approach is to extend the advantages of MBSE into later stages of the construction project. This paper details the methodology employed to use the tool to document the verification planning phases, including the extension of the language to accommodate the project’s needs. The process includes defining the Verification Plan for each requirement, which in turn consists of a Verification Requirement, Success Criteria, Verification Method(s), Verification Level, and Verification Owner. Each Verification Method for each Requirement is defined as a Verification Activity and mapped into Verification Events, which are collections of activities that can be executed concurrently in an efficient and complementary way. Verification Event dependency and sequences are modeled using Activity Diagrams. The methodology employed also ties in to the Project Management Control System (PMCS), which utilizes Primavera P6 software, mapping each Verification Activity as a step in a planned activity. This approach leads to full traceability from initial Requirement to scheduled, costed, and resource loaded PMCS task-based activities, ensuring all requirements will be verified.
- 4 August 2014
- Published by SPIE-Intl Soc Optical Eng
- Vol. 9150, 91500N
Using SysML for verification and validation planning on the Large Synoptic Survey Telescope (LSST)
This paper provides an overview of the tool, language, and methodology used for Verification and Validation Planning on the Large Synoptic Survey Telescope (LSST) Project. LSST has implemented a Model Based Systems Engineering (MBSE) approach as a means of defining all systems engineering planning and definition activities that have historically been captured in paper documents. Specifically, LSST has adopted the Systems Modeling Language (SysML) standard and is utilizing a software tool called Enterprise Architect, developed by Sparx Systems. Much of the historical use of SysML has focused on the early phases of the project life cycle. Our approach is to extend the advantages of MBSE into later stages of the construction project. This paper details the methodology employed to use the tool to document the verification planning phases, including the extension of the language to accommodate the project’s needs. The process includes defining the Verification Plan for each requirement, which in turn consists of a Verification Requirement, Success Criteria, Verification Method(s), Verification Level, and Verification Owner. Each Verification Method for each Requirement is defined as a Verification Activity and mapped into Verification Events, which are collections of activities that can be executed concurrently in an efficient and complementary way. Verification Event dependency and sequences are modeled using Activity Diagrams. The methodology employed also ties in to the Project Management Control System (PMCS), which utilizes Primavera P6 software, mapping each Verification Activity as a step in a planned activity. This approach leads to full traceability from initial Requirement to scheduled, costed, and resource loaded PMCS task-based activities, ensuring all requirements will be verified.