SMStephen McIlwaine

Stephen McIlwaine

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article

Previous Organizations / Institutes

The organizations / institutes from the scholar's other articles in the past ten years


Stephen McIlwaine has a total of 27 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    Guest editorial: Industry 4.0 and the future of infrastructure operation and maintenance

    by Saeed Talebi, Song Wu, Faris Elghaish, Stephen McIlwaine

    Industry 4.0 and the future of infrastructure operation and maintenance Infrastructure worldwide is a critical component of every nation's economy, health and safety; yet, much of it is deteriorating due to age, environmental stress and high usage demands. Traditional operation and maintenance (O&M) methods often rely on manual processes that are labour-intensive, potentially hazardous and limited by human capacity to monitor and manage infrastructure effectively (Talebi et al., 2022). At the same time, modern societies face the dual challenge of aging infrastructure and the pressing need for sustainable, smart and efficient management solutions. With the Fourth Industrial Revolution, commonly referred to as Industry 4.0, societies have a unique opportunity to transform O&M processes by integrating advanced technologies, data-driven insights and automated systems that not only improve efficiency but also extend the lifespan and resilience of these essential assets. This special issue, dedicated to exploring Industry 4.0 for infrastructure O&M, provides a unique platform for researchers to converge and expand upon emerging practices and technologies that respond to this critical need. It brings together innovative studies focused on the integration of digital technologies for O&M in infrastructure sectors such as bridges, roads, sewage and dams, ultimately laying the groundwork for transformative advancements in infrastructure resilience, efficiency and sustainability. In light of this, this special issue aims to consolidate contemporary research efforts to address key challenges within infrastructure O&M, emphasising Industry 4.0 technologies as a transformative force. This special issue comprises six insightful papers that each present a unique perspective on how Industry 4.0 technologies are being harnessed for infrastructure O&M. Staffa Junior et al. (2025) presents an innovative web platform that leverages Unmanned Aerial Systems (UAS) and artificial intelligence (AI) to enhance the safety and efficiency of building roof inspections. With a focus on automated detection of roof pathologies, the platform demonstrates the benefits of integrating drones and machine learning to replace traditional, labour-intensive inspection methods. The study highlights the role of UAS and AI in providing remote, accurate and efficient inspections, underscoring how Industry 4.0 technologies can mitigate risks and improve maintenance outcomes in the built environment. Egbelakin et al. (2025) explores the social dimensions of flood resilience. It uses text mining to analyse community and governmental perspectives on flood mitigation. By identifying key themes such as building adaptation to flooding, climate change and community preparedness, the paper highlights critical social factors often overlooked in flood management research. This study underscores the importance of incorporating communityfocused approaches in O&M strategies and provides valuable insights that can guide the integration of social dimensions within the broader framework of Industry 4.0 applications. Zakeri Afshar et al. (2025) introduces a novel approach for establishing cost-effective Public Private Partnership (PPP) models through risk assessment and Monte Carlo simulations, focusing on water and wastewater projects. By identifying high-impact risks and quantifying their financial impact, this research provides actionable insights for reducing the public sector's cost burden. The study exemplifies how simulation-based Industry 4.0 technologies can support data-driven decision-making in infrastructure finance, an area of particular relevance as global economies increasingly rely on PPPs for sustainable infrastructure development. Boateng et al. (2025) develop a socio-ecological risk management simulation using system dynamics (SD) for megaprojects, exemplified by the Edinburgh Tram Network.


  • Industry 4.0 and the circular economy: using design-stage digital technology to reduce construction waste

    by Anuja Talla, Stephen McIlwaine

    Purpose: This study examines how applying innovative I4.0 technologies at the design stage can help reduce construction waste and improve the recovery, reuse, and recycling of construction materials.Design/methodology/approach: The study adopts a three-stage sequential mixed methods approach, involving a thorough review of current literature, interviews with six experts in digital construction, and a survey of 75 experienced industry practitioners.Findings: The study identifies and discusses how ten specific digital technologies can improve design stage processes leading to improved circularity in construction, namely, (1) additive and robotic manufacturing; (2) artificial intelligence; (3) big data analytics; (4) blockchain technology; (5) building information modelling; (6) digital platforms; (7) digital twins; (8) geographic information systems; (9) material passports and databases; and (10) Internet of things. It demonstrates that by using these technologies to support circular design concepts within the sector, material recycling rates can be improved and unnecessary construction waste reduced.Practical implications: This research provides researchers and practitioners with improved understanding of the potential of digital technology to recycle construction waste at the design stage, and may be used to create an implementation roadmap to assist designers in finding tools and identifying them.Originality/value: Little consideration has been given to how digital technology can support design stage measures to reduce construction waste. This study fills a gap in knowledge of a fast-moving topic.


  • Open Access

    Integrated Project Delivery with BIM: A Methodical Approach Within the UK Consulting Sector

    by Prasenjit Dalui, Faris Elghaish, Tara Brooks, Stephen McIlwaine

    The aim of this study is to identify the advantages and limitations in the implementation of the Building Information Modelling (BIM) and Integrated Project Delivery (IPD) in the UK consulting sector. A literature review critically analyses the existing literature, (including online articles and publications owing to the current and fast-moving nature of the topic in question). Next, a qualitative research approach was employed through interviews which targeted BIM professionals across the AEC sector in the UK. Barriers to BIM were found to include lack of enthusiasm for potential opportunities for BIM and IPD. Cultural factors which act against BIM and IPD implementation include, willingness to adopt BIM environment, software cost, high-end user maintenance cost. Furthermore, a need was determined for UK government support and encouragement for the use of BIM and IPD for smaller projects. This study recommends that schools take steps to improve career advice and guidance for students in relation to construction, specifically increasing awareness of the opportunities available related to BIM and working professionals to increase awareness of and employment in BIM through training and apprentices as appropriately. Finally, the paper concludes that BIM and IPD should be more widely adopted within AEC industries in the UK to maximise benefits from both systems.


  • Open Access

    Feasibility of implementing IPD approach for infrastructure projects in developing countries

    by Manas Khanna, Faris Faris Elghaish, Stephen McIlwaine, Tara Tara Brooks

    Alternative project delivery approaches have been proposed to overcome the inefficiencies of conventional delivery methods such as design-bid-build. Integrated Project Delivery (IPD) has recently emerged as a feasible substitute to traditional project delivery approaches. Despite widespread awareness of the benefits of IPD in integration with information and communication technology (ICT) to enhance the delivery of construction projects, IPD implementation has so far been sluggish in developing countries such as India. The feasibility of implementing IPD approach and applying its principles is investigated in this study. It assesses the maturity of delivery techniques, and the potential benefits and limitations of using IPD for infrastructure projects in developing countries, using India as a case study. This study has been carried out using an in-depth investigation of the literature in combination with a qualitative method involving interviews with ten highly experienced BIM professionals from the Indian AEC sector. The findings of this study have revealed that adopting integrated project delivery while leveraging the BIM process in conjunction with ICT has the potential to effectively deliver mega infrastructure projects in developing countries. The resistance to change, lack of experience and skills, and lack of awareness among project owners are recognized as the primary obstacles to IPD adoption. The main benefits for practice following adoption could include enhanced project delivery, more effective coordination among stakeholders, and greater transparency with cost and time savings through all stages of the project. It is recommended that the regulatory bodies establish governing standards and frameworks, amend regulations to accept IPD concepts, and upskill the workforce through training and knowledge transfer for its successful adoption. One novel aspect of this study may be recognized since most previous research has focused on limitations, benefits, and adoption frameworks for IPD whereas there has been no definitive study on the practicality of IPD combined with BIM and the use of ICT for successful infrastructure project delivery in developing countries. This study contributes to the body of knowledge by serving as an exemplary paper for future studies on the adoption of BIM and ICT approaches such as cloud computing, blockchain, IoT, and mixed realities to deliver projects with integrated project delivery. Furthermore, it provides a deeper understanding of the future of this delivery approach in developing nations.


  • Labor waste in housing construction projects: an empirical study

    by Soraya Nassri, Saeed Talebi, Faris Elghaish, Kayvan Koohestani, Stephen McIlwaine, M. Reza Hosseini, Mani Poshdar, Michail Kagioglou

    Purpose: High-level labor waste is a major challenge in construction projects. This paper aims to identify, quantify and categorize labor waste in the context of Iranian housing construction projects.Design/methodology/approach: This research uses a case study approach, with empirical data collected through direct observations and semi-structured interviews.Findings: Having triangulated the findings from the literature review and empirical studies, a list of eight types of waste was derived for the thirteen observed laborers in ten case study projects. The empirical studies allowed the labor waste identified from the literature to be verified and refined by considering it in the context of the observed activities, and led to two new types of waste being identified which were not considered in the literature. Findings indicate that nearly 62% of laborers' time is spent on non-value-adding activities. It appeared that “unnecessary movement,” “waiting” and “indirect work” make up the highest labor waste.Research limitations/implications: This research focuses only on onsite resource flows in a housing construction site. It does not include offsite flows such as material delivery to site.Originality/value: The findings have provided substantial evidence on type and amount of labor waste and provide a solid basis to stimulate construction actors to participate in reducing labor waste and improving productivity.


  • Open Access

    Developing a Parametric Cash Flow Forecasting Model for Complex Infrastructure Projects: A Comparative Study

    by Mahir Msawil, Faris Elghaish, Krisanthi Seneviratne, Stephen McIlwaine

    Forecasting the cash flow for infrastructure projects has not received much attention in the existing models. Moreover, disregarding the cost flow behaviour and proposing models that entail a relatively high dimensionality of inputs have been the main drawbacks of the existing models. This study proposes a heuristic cash flow forecasting (CFF) model for infrastructure projects, and it explores the underlying behaviour of the cost flow. The proposed model was validated by adopting a case study approach,the actual cost flow datasets were mined from a verified data system. The results invalidated the employment of a dominant heuristic rule with regard to a cost-flow-time relationship in infrastructure projects. On the other hand, a mathematical parameter-based comparison between the trends analysed from previous studies revealed that the cost flows of infrastructure projects procured through a design-bid-build (D-B-B) route behaved in a similar manner to building projects procured through a construction management route. This research contributes to the body of knowledge providing a method to enable infrastructure contractors to accurately forecast the required working capital through adding a new dimension for project classification by coining the term “the quaternary flow percentage”. In addition, this study indicates the importance of identifying the impact of root risks on the individual cost flow components rather than on the aggregated cost flow, which is a recommendation for future research.


  • Drivers and challenges to water tariff reform in Saudi Arabia

    by Stephen J. McIlwaine, Omar K. M. Ouda

    In 2015, increases in the domestic water tariff in Saudi Arabia were met with significant opposition. Although the increases were needed to address the technical and financial sustainability of the service in the context of extreme scarcity and high costs, insufficient effort was made to explain the changes and prepare the public. This paper examines the trade-offs surrounding the design of a domestic water tariff, based on economic theory and global experience, and sets out the competing factors Saudi Arabia should consider when designing a new tariff structure to provide long-term public acceptability while ensuring the service remains sustainable.


  • Related‐Party Disclosures

    by Asif Chaudhry, Craig Fuller, Danie Coetsee, Edward Rands, Erwin Bakker, Minette van der Merwe, Paul Yeung, Santosh Varughese, Stephen McIlwaine, Tv Balasubramanian

  • Statements of Profit or Loss and Other Comprehensive Income, and Changes In Equity

    by Asif Chaudhry, Craig Fuller, Danie Coetsee, Edward Rands, Erwin Bakker, Minette van der Merwe, Paul Yeung, Santosh Varughese, Stephen McIlwaine, Tv Balasubramanian