AAAbderrahman Ait Ali

Abderrahman Ait Ali

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article

Previous Organizations / Institutes

The organizations / institutes from the scholar's other articles in the past ten years


Abderrahman Ait Ali has a total of 36 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    Life Cycle Cost Analysis of Railway Track Sections Using Look-up Tables

    by Abderrahman Ait-Ali, Kristofer Odolinski, Emma From, Jonathan Leung, Peter Torstensson, Arne Nissen, P. -O. Larsson-Kråik, Sebastian Stichel

    Railways are challenged by increasing traffic volumes, ageing infrastructure, and the need for resource-efficient infrastructure management. Traditional life cycle cost analysis (LCCA) approaches have been applied at the level of individual components, limiting their large-scale use. Meanwhile, sustainability and climate targets require that maintenance and renewal strategies also account for environmental impacts and circularity practices, e.g., reuse or recycling of rail material. This paper presents a scalable framework for LCCA of railway track using pre-calculated look-up tables derived from engineering simulations. These tables capture degradation mechanisms such as wear, rolling contact fatigue, and gauge widening under varying infrastructure and operation conditions. Combined with LCCA, they enable the evaluation of maintenance strategies, e.g., rail grinding, that incorporate material and labor costs, capacity possession costs, and environmental impacts. A circularity coefficient is used to assess the benefits of material reuse and recycling in renewals. The framework is extended from individual rails to track sections composed of multiple adjacent tracks with different characteristics. By optimizing maintenance interventions over the track section’s lifetime, the methodology minimizes total LCC while accounting for economies of scale in capacity possessions. A case study based on the Iron Ore Line in Sweden illustrates the applicability of the approach, showing that LCCA and optimization across curves and tangent sections support more resource-efficient maintenance planning. The framework provides an adaptable decision support tool using existing LCCA methods by combining engineering-based degradation modelling with environmental assessment and circularity, and by scaling the analysis to track sections relevant for procurement and contract design.

  • Samhällsekonomisk prioritering av underhållsåtgärder för ökad punktlighet

    by Abderrahman Ait-Ali, Zohreh Ranjbar

    Projektet Priopunkt har genomförts som ett KAJT-projekt av Linköpings universitet och RISE under perioden 2024–2026. Utgångspunkten har varit att traditionella mått för punktlighet och försening, såsom RT+5 och merförsening, i första hand beskriver tågens punktlighet men i mindre grad fångar hur störningar påverkar resenärer och samhällsekonomin. Syftet har därför varit att utveckla och pröva en metodik för samhällsekonomisk värdering av störningar i järnvägssystemet som kan användas som ett kompletterande underlag för prioritering av underhålls- och andra åtgärder för ökad punktlighet. Projektet kombinerar tre delar: förseningsbidrag (per station), resandeuppskattningar och samhällsekonomiska kalkylvärden enligt ASEK. Förseningsbidrag används för att analysera hur störningar påverkar tågets försening längs resan. För att uppskatta hur många passagerare som berörs på olika delsträckor och vid olika stationer används Sampers-baserade resandeuppskattningar eftersom faktiska passagerardata saknas. Genom att kombinera dessa delar har projektet kunnat beräkna både passagerarförseningar och samhällsekonomiska kostnader för enskilda störningar, platser och anläggningstyper. Metodiken omfattar även analys av kritiska störningar, inklusive en vidareutveckling till kritiska störningar per station baserat på kanalpunktlighet (RT+3). Metodiken har tillämpats i en fallstudie på Södra stambanan. Resultaten visar att prioriteringar förändras när analysen går från ett rent tågbaserat mått till passagerarförsening och samhällsekonomisk kostnad. Vissa platser och anläggningstyper framstår som betydligt viktigare när hänsyn tas till hur många resenärer som påverkas och hur stora de samhällsekonomiska konsekvenserna blir. Känslighetsanalyserna visar samtidigt att resultaten är relativt robusta för variationer i beläggningsantaganden, men att prioriteringsbilden påverkas mer av hur långa händelser avgränsas och inkluderas i analysen, exempelvis med hjälp av klustrering. Projektet visar hur punktlighetsanalys kan kompletteras med ett resenärs- och samhällsekonomiskt perspektiv. Metodiken ger Trafikverket ett underlag för att identifiera var störningar orsakar störst konsekvenser för samhälle, och kan komplettera befintliga mått i prioritering av punktlighetshöjande åtgärder. Den kan implementeras i ett praktiskt verktyg och i fortsatt forskning, exempelvis för att analysera och följa upp effekter av genomförda åtgärder.

  • Open Access

    Samplanering av trafikpåverkande åtgärder och trafikflöden för stråkplanering. SATT-SP: metoder, verktyg och fallstudier

    by Tomas Lidén, Filip Kristofersson, Abderrahman Ait-Ali

    Planning and coordinating the large amount of track work carried out on a national railway system is a major challenge. At the Swedish Transport Administration, the process of planning track works four to six years before a particular traffic year is termed corridor planning. Corridor planning should considerthe effects on designated traffic flows. Today, this planning is mainly carried out manually and with limited support for analyzing interaction effects, traffic impact on the entire network, and socio-economic impact. The research project SATT-SP (Joint planning of temporary capacity restrictions and traffic flows for long term corridor planning) has studied how a previously presented bi-level optimization model for scheduling track work and traffic adjustments can be further developed to provide a tool support for the Swedish Transport Administration's corridor planning. This includes functionality for presenting and analyzing different plans, including socio-economic valuation. This report presents the conducted work and the results that have been achieved, both regarding model and tool development, and the case studies that have been done in close collaboration with the experts at the Swedish Transport Administration. The results show that these tools, with good solution performance, can produce plans for one to several years on the entire Swedish railway network, including detailed calculations of daily traffic adjustments on 1,500 train flow relations for the entire traffic year. The strength of these tools is that they can handle numerous projects and traffic relationships on a large geographical network, with a reasonable level of detail for both project scheduling and traffic flows. The models also support segmentation into different train or traffic types, in a way that alignswith upcoming European processes for planning and allocation of railway capacity.

  • Simulation-based evaluation of maintenance strategies using look-up tables

    by Abderrahman Ait-Ali, Saeed Hossein-Nia, Kristofer Odolinski, Peter Torstensson, Sebastian Stichel

    A computationally efficient approach, that uses pre-calculated simulation-based look-up tables of long-term track degradation to evaluate and optimise maintenance strategies, is proposed. The methodology combines iterative multibody simulations – to model the evolution of rail profiles and the distribution of rolling-contact fatigue under realistic conditions – and an optimisation procedure aimed at minimising the lifecycle costs. The research explores the interplay between long-term track degradation, maintenance interventions, and lifecycle costs. The approach is illustrated through an application to a small radius curve on Sweden’s Iron-ore line, focusing on rail grinding and track gauge correction. Optimal renewal and maintenance strategies are analysed for different scenarios such as rail profiles and axle loads. The results highlight the importance of gauge widening rates, rail profiles and axle loads in track deterioration as well as their effects on the asset’s lifecycle costs. A sensitivity analysis is conducted to study the impact of different parameters such as maintenance and renewal costs, and gauge widening rates. The proposed approach offers infrastructure managers a systematic method for efficient planning of maintenance interventions on various assets. Future work could explore applications to larger infrastructure areas, encompassing multiple assets with a complex composition of tangent and curved track sections as well as switches & crossings.


  • Open Access

    Evaluating the mix of maintenance activities on railway crossings with respect to life-cycle costs

    by Abderrahman Ait Ali, Kristofer Odolinski, Björn Pålsson, Peter Torstensson

    Switches & crossings (S&Cs) are vital assets as they allow for increased railway capacity by introducing flexibility and connectivity in railway networks. At the same time, this makes them critical since they can cause costly delays and disruptions if they are not well maintained. This motivates studies to improve maintenance strategies of S&Cs, considering both the life-cycle costs (LCC) of the assets and socio-economic transportation costs for passengers and freight customers. In this paper, the interdependence between deterioration mechanisms, maintenance activities, and expected LCC (including transportation costs) is investigated using a combination of mechanical and econometric modelling. The interrelation between the degradation of contact geometry and track settlement is analysed using simulations of dynamic vehicle–turnout interaction. Long-term mechanical degradation of the S&C is simulated for different maintenance strategies that correspond to different timing of the associated maintenance measures (crossing repair welding and tamping). This provides the basis for analysing the interdependence between preventive and corrective activities using econometric modelling. Based on a case study of a common type of S&Cs in the Swedish infrastructure, the impact of different maintenance strategies on LCC and transportation costs is analysed. Opportunities and challenges in the development of more socio-economically effective maintenance strategies of S&Cs are discussed.


  • Assessing Innovations in High-Speed Rail Infrastructure

    by Abderrahman Ait-Ali, Filiz Kurt, Alessa Isberner, Kristofer Odolinski, Mats Berg

  • Open Access

    Minimal utilization rate for railway maintenance windows: a cost-benefit approach

    by Abderrahman Ait Ali, Tomas Lidén

    Methods for economic assessment are often used in the rail sector to evaluate large infrastructure investments such as new high-speed lines. With larger networks and ageing infrastructure, these methods can also be used for planning maintenance. In this paper, we focus on the newly introduced concept of maintenance windows in Sweden. These are pre-allocated slots in the train timetable dedicated to performing, among others, periodic/frequent maintenance activities. To justify the pre-allocation of such windows, this study presents a method to find minimal utilization rates depending on window designs and traffic situations. Using a cost-benefit approach, the windows are assessed using a total social cost including work costs, loss in traffic production and reliability gains in future traffic. Based on a case study from the Southern main line in Sweden, we study the minimal utilization rate in different test scenarios, i.e., night or day shifts, asset degradation functions and designs of maintenance windows. The results show that lower utilization rates (4-42%) can be accepted during low-volume traffic or for partial closures, while higher utilization rates (47-83%) are required for full closures during high-volume traffic. Whether the rates are measured as the share of used window time or the share of utilized windows is less important, especially when higher utilization is required. Sensitivity analyses of asset knowledge indicate that parameters such as asset degradation function and minimum asset quality (and to a lesser extent traffic volume, discount rate and failure likelihood) can have a substantial effect on the minimum required utilization rates.


  • Open Access

    The value of additional data for public transport origin–destination matrix estimation

    by Abderrahman Ait-Ali, Jonas Eliasson

    Passenger origin–destination data is an important input for public transport planning. In recent years, new data sources have become increasingly common through the use of the automatic collection of entry counts, exit counts and link flows. However, collecting such data can be sometimes costly. The value of additional data collection hence has to be weighed against its costs. We study the value of additional data for estimating time-dependent origin–destination matrices, using a case study from the London Piccadilly underground line. Our focus is on how the precision of the estimated matrix increases when additional data on link flow, destination count and/or average travel distance is added, starting from origin counts only. We concentrate on the precision of the most policy-relevant estimation outputs, namely, link flows and station exit flows. Our results suggest that link flows are harder to estimate than exit flows, and only using entry and exit data is far from enough to estimate link flows with any precision. Information about the average trip distance adds greatly to the estimation precision. The marginal value of additional destination counts decreases only slowly, so a relatively large number of exit station measurement points seem warranted. Link flow data for a subset of links hardly add to the precision, especially if other data have already been added.


  • Open Access

    European railway deregulation: an overview of market organization and capacity allocation

    by Abderrahman Ait Ali, Jonas Eliasson

    European railways have been reorganized to allow for market competition. Thus, train services have been vertically separated from infrastructure management which allows several operators to compete. Different ways have emerged for vertical separation, capacity allocation and track access charges. This paper reviews important deregulation aspects from a number of European countries. The study compares how competition has been introduced and regulated with focus on describing capacity allocation and track access charges. Although guided by the same European legislation, we conclude that the studied railways have different deregulation outcomes, e.g. market organization, capacity allocation. Besides, few countries have so far managed to have efficient and transparent capacity allocation. Although allowed by the legislation, market-based allocation is absent or never used. To foster more competition which can yield substantial social benefits, the survey indicates that most European railways still need to develop and experiment with more efficient and transparent capacity allocation procedures.