Shweta Shrestha
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Shweta Shrestha has a total of 7 co-authors. Here are the top co-authors by number of shared publications:
- Nadarajah Ravichandran
Clemson Univ
6 shared publications - Parishad Rahbari
Clemson Univ
3 shared publications J.A. Attenhofer
1 shared publicationKalyan Piratla
1 shared publicationM. Raveendra
1 shared publicationN. Ravichandran
1 shared publication
Latest Publications
- Open Access
- 1 June 2018
- Published by Elsevier in Soils and Foundations
- Vol. 58 (3) , 744-755
Robust design and optimization procedure for piled-raft foundation to support tall wind turbine in clay and sand
- 1 June 2018
- Published by Elsevier in Soils and Foundations
- Vol. 58 (3) , 744-755
Open AccessRobust design and optimization procedure for piled-raft foundation to support tall wind turbine in clay and sand
- 17 April 2018
- Published by Taylor & Francis in International Journal of Geotechnical Engineering
- Vol. 15 (5) , 574-586
Performance of retaining wall backfilled with tire aggregate under static and dynamic loading conditions: conventional designs and finite element simulations
The static and dynamic behaviours of a retaining wall backfilled with tire aggregate are investigated in this paper through conventional designs as well as coupled finite element simulations. First, a literature survey is conducted to compile the key geotechnical engineering properties of tire aggregate. The data show that the properties vary with the shred size and possess properties desirable to be considered as a retaining wall backfill. Geotechnical designs and computer simulations show significant reductions in structural demand in terms of maximum shear force and bending moment, and construction cost in terms of excavation behind the wall, material required for constructing a retaining wall, and the volume of backfill material when tire aggregate is used as the backfill. The results of a parametric study indicate that the economic advantage is significant even with the highest and the lowest values of the key properties and the parameters of input motion.
- 17 April 2018
- Published by Taylor & Francis in International Journal of Geotechnical Engineering
- Vol. 15 (5) , 574-586
Performance of retaining wall backfilled with tire aggregate under static and dynamic loading conditions: conventional designs and finite element simulations
The static and dynamic behaviours of a retaining wall backfilled with tire aggregate are investigated in this paper through conventional designs as well as coupled finite element simulations. First, a literature survey is conducted to compile the key geotechnical engineering properties of tire aggregate. The data show that the properties vary with the shred size and possess properties desirable to be considered as a retaining wall backfill. Geotechnical designs and computer simulations show significant reductions in structural demand in terms of maximum shear force and bending moment, and construction cost in terms of excavation behind the wall, material required for constructing a retaining wall, and the volume of backfill material when tire aggregate is used as the backfill. The results of a parametric study indicate that the economic advantage is significant even with the highest and the lowest values of the key properties and the parameters of input motion.
- 1 February 2018
- Published by Taylor & Francis in International Journal of Geotechnical Engineering
- Vol. 14 (4) , 395-408
Performance- and cost-based robust design optimization procedure for typical foundations for wind turbine
A cost- and performance-based robust design optimisation procedure considering the uncertainties in soil properties and wind speed for three typical foundations (raft, pile group and piled raft) for tall wind turbines on clayey and sandy soils is presented in this paper. From the conventional geotechnical designs, it was found that the design is controlled by differential settlement and therefore considered as the response of concern in the robust design optimisation. The robust design optimisation was performed using Non-dominated Sorting Genetic Algorithm II coupled with Monte Carlo simulation to systematically incorporate the uncertainties in the soil properties and wind speed that have a direct impact on the lateral and moment load acting on the foundation. The total construction cost of the foundation and the standard deviation of the differential settlement were considered as the objectives of interest to be minimised. This procedure resulted in a set of acceptable designs presented in a graphical form called Pareto front for each foundation type on clayey and sandy soils. The comparison of Pareto fronts for the three foundations showed that the pile group or piled raft foundation is economical with higher robustness while the raft foundation is economical with lower robustness. Further, the optimum designs of each type of foundation on clayey and sandy soils were determined using the knee point concept from the Pareto front. The easy-to-use Pareto fronts can be used for selecting suitable foundation type and corresponding design variables for a given performance and cost limitations.
- 1 February 2018
- Published by Taylor & Francis in International Journal of Geotechnical Engineering
- Vol. 14 (4) , 395-408
Performance- and cost-based robust design optimization procedure for typical foundations for wind turbine
A cost- and performance-based robust design optimisation procedure considering the uncertainties in soil properties and wind speed for three typical foundations (raft, pile group and piled raft) for tall wind turbines on clayey and sandy soils is presented in this paper. From the conventional geotechnical designs, it was found that the design is controlled by differential settlement and therefore considered as the response of concern in the robust design optimisation. The robust design optimisation was performed using Non-dominated Sorting Genetic Algorithm II coupled with Monte Carlo simulation to systematically incorporate the uncertainties in the soil properties and wind speed that have a direct impact on the lateral and moment load acting on the foundation. The total construction cost of the foundation and the standard deviation of the differential settlement were considered as the objectives of interest to be minimised. This procedure resulted in a set of acceptable designs presented in a graphical form called Pareto front for each foundation type on clayey and sandy soils. The comparison of Pareto fronts for the three foundations showed that the pile group or piled raft foundation is economical with higher robustness while the raft foundation is economical with lower robustness. Further, the optimum designs of each type of foundation on clayey and sandy soils were determined using the knee point concept from the Pareto front. The easy-to-use Pareto fronts can be used for selecting suitable foundation type and corresponding design variables for a given performance and cost limitations.
- 1 February 2018
- Published by American Society of Civil Engineers (ASCE) in International Journal of Geomechanics
- Vol. 18 (2)
Geotechnical Design and Design Optimization of a Pile-Raft Foundation for Tall Onshore Wind Turbines in Multilayered Clay
Although the pile-raft foundation is preferred for supporting a tall wind turbine, the geotechnical design and selection of suitable design parameters are based on a complex procedure. Except the foundation, all the other aboveground components are precast members that are assembled at the project site to build a wind turbine. Therefore, it is necessary to consider the possible variations in soil properties and wind speed in the design of the foundation. In this paper, a reliability-based robust design procedure for a pile-raft foundation that supports a 130-m-tall wind turbine on a layered clayey soil is presented. Upon completion of the geotechnical design for the mean wind speed and undrained shear strength, a parametric study and Monte Carlo simulation were conducted by varying the wind speed and the undrained cohesion of each layer to establish a relationship among the design variables (number and length of piles and radius of the raft) and the random variables (wind speed and undrained cohesion). Finally, a reliability-based robust design was created considering the total cost and robustness as the objectives. The standard deviation of the response of concern, which is the differential settlement, was considered the measure of robustness. The optimization yielded a set of preferred designs known as the Pareto front, and the suitable design was selected for a given cost limitation and performance requirement using the Pareto front.
- 1 February 2018
- Published by American Society of Civil Engineers (ASCE) in International Journal of Geomechanics
- Vol. 18 (2)
Geotechnical Design and Design Optimization of a Pile-Raft Foundation for Tall Onshore Wind Turbines in Multilayered Clay
Although the pile-raft foundation is preferred for supporting a tall wind turbine, the geotechnical design and selection of suitable design parameters are based on a complex procedure. Except the foundation, all the other aboveground components are precast members that are assembled at the project site to build a wind turbine. Therefore, it is necessary to consider the possible variations in soil properties and wind speed in the design of the foundation. In this paper, a reliability-based robust design procedure for a pile-raft foundation that supports a 130-m-tall wind turbine on a layered clayey soil is presented. Upon completion of the geotechnical design for the mean wind speed and undrained shear strength, a parametric study and Monte Carlo simulation were conducted by varying the wind speed and the undrained cohesion of each layer to establish a relationship among the design variables (number and length of piles and radius of the raft) and the random variables (wind speed and undrained cohesion). Finally, a reliability-based robust design was created considering the total cost and robustness as the objectives. The standard deviation of the response of concern, which is the differential settlement, was considered the measure of robustness. The optimization yielded a set of preferred designs known as the Pareto front, and the suitable design was selected for a given cost limitation and performance requirement using the Pareto front.
- 1 June 2017
- Published by American Society of Civil Engineers (ASCE)
- p. 403-412
Design Optimization of Piled-Raft Foundation for Tall Wind Turbine on Clayey Soil
A geotechnical design optimization procedure for piled-raft foundation to support a 130 m tall wind turbine in a clayey soil is presented in this paper. Based on the initial geotechnical design it was found that the final design was controlled by differential settlement which was later considered as the response of concern for design optimization. A parametric study was also conducted to examine the effect of undrained cohesion and wind speed (random variables) on the design parameters (number and length of piles and radius of raft). Finally, a robust design optimization was conducted using genetic algorithm coupled with Monte Carlo simulation considering the total cost of foundation and the standard deviation of the differential settlement as the objectives. This procedure resulted in a set of acceptable designs called Pareto front which can be used to select the best design for a given performance requirement and cost limitation.
- 1 June 2017
- Published by American Society of Civil Engineers (ASCE)
- p. 403-412
Design Optimization of Piled-Raft Foundation for Tall Wind Turbine on Clayey Soil
A geotechnical design optimization procedure for piled-raft foundation to support a 130 m tall wind turbine in a clayey soil is presented in this paper. Based on the initial geotechnical design it was found that the final design was controlled by differential settlement which was later considered as the response of concern for design optimization. A parametric study was also conducted to examine the effect of undrained cohesion and wind speed (random variables) on the design parameters (number and length of piles and radius of raft). Finally, a robust design optimization was conducted using genetic algorithm coupled with Monte Carlo simulation considering the total cost of foundation and the standard deviation of the differential settlement as the objectives. This procedure resulted in a set of acceptable designs called Pareto front which can be used to select the best design for a given performance requirement and cost limitation.
- 30 March 2017
- Published by American Society of Civil Engineers (ASCE)
- p. 204-213
Robust Geotechnical Design of Piled-Raft Foundations for Tall Onshore Wind Turbines
A robust geotechnical design optimization procedure for piled-raft foundation to support a 130 m tall wind turbine on clayey soil is presented in this study. The initial geotechnical design indicated that the differential settlement of the piled-raft system controls the final design. A parametric study was conducted by varying the wind speed and undrained cohesion to establish a relationship between the design variables (number and length of pile and radius of raft) and random variables (wind speed and undrained cohesion). Finally, a robust design optimization was conducted considering the material cost and the robustness as the objectives. The standard deviation of the response which is the differential settlement of the foundation system was considered as the measure of robustness of the design. The optimization yielded a set of acceptable designs and presented as a Pareto front which can be used to select the best design using the knee point concept.
- 30 March 2017
- Published by American Society of Civil Engineers (ASCE)
- p. 204-213
Robust Geotechnical Design of Piled-Raft Foundations for Tall Onshore Wind Turbines
A robust geotechnical design optimization procedure for piled-raft foundation to support a 130 m tall wind turbine on clayey soil is presented in this study. The initial geotechnical design indicated that the differential settlement of the piled-raft system controls the final design. A parametric study was conducted by varying the wind speed and undrained cohesion to establish a relationship between the design variables (number and length of pile and radius of raft) and random variables (wind speed and undrained cohesion). Finally, a robust design optimization was conducted considering the material cost and the robustness as the objectives. The standard deviation of the response which is the differential settlement of the foundation system was considered as the measure of robustness of the design. The optimization yielded a set of acceptable designs and presented as a Pareto front which can be used to select the best design using the knee point concept.
- 1 November 2016
- Published by Elsevier in Soil Dynamics and Earthquake Engineering
- Vol. 90, 227-239
Design and analysis of retaining wall backfilled with shredded tire and subjected to earthquake shaking
- 1 November 2016
- Published by Elsevier in Soil Dynamics and Earthquake Engineering
- Vol. 90, 227-239
Design and analysis of retaining wall backfilled with shredded tire and subjected to earthquake shaking
- 8 August 2016
- Published by American Society of Civil Engineers (ASCE)
- p. 217-226
Design and Analysis of Foundations for Onshore Tall Wind Turbines
Wind turbines play vital role in producing sustainable and clean energy to fulfill the growing need of energy. However, the design of foundation to support wind turbines, especially the taller tower which access steady and higher speed wind is always a challenge due to larger loads exerted at the foundation level. In this paper, the economic advantage of using raft foundation, pile group foundation, and piled-raft foundation is discussed based on the preliminary design results and parametric studies. For the sample design, the axial load, lateral load, and moment at the base of the tower were computed assuming the tower height of 130 m and mean wind speed of 160 mph. The comparison of the volume of material required for each foundation type showed that the piled-raft is the most economical option for the given site and loading conditions. A parametric study conducted by increasing the wind speed, tower height, and pile size resulted in increase in volume of material for the piled-raft. Another study on the effect of number of piles on the settlement revealed that the increase in number of piles while keeping the size and length constant, resulted in significant decrease in settlement up to certain number of piles and thereafter the addition of piles had negligible contribution in reducing the settlement.
- 8 August 2016
- Published by American Society of Civil Engineers (ASCE)
- p. 217-226
Design and Analysis of Foundations for Onshore Tall Wind Turbines
Wind turbines play vital role in producing sustainable and clean energy to fulfill the growing need of energy. However, the design of foundation to support wind turbines, especially the taller tower which access steady and higher speed wind is always a challenge due to larger loads exerted at the foundation level. In this paper, the economic advantage of using raft foundation, pile group foundation, and piled-raft foundation is discussed based on the preliminary design results and parametric studies. For the sample design, the axial load, lateral load, and moment at the base of the tower were computed assuming the tower height of 130 m and mean wind speed of 160 mph. The comparison of the volume of material required for each foundation type showed that the piled-raft is the most economical option for the given site and loading conditions. A parametric study conducted by increasing the wind speed, tower height, and pile size resulted in increase in volume of material for the piled-raft. Another study on the effect of number of piles on the settlement revealed that the increase in number of piles while keeping the size and length constant, resulted in significant decrease in settlement up to certain number of piles and thereafter the addition of piles had negligible contribution in reducing the settlement.