Sidi Mohammed Boudia
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Research Interests
Sidi Mohammed Boudia has a total of 27 co-authors. Here are the top co-authors by number of shared publications:
- Ouahiba Guerri
Centre de Développement des Energies Renouvelables, CDER, Algiers, Algeria
6 shared publications Abdelhalim Benmansour
3 shared publications- Miloud Benmedjahed
Unité de Recherche en Energie Renouvelables en Milieu Saharien, URERMS, Centre de Développement Des Energies Renouvelables, CDER
2 shared publications Mohammed Abdellatif Tabet Hellal
2 shared publicationsSabiha Kheder-Haddouche
Centre de Développement de Energies Renouvelables, CDER,Wind Energy Department,Algiers,Algeria,16340
2 shared publicationsA. Benmansour
Laboratoire de Simulation et Caractérisation des Dispositifs et Microsystèmes, Unité de Recherche Matériaux et Energies Renouvelables, LSCDM-URMER , Université de Tlemcen , Tlemcen , Algeria
1 shared publication
Latest Publications
- 19 December 2024
- Published by Springer Nature in Stochastic Environmental Research and Risk Assessment
- Vol. 39 (2) , 547-579
Wind speed forecasting using univariate and multivariate time series models
- 19 December 2024
- Published by Springer Nature in Stochastic Environmental Research and Risk Assessment
- Vol. 39 (2) , 547-579
Wind speed forecasting using univariate and multivariate time series models
- 10 June 2020
- Published by Taylor & Francis in Energy Sources, Part A: Recovery, Utilization, and Environmental Effects
- Vol. 46 (1) , 9312-9324
Performance evaluation of a wind farm using different power density distributions
Several wind resource assessment studies showed that the various power density functions (PDFs) were not always able to reproduce the wind regime available in different regions. Moreover, the impact of the PDFs on the assessment of wind farm performance was not widely investigated. Thereby, in the present study, the generalized extreme value (GEV), Weibull and Normal distributions are considered to investigate whether the expected performances of an actual wind farm are well predicted. This study is applied to Kaberten wind park located at Adrar, in south of Algeria. First, the selected PDFs are applied to analyze wind data collected at the meteorological station of Adrar. Then, the expected annual energy production (AEP), capacity factor and number of operating and non-operating hours of the wind park are computed using the PDFs. Thereafter, these predicted performances are compared to actual data of Kaberten wind park, and errors are assessed for every PDF. The results show that the errors on the mean wind speed are less than 0.5% for the three PDFs, whereas the available wind power density relative error varies from about 2.5% for Weibull to 20.9% for GEV, while it is about 5.9% for Normal distribution. Nevertheless, the AEP errors vary from about 8% for the GEV distribution to more than 24% for the two other distributions. Thus, these results indicate that for the studied case, the three PDFs are comparable for estimating the average wind speed, while the GEV distribution is more suitable for estimating the AEP.
- 10 June 2020
- Published by Taylor & Francis in Energy Sources, Part A: Recovery, Utilization, and Environmental Effects
- Vol. 46 (1) , 9312-9324
Performance evaluation of a wind farm using different power density distributions
Several wind resource assessment studies showed that the various power density functions (PDFs) were not always able to reproduce the wind regime available in different regions. Moreover, the impact of the PDFs on the assessment of wind farm performance was not widely investigated. Thereby, in the present study, the generalized extreme value (GEV), Weibull and Normal distributions are considered to investigate whether the expected performances of an actual wind farm are well predicted. This study is applied to Kaberten wind park located at Adrar, in south of Algeria. First, the selected PDFs are applied to analyze wind data collected at the meteorological station of Adrar. Then, the expected annual energy production (AEP), capacity factor and number of operating and non-operating hours of the wind park are computed using the PDFs. Thereafter, these predicted performances are compared to actual data of Kaberten wind park, and errors are assessed for every PDF. The results show that the errors on the mean wind speed are less than 0.5% for the three PDFs, whereas the available wind power density relative error varies from about 2.5% for Weibull to 20.9% for GEV, while it is about 5.9% for Normal distribution. Nevertheless, the AEP errors vary from about 8% for the GEV distribution to more than 24% for the two other distributions. Thus, these results indicate that for the studied case, the three PDFs are comparable for estimating the average wind speed, while the GEV distribution is more suitable for estimating the AEP.
- 1 November 2019
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-6
Wind Resource Assessment at Illizi Site in the Algerian Sahara, with Environmental Analysis
This paper gives an investigation of wind characteristics of Illizi site, which is an isolated region situated in the southeastern part of Algerian Sahara. For this purpose, 11 years of measurements hourly data in terms of wind speed and wind direction recorded at 10m a.g.l. were used. For the temporal analysis, the Weibull distribution were used to study the monthly, annual and diurnal wind potential, while the WAsP program were used to establish the wind map and to find the windiest area for wind farm energy production simulation at this desert region. Given that the major part of southern regions in Algeria have an isolated grid, powered by gas and diesel turbines, this study proposes an environmental analysis which assess the quantity of C0 2 not emitted into the atmosphere during a life cycle of a wind power plant of 10 MW rated capacity, composed by 5 wind turbines of 2 MW from Vestas manufacturer, installed in this region. The analysis results for the meteorological station at a height of 10m indicate that the studied site has an appreciable wind potential with a mean wind speed equal to 5.76m/s and a mean power density of 196 W/m 2 , with the east as dominant direction. Regarding the temporal analysis, it is shown that the monthly mean wind speed ranges from a minimum of 5.1m/s in December to a maximum value of 6.1m/s in May. In addition, it was given that diurnal wind speed analysis gives a good potential in the daytime, while the wind potential is relatively calm during the night. Furthermore, the wind map given at 67 m, shows a mean wind speed which varies from 4 to 11 m/s over the whole studied region. Finally, the wind power plant energy production simulated at a windy site in the region of Illizi gives an annual energy production equal to 40.120 GWh, which leads to avoid the emission of 1754.47 Ton of CO 2 equivalent.
- 1 November 2019
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-6
Wind Resource Assessment at Illizi Site in the Algerian Sahara, with Environmental Analysis
This paper gives an investigation of wind characteristics of Illizi site, which is an isolated region situated in the southeastern part of Algerian Sahara. For this purpose, 11 years of measurements hourly data in terms of wind speed and wind direction recorded at 10m a.g.l. were used. For the temporal analysis, the Weibull distribution were used to study the monthly, annual and diurnal wind potential, while the WAsP program were used to establish the wind map and to find the windiest area for wind farm energy production simulation at this desert region. Given that the major part of southern regions in Algeria have an isolated grid, powered by gas and diesel turbines, this study proposes an environmental analysis which assess the quantity of C0 2 not emitted into the atmosphere during a life cycle of a wind power plant of 10 MW rated capacity, composed by 5 wind turbines of 2 MW from Vestas manufacturer, installed in this region. The analysis results for the meteorological station at a height of 10m indicate that the studied site has an appreciable wind potential with a mean wind speed equal to 5.76m/s and a mean power density of 196 W/m 2 , with the east as dominant direction. Regarding the temporal analysis, it is shown that the monthly mean wind speed ranges from a minimum of 5.1m/s in December to a maximum value of 6.1m/s in May. In addition, it was given that diurnal wind speed analysis gives a good potential in the daytime, while the wind potential is relatively calm during the night. Furthermore, the wind map given at 67 m, shows a mean wind speed which varies from 4 to 11 m/s over the whole studied region. Finally, the wind power plant energy production simulated at a windy site in the region of Illizi gives an annual energy production equal to 40.120 GWh, which leads to avoid the emission of 1754.47 Ton of CO 2 equivalent.
- 7 March 2019
- Published by Taylor & Francis in Energy Sources, Part A: Recovery, Utilization, and Environmental Effects
- Vol. 42 (2) , 161-175
Influence of wind data temporal variation in wind resource assessment. two case studies in the southern part of Algeria
The paper investigates the influence of the period covering wind data on the technical and economic analysis of wind power generation. This study is applied to two sites located in the south of Algeria. Using 12 years of wind data collected by the Algerian Meteorological Office, the annual evolutions of mean wind speed and direction are examined. Then two data periods are considered for the evaluation of (i) the wind resource, (ii) the expected annual energy production and (iii) the electricity generated cost. The influence of the data period on the predicted results is highlighted.
- 7 March 2019
- Published by Taylor & Francis in Energy Sources, Part A: Recovery, Utilization, and Environmental Effects
- Vol. 42 (2) , 161-175
Influence of wind data temporal variation in wind resource assessment. two case studies in the southern part of Algeria
The paper investigates the influence of the period covering wind data on the technical and economic analysis of wind power generation. This study is applied to two sites located in the south of Algeria. Using 12 years of wind data collected by the Algerian Meteorological Office, the annual evolutions of mean wind speed and direction are examined. Then two data periods are considered for the evaluation of (i) the wind resource, (ii) the expected annual energy production and (iii) the electricity generated cost. The influence of the data period on the predicted results is highlighted.
- 1 December 2018
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-6
Feasibility Study of a Wind Farm in El Golea Region in the Algerian Sahara
El Golea region, which previous studies have revealed to have a good wind potential, is chosen for a technical and economic study of a wind farm. This work aims to calculate the kWh cost of electricity produced by four types of wind turbines. The wind climate of the region is determined using WAsP software, based on wind speed and direction measurements at 10 m a.g.l. over a period of 10 years, from 2007 to 2016. The annual characteristics of the wind are calculated and their respective values are: 5.3 m/s for the average speed, 6 m/s and 2.04 for the Weibull parameters A and k and 169 W/m 2 for the power density. The wind speed at 10 m is mapped over the entire study area and an optimal site is chosen for the installation of a wind farm. Four turbine models are chosen and the annual energy produced by each of them at the site is calculated as well as the cost per unit (CPU). The minimum cost of electricity generated is $0.0144 / kWh for an Annual Energy Production of 10.616 GWh and is given by the VESTAS V90 rated power of 2MW turbine. Finally, the annual energy produced by a wind farm consisting of five (05) VestasV90-2MW, is estimated to be about 51 GWh with wake losses of the order of it%.
- 1 December 2018
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-6
Feasibility Study of a Wind Farm in El Golea Region in the Algerian Sahara
El Golea region, which previous studies have revealed to have a good wind potential, is chosen for a technical and economic study of a wind farm. This work aims to calculate the kWh cost of electricity produced by four types of wind turbines. The wind climate of the region is determined using WAsP software, based on wind speed and direction measurements at 10 m a.g.l. over a period of 10 years, from 2007 to 2016. The annual characteristics of the wind are calculated and their respective values are: 5.3 m/s for the average speed, 6 m/s and 2.04 for the Weibull parameters A and k and 169 W/m 2 for the power density. The wind speed at 10 m is mapped over the entire study area and an optimal site is chosen for the installation of a wind farm. Four turbine models are chosen and the annual energy produced by each of them at the site is calculated as well as the cost per unit (CPU). The minimum cost of electricity generated is $0.0144 / kWh for an Annual Energy Production of 10.616 GWh and is given by the VESTAS V90 rated power of 2MW turbine. Finally, the annual energy produced by a wind farm consisting of five (05) VestasV90-2MW, is estimated to be about 51 GWh with wake losses of the order of it%.
- 1 November 2018
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-5
Comparative Study Of Wind Pumping Performance In Two Algerian Coastal And Saharan Regions
This work proposes to carry out a comparative study of wind pumping performances in two different zones characterized by their climatic differences. To achieve this goal, we must first quantify the energy potential of the wind in order to optimize the design of the wind pumping system, which consists of a whisper of 1KW. The available wind potential was evaluated using the OWC utility of the Atlas Wind Analysis and Application Program (WAsP software). The wind data used are measurements taken by a research team of the UDES during the whole year of 2016 for the site of bouismail and the data of ONM 2016 for Adrar. The tower height of the wind turbine is first optimized according to the height of the monomer and the pumping rate increases to meet the needs of a good irrigation field. A global modeling system, correlated to the available characteristic of each site, is carried out to estimate the flows taken from the hourly scales, the daily scales and the scales of the year. Finally, the results are compared and the recommendations given.
- 1 November 2018
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-5
Comparative Study Of Wind Pumping Performance In Two Algerian Coastal And Saharan Regions
This work proposes to carry out a comparative study of wind pumping performances in two different zones characterized by their climatic differences. To achieve this goal, we must first quantify the energy potential of the wind in order to optimize the design of the wind pumping system, which consists of a whisper of 1KW. The available wind potential was evaluated using the OWC utility of the Atlas Wind Analysis and Application Program (WAsP software). The wind data used are measurements taken by a research team of the UDES during the whole year of 2016 for the site of bouismail and the data of ONM 2016 for Adrar. The tower height of the wind turbine is first optimized according to the height of the monomer and the pumping rate increases to meet the needs of a good irrigation field. A global modeling system, correlated to the available characteristic of each site, is carried out to estimate the flows taken from the hourly scales, the daily scales and the scales of the year. Finally, the results are compared and the recommendations given.
- 1 November 2018
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-5
Wind Resource Assessment In The Western Part Of Algerian Highlands, Case Study Of El-Bayadh
the aim of this work is to assess the wind potential in El-Bayadh region, located in the western part of Algerian highlands, using 12 years collected data. The statistical analysis at the measurement mast give the studied region with a significant wind potential, approved with an annual mean wind speed equal to 4.83 m/s and an annual mean power density of 133W/m 2 at 10m over ground level. Regarding the temporal study, it was found that the studied site is windiest from February until March, while the night time is relatively calm. The use of WAsP software leads us to evaluate the distributions of mean wind speed over the region of El-Bayadh and to simulate the energy produced by a hypotheticals wind farms established in the two windiest areas in the region. The wind farm layout optimization using wind turbines of 2 MW rated capacity from Bonus manufacturer has allowed to maximize the simulated annual energy production and the full load hours for the two simulated wind farms. Finally, the economic analysis gives a cost per kWh less than 0.0142 US$ for both wind parks.
- 1 November 2018
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-5
Wind Resource Assessment In The Western Part Of Algerian Highlands, Case Study Of El-Bayadh
the aim of this work is to assess the wind potential in El-Bayadh region, located in the western part of Algerian highlands, using 12 years collected data. The statistical analysis at the measurement mast give the studied region with a significant wind potential, approved with an annual mean wind speed equal to 4.83 m/s and an annual mean power density of 133W/m 2 at 10m over ground level. Regarding the temporal study, it was found that the studied site is windiest from February until March, while the night time is relatively calm. The use of WAsP software leads us to evaluate the distributions of mean wind speed over the region of El-Bayadh and to simulate the energy produced by a hypotheticals wind farms established in the two windiest areas in the region. The wind farm layout optimization using wind turbines of 2 MW rated capacity from Bonus manufacturer has allowed to maximize the simulated annual energy production and the full load hours for the two simulated wind farms. Finally, the economic analysis gives a cost per kWh less than 0.0142 US$ for both wind parks.
- 1 November 2018
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-7
Prediction Of Vertical Wind Speed By Artificial Neural Network For Wind Energy Application In Algeria
this work leads to develop a new tool for the vertical wind speed prediction, by using an artificial neural network (ANN) model. For this purpose, the computations were based on recent data, collected from the highest measurement mast and the only one in Algeria at 50m above ground level (a.g.l) located in Ksar Chellala region, in the occidental part of the Algerian highlands. The ANN prediction model for the vertical wind speed is based on four inputs data, which are wind speed, wind direction, temperature and relative humidity, recorded at 10m a.g.l and the target wind speed recorded at 50m a.g.l. A test was applied to the experimental data, which allow filtering the outliers in the database. The proposed model is validated by comparing between the predicted and measured wind speeds. An excellent results were given by the coefficient of correlation R2=0.99586 and the root mean square error RMSE=0.0001, while the mean absolute percentage error MAPE were found to be equal to 26%. Other hand compared the obtained results with the logarithmic extrapolation law (LEL), one of the commonly used methods in wind speed vertical prediction, where the error is about 1.15 m/s for the ANN proposed model against 0.40 m/s regarding the LEL.
- 1 November 2018
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-7
Prediction Of Vertical Wind Speed By Artificial Neural Network For Wind Energy Application In Algeria
this work leads to develop a new tool for the vertical wind speed prediction, by using an artificial neural network (ANN) model. For this purpose, the computations were based on recent data, collected from the highest measurement mast and the only one in Algeria at 50m above ground level (a.g.l) located in Ksar Chellala region, in the occidental part of the Algerian highlands. The ANN prediction model for the vertical wind speed is based on four inputs data, which are wind speed, wind direction, temperature and relative humidity, recorded at 10m a.g.l and the target wind speed recorded at 50m a.g.l. A test was applied to the experimental data, which allow filtering the outliers in the database. The proposed model is validated by comparing between the predicted and measured wind speeds. An excellent results were given by the coefficient of correlation R2=0.99586 and the root mean square error RMSE=0.0001, while the mean absolute percentage error MAPE were found to be equal to 26%. Other hand compared the obtained results with the logarithmic extrapolation law (LEL), one of the commonly used methods in wind speed vertical prediction, where the error is about 1.15 m/s for the ANN proposed model against 0.40 m/s regarding the LEL.
- 1 November 2018
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-5
Wind Resources Assessment of an Algerian Arid Area Using a CFD Model
Computational Fluid Dynamics (CFD) modeling has become an essential tool in wind assessment due to the intricacies of wind flow and the complexity of urban structures. A detailed CFD study of wind flow is essential to evaluate the wind resources for the selection of the most suitable areas for the installation of wind farms intended for the production of electrical energy as well as the design of appropriate wind turbines. The wind potential available in Naama region is assessed using WindSim, a software based on the solution of the 3D Reynolds averaged Navier-Stokes (RANS) equations. The RNG k -ε turbulence model is applied for the closure of the equations. First, three- hourly wind speed and direction data for Naama weather station are used to assess the statistical characteristics of wind speed and wind potential at 10 m above the ground level. Then the numerical simulations are performed to set up the wind speed and power density maps at 10 m and 80 m height above the ground level. Thereafter, the performance of a 40 MW wind park located in a selected area is evaluated.
- 1 November 2018
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-5
Wind Resources Assessment of an Algerian Arid Area Using a CFD Model
Computational Fluid Dynamics (CFD) modeling has become an essential tool in wind assessment due to the intricacies of wind flow and the complexity of urban structures. A detailed CFD study of wind flow is essential to evaluate the wind resources for the selection of the most suitable areas for the installation of wind farms intended for the production of electrical energy as well as the design of appropriate wind turbines. The wind potential available in Naama region is assessed using WindSim, a software based on the solution of the 3D Reynolds averaged Navier-Stokes (RANS) equations. The RNG k -ε turbulence model is applied for the closure of the equations. First, three- hourly wind speed and direction data for Naama weather station are used to assess the statistical characteristics of wind speed and wind potential at 10 m above the ground level. Then the numerical simulations are performed to set up the wind speed and power density maps at 10 m and 80 m height above the ground level. Thereafter, the performance of a 40 MW wind park located in a selected area is evaluated.