Jintang Shi
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Jintang Shi has a total of 3 co-authors. Here are the top co-authors by number of shared publications:
- Haodong Li
School of Traffic and Transportation, Beijing Jiaotong University, Beijing, China
3 shared publications Daoqi Wang
Transportation Department, China State Railway Group Company Ltd., Beijing, China
1 shared publication- Pieter Vansteenwegen
KU Leuven
1 shared publication
Latest Publications
- Open Access
- 21 February 2024
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Access
- Vol. 12, 38615-38630
Reschedule the Shunting and Service Scheduling Plan After Disturbances at a Chinese High-Speed Railway Depot
Electrical Multiple Units (EMUs) need to undergo services like repairing, cleaning and wheel turning according to a train shunting and service scheduling (SSS) plan at the high-speed railway depot. Disturbances in the timetable at the station and overtime services affect the original SSS plan. Therefore, frequent modifications to the original SSS plan and rescheduling of some EMUs are required to recover the feasibility of the plan. This paper considers a rescheduling method for integrating train shunting, service scheduling and routing at EMU depots with various layouts. In this paper, the movement process of EMUs at depots is represented with the help of a two-layer time-space network. A heuristic algorithm for rescheduling is designed. Case studies based on a real-world depot show that the heuristic can repair the original SSS plan in 180 seconds while ensuring that the new SSS plan is as close as possible to the original SSS plan.
- 21 February 2024
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Access
- Vol. 12, 38615-38630
Open AccessReschedule the Shunting and Service Scheduling Plan After Disturbances at a Chinese High-Speed Railway Depot
Electrical Multiple Units (EMUs) need to undergo services like repairing, cleaning and wheel turning according to a train shunting and service scheduling (SSS) plan at the high-speed railway depot. Disturbances in the timetable at the station and overtime services affect the original SSS plan. Therefore, frequent modifications to the original SSS plan and rescheduling of some EMUs are required to recover the feasibility of the plan. This paper considers a rescheduling method for integrating train shunting, service scheduling and routing at EMU depots with various layouts. In this paper, the movement process of EMUs at depots is represented with the help of a two-layer time-space network. A heuristic algorithm for rescheduling is designed. Case studies based on a real-world depot show that the heuristic can repair the original SSS plan in 180 seconds while ensuring that the new SSS plan is as close as possible to the original SSS plan.
- 2 October 2023
- Published by Elsevier in Computers & Industrial Engineering
- Vol. 185
Operational planning of international freight trains considering the dynamic demands and capacities of border ports
- 2 October 2023
- Published by Elsevier in Computers & Industrial Engineering
- Vol. 185
Operational planning of international freight trains considering the dynamic demands and capacities of border ports
- Open Access
- 31 December 2019
- Published by Wiley in Journal of Advanced Transportation
- Vol. 2019, 1-15
Optimization of the Shunting Operation Plan at Electric Multiple Units Depots
The number of standard electric multiple units (EMUs) in China has increased from 1003 in 2013 to 3256 in 2018. For maintaining all EMUs in time, the high-speed rail system with the fast-developing number of EMUs is facing growing pressure. The maintenance and cleaning capacity of an EMU depot can be improved by a better shunting operation planning (SOP). This paper considers an SOP problem at EMU depots, which may have two types of yards, namely, stub-end and through. Every track at an EMU depot has two sections and can accommodate two short standard EMUs of 8 railcars or one long EMU of 16 railcars. As the SOP is currently handled manually by dispatchers, this paper proposes two integer linear programming models for two types of yards for daily planning and dispatching, which aim at minimizing the total delay time of all EMUs during the planning horizon. A Reduced Variable Neighborhood Search (RVNS) algorithm is designed to improve the solution efficiency. The results of the numerical experiment show that the RVNS algorithm can yield an optimal maintenance plan in a few seconds for depots of different layout types and can be applied to a computer-aided planning system. The track utilization rate of the maintenance yard with the stub-end type is higher than that of the through type. The stub-end type may be more suitable for the current schedule, as its total track utilization rate is much lower than the through type.
- 31 December 2019
- Published by Wiley in Journal of Advanced Transportation
- Vol. 2019, 1-15
Open AccessOptimization of the Shunting Operation Plan at Electric Multiple Units Depots
The number of standard electric multiple units (EMUs) in China has increased from 1003 in 2013 to 3256 in 2018. For maintaining all EMUs in time, the high-speed rail system with the fast-developing number of EMUs is facing growing pressure. The maintenance and cleaning capacity of an EMU depot can be improved by a better shunting operation planning (SOP). This paper considers an SOP problem at EMU depots, which may have two types of yards, namely, stub-end and through. Every track at an EMU depot has two sections and can accommodate two short standard EMUs of 8 railcars or one long EMU of 16 railcars. As the SOP is currently handled manually by dispatchers, this paper proposes two integer linear programming models for two types of yards for daily planning and dispatching, which aim at minimizing the total delay time of all EMUs during the planning horizon. A Reduced Variable Neighborhood Search (RVNS) algorithm is designed to improve the solution efficiency. The results of the numerical experiment show that the RVNS algorithm can yield an optimal maintenance plan in a few seconds for depots of different layout types and can be applied to a computer-aided planning system. The track utilization rate of the maintenance yard with the stub-end type is higher than that of the through type. The stub-end type may be more suitable for the current schedule, as its total track utilization rate is much lower than the through type.