Ralph Barone
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Ralph Barone has a total of 16 co-authors. Here are the top co-authors by number of shared publications:
Charles Henville
BC Hydro, Burnaby, Canada
2 shared publicationsD. Charney
BC Hydro
2 shared publicationsG. Josin
BC Hydro
2 shared publicationsG. Neily
BC Hydro
2 shared publicationsMukesh Nagpal
BC Hydro, Burnaby, Canada
2 shared publicationsSka-Hiish Manuel
2 shared publications
Latest Publications
- 28 November 2018
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Power Delivery
- Vol. 34 (2) , 760-768
Wildfire Trips De-Energized Line Shunt Reactor
- 28 November 2018
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Power Delivery
- Vol. 34 (2) , 760-768
Wildfire Trips De-Energized Line Shunt Reactor
- 28 September 2015
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Power Delivery
- Vol. 31 (4) , 1864-1872
Field Verification of Secondary Arc Extinction Logic
Single-phase trip and high-speed reclose (SPTR) schemes applied on extra-high-voltage (EHV) lines offer significant benefits over three-phase schemes as they help maintain synchronism and stability in sparse transmission networks. However, a secondary arc may persist and prevent timely recovery of the air insulation. In this situation, high-speed reclosing will attempt to re-energize the still-faulted line, adding stress to the system instead of benefiting the system from the SPTR scheme. Using staged fault and fault disturbance data recorded from several 500 kV lines, this paper presents validation of an enhanced hybrid scheme incorporating secondary arc extinction detection logic designed to avoid high-speed reclosing onto faults while also allowing single-phase reclose in cases where it would be successful. The new logic is now being applied to several 500 kV lines in BC Hydro to improve transmission system reliability.
- 28 September 2015
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Power Delivery
- Vol. 31 (4) , 1864-1872
Field Verification of Secondary Arc Extinction Logic
Single-phase trip and high-speed reclose (SPTR) schemes applied on extra-high-voltage (EHV) lines offer significant benefits over three-phase schemes as they help maintain synchronism and stability in sparse transmission networks. However, a secondary arc may persist and prevent timely recovery of the air insulation. In this situation, high-speed reclosing will attempt to re-energize the still-faulted line, adding stress to the system instead of benefiting the system from the SPTR scheme. Using staged fault and fault disturbance data recorded from several 500 kV lines, this paper presents validation of an enhanced hybrid scheme incorporating secondary arc extinction detection logic designed to avoid high-speed reclosing onto faults while also allowing single-phase reclose in cases where it would be successful. The new logic is now being applied to several 500 kV lines in BC Hydro to improve transmission system reliability.
- 1 November 2013
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-6
Interconnecting non-utility generators to BC Hydro's transmission network
The cost of interconnection is an important factor in Non Utility Generator (NUG) overall project costs. This cost has to be minimized without compromising the safety or reliability of the transmission system. The lowest cost interconnection is a transmission line tap. However, low cost taps may negatively impact transmission system performance and protection system performance. The negative impacts can often be mitigated with increasing complexity (and cost) of the interconnection. This paper describes BC Hydro's experience with studying interconnection proposals, using internally developed protection criteria to minimize costs while retaining acceptable protection performance.
- 1 November 2013
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-6
Interconnecting non-utility generators to BC Hydro's transmission network
The cost of interconnection is an important factor in Non Utility Generator (NUG) overall project costs. This cost has to be minimized without compromising the safety or reliability of the transmission system. The lowest cost interconnection is a transmission line tap. However, low cost taps may negatively impact transmission system performance and protection system performance. The negative impacts can often be mitigated with increasing complexity (and cost) of the interconnection. This paper describes BC Hydro's experience with studying interconnection proposals, using internally developed protection criteria to minimize costs while retaining acceptable protection performance.
- 1 January 1991
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1336-1342 vol.2
Joint VAr controller implemented in an artificial neural network environment
Artificial neural network software has been trained to perform the joint VAr control function and demonstrated on three large synchronous condensers. Training rate depends on the nature of the training data set. It is noted that training data sets should be designed to place the majority of the data in the areas where the transfer function is the most critical.<>
- 1 January 1991
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1336-1342 vol.2
Joint VAr controller implemented in an artificial neural network environment
Artificial neural network software has been trained to perform the joint VAr control function and demonstrated on three large synchronous condensers. Training rate depends on the nature of the training data set. It is noted that training data sets should be designed to place the majority of the data in the areas where the transfer function is the most critical.<>