Andrzej Kotarba
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Andrzej Kotarba has a total of 172 co-authors. Here are the top co-authors by number of shared publications:
- Jan Figiel
The Henryk Niewodniczanski Institute of Nuclear Physics, Polish Academy of Sciences, Cracow, Poland
4 shared publications - Janusz J. Chwastowski
Institute of Nuclear Physics Polish Academy of Sciences
4 shared publications A. Eskreys
3 shared publications- E. Gornicki
Institute of Nuclear Physics Polish Academy of Sciences
3 shared publications - Michal Duda
Paul Scherrer Institute
3 shared publications - Piotr Jurkiewicz
The Henryk Niewodniczański Institute of Nuclear Physics, Polish Academy of Sciences, ul. Radzikowskiego 152, 31-342 Kraków, Poland
3 shared publications
Latest Publications
- Open Access
- 17 March 2021
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 31 (5) , 1-4
Preparation and Execution of the Electrical Quality Assurance Program On the LHC Superconducting Circuits During the Second Long Shutdown
The electrical quality assurance (ELQA) of the superconducting circuits of CERN's Large Hadron Collider (LHC) during its second Long Shutdown (LS2) requires the execution of vast measurement campaigns. Each of 1658 electrical circuits as well as the instrumentation of each of the 1746 individual cryo-assemblies housing magnets, bus-bars and other components of the superconducting circuits, has to undergo a series of tests. At the beginning of the shutdown the tests are performed before and after the warm-up from cryogenic temperatures. The same tests are repeated at the end of the shutdown, this time before and after the cool-down. As part of the dipole bypass diode insulation consolidation project and due to the replacement of a few non-conform magnets, additional electrical tests and measurements had to be performed throughout the shutdown period. With each measurement, electrical parameters like resistance, complex impedance, and the quality of the insulation are verified and stored for future reference. Due to the many thousands of measurements to be performed, multiple automated mobile test benches had to be developed for the different test types along with dedicated database and analysis software applications for the documentation and follow-up of the test results and the non-conformities observed.
- 17 March 2021
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 31 (5) , 1-4
Open AccessPreparation and Execution of the Electrical Quality Assurance Program On the LHC Superconducting Circuits During the Second Long Shutdown
The electrical quality assurance (ELQA) of the superconducting circuits of CERN's Large Hadron Collider (LHC) during its second Long Shutdown (LS2) requires the execution of vast measurement campaigns. Each of 1658 electrical circuits as well as the instrumentation of each of the 1746 individual cryo-assemblies housing magnets, bus-bars and other components of the superconducting circuits, has to undergo a series of tests. At the beginning of the shutdown the tests are performed before and after the warm-up from cryogenic temperatures. The same tests are repeated at the end of the shutdown, this time before and after the cool-down. As part of the dipole bypass diode insulation consolidation project and due to the replacement of a few non-conform magnets, additional electrical tests and measurements had to be performed throughout the shutdown period. With each measurement, electrical parameters like resistance, complex impedance, and the quality of the insulation are verified and stored for future reference. Due to the many thousands of measurements to be performed, multiple automated mobile test benches had to be developed for the different test types along with dedicated database and analysis software applications for the documentation and follow-up of the test results and the non-conformities observed.
- 21 January 2016
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 26 (4) , 1-4
Results of the Magnetic Measurements of the Superconducting Magnets for the European XFEL
A new linear accelerator, i.e., the European X-ray Free-Electron Laser (XFEL), is under construction at DESY in Hamburg. The construction started in early 2009, and the commissioning is planned for 2016. The design energy of the electron beam is 17.5 GeV (0.05-4.7 nm wavelength), and more than 27000 flashes/s are expected. The accelerator contains 102 cryomodules equipped with a string of eight superconducting RF cavities and one superconducting magnet package. Each magnet consists of two cos -θ-type correction dipoles, horizontal and vertical deflecting. They are glued onto the surface of the beam pipe and are surrounded by a superferric quadrupole magnet. The package is mounted inside of a compact stainless steel vessel with a length of 30 cm and a diameter of 20 cm. Each package and current lead assembly was tested separately at room temperature and together at 2 K in a dedicated superfluid helium cryostat at DESY. A summary of the results is reported here. During the cold test, special emphasis was given to hysteresis and persistent current effects, as the operating current varies from very low currents at the beginning of the accelerator to the full design current 50 A at the end.
- 21 January 2016
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 26 (4) , 1-4
Results of the Magnetic Measurements of the Superconducting Magnets for the European XFEL
A new linear accelerator, i.e., the European X-ray Free-Electron Laser (XFEL), is under construction at DESY in Hamburg. The construction started in early 2009, and the commissioning is planned for 2016. The design energy of the electron beam is 17.5 GeV (0.05-4.7 nm wavelength), and more than 27000 flashes/s are expected. The accelerator contains 102 cryomodules equipped with a string of eight superconducting RF cavities and one superconducting magnet package. Each magnet consists of two cos -θ-type correction dipoles, horizontal and vertical deflecting. They are glued onto the surface of the beam pipe and are surrounded by a superferric quadrupole magnet. The package is mounted inside of a compact stainless steel vessel with a length of 30 cm and a diameter of 20 cm. Each package and current lead assembly was tested separately at room temperature and together at 2 K in a dedicated superfluid helium cryostat at DESY. A summary of the results is reported here. During the cold test, special emphasis was given to hysteresis and persistent current effects, as the operating current varies from very low currents at the beginning of the accelerator to the full design current 50 A at the end.
- 25 October 2013
- Published by SPIE-Intl Soc Optical Eng
- p. 890329-890329-12
Tests of the superconducting magnets, cavities, and cryomodules for the European XFEL
- 25 October 2013
- Published by SPIE-Intl Soc Optical Eng
- p. 890329-890329-12
Tests of the superconducting magnets, cavities, and cryomodules for the European XFEL
- 4 October 2013
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 24 (3) , 1-4
First Results of the Magnetic Measurements of the Superconducting Magnets for the European XFEL
The European X-ray Free Electron Laser facility (XFEL) is currently under construction at DESY in the Hamburg area in Germany. A linear accelerator consisting of 102 accelerator modules is used to accelerate the electron beam. Each module contains eight superconducting RF cavities and one magnet package, all operating in a 2 K super-fluid helium bath. Each magnet package consists of three nested magnets. Two cos θ-type correction dipole magnets horizontal and vertical deflecting are glued onto the surface of the beam pipe being the inner wall of the cryostat vessel. They are inside of a superferric quadrupole magnet. Each magnet package together with a conduction cooled current lead assembly, based on a CERN design, will be tested at room temperature and at 2 K in a special cryostat XMTS at DESY. It allows access for the field measurement equipment into the magnet bore at room temperature by using an anti-cryostat. The cold magnet project is realized by three groups as in kind contributions to the XFEL project. CIEMAT designs and provides the magnets and DESY the current leads. Magnet testing at DESY is performed together with IFJ PAN. A description of the XMTS facility, the magnetic field measurement systems used (harmonic coils and stretched wire setups) are given. Finally a short discussion of the results obtained for the first third of the magnets is presented. All magnets tested so far perform very well up to the design current. The quality and strength of the magnetic field are as designed.
- 4 October 2013
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 24 (3) , 1-4
First Results of the Magnetic Measurements of the Superconducting Magnets for the European XFEL
The European X-ray Free Electron Laser facility (XFEL) is currently under construction at DESY in the Hamburg area in Germany. A linear accelerator consisting of 102 accelerator modules is used to accelerate the electron beam. Each module contains eight superconducting RF cavities and one magnet package, all operating in a 2 K super-fluid helium bath. Each magnet package consists of three nested magnets. Two cos θ-type correction dipole magnets horizontal and vertical deflecting are glued onto the surface of the beam pipe being the inner wall of the cryostat vessel. They are inside of a superferric quadrupole magnet. Each magnet package together with a conduction cooled current lead assembly, based on a CERN design, will be tested at room temperature and at 2 K in a special cryostat XMTS at DESY. It allows access for the field measurement equipment into the magnet bore at room temperature by using an anti-cryostat. The cold magnet project is realized by three groups as in kind contributions to the XFEL project. CIEMAT designs and provides the magnets and DESY the current leads. Magnet testing at DESY is performed together with IFJ PAN. A description of the XMTS facility, the magnetic field measurement systems used (harmonic coils and stretched wire setups) are given. Finally a short discussion of the results obtained for the first third of the magnets is presented. All magnets tested so far perform very well up to the design current. The quality and strength of the magnetic field are as designed.
- 1 May 2003
- Published by Elsevier in Nuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment
- Vol. 504 (1-3) , 222-227
Aerogel Cherenkov detectors for the luminosity measurement at HERA
- 1 May 2003
- Published by Elsevier in Nuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment
- Vol. 504 (1-3) , 222-227
Aerogel Cherenkov detectors for the luminosity measurement at HERA
- 22 January 2003
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 126-130
Tester of the TRT front-end electronics for the ATLAS-experiment
- 22 January 2003
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 126-130
Tester of the TRT front-end electronics for the ATLAS-experiment
- 1 June 1984
- Published by American Physical Society (APS) in Physical Review D
- Vol. 29 (11) , 2476-2482
Dependence of multiplicity and rapidity distributions on the number of projectile collisions in 200-GeV/cproton-nucleus interactions
Interactions of 200-GeV/c protons on hydrogen, neon, argon, and xenon were studied with a streamer-chamber spectrometer. The number of projectile collisions inside the nucleus and the number of secondary collisions in the intranuclear cascade were estimated. The dependence of multiplicity and rapidity distributions on the number of projectile collisions was analyzed. The predictions of the additive quark model were found to be in qualitative agreement with the results of the experiment.
- 1 June 1984
- Published by American Physical Society (APS) in Physical Review D
- Vol. 29 (11) , 2476-2482
Dependence of multiplicity and rapidity distributions on the number of projectile collisions in 200-GeV/cproton-nucleus interactions
Interactions of 200-GeV/c protons on hydrogen, neon, argon, and xenon were studied with a streamer-chamber spectrometer. The number of projectile collisions inside the nucleus and the number of secondary collisions in the intranuclear cascade were estimated. The dependence of multiplicity and rapidity distributions on the number of projectile collisions was analyzed. The predictions of the additive quark model were found to be in qualitative agreement with the results of the experiment.