Francesco Sanniti
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Francesco Sanniti has a total of 35 co-authors. Here are the top co-authors by number of shared publications:
- Roberto Benato
Department of Industrial Engineering, University of Padova, Via Gradenigo 6/A, 35131 Padova, Italy
14 shared publications - Sebastian Dambone Sessa
Department of Industrial Engineering, University of Padova, Padua, Italy
10 shared publications - Cosimo Pisani
Terna S.p.A., 00156 Rome, Italy
3 shared publications - Michele Poli
TERNA, Roma Italy
3 shared publications - Angelo L’abbate
RSE S.p.A., Via Rubattino 54, 20134 Milan, Italy
2 shared publications - Federico Milano
University College Dublin
2 shared publications
Latest Publications
- Open Access
Monitoring and Management Strategies of Renewable Energy Communities for Improving Energy Sharing and Flexibility
Renewable energy communities are emerging actors in the European energy transition, enabling higher penetration of distributed energy resources while promoting local energy sharing and demand-side flexibility. This paper proposes an integrated framework for the monitoring and optimal management of renewable energy communities aimed at maximizing the shared energy and enabling the provision of flexibility services. In particular, the paper examines the role and key features of real-time monitoring and control, which are required to be designed to enable the renewable energy community to achieve its objectives. The proposed methodology is based on a multi-period optimization model accounting for users’ energy exchanges, renewable generation, battery energy storage systems operation and degradation, renewable energy community incentive mechanisms, and flexibility remuneration schemes according to the current Italian regulatory framework. In parallel, different monitoring architectures are comparatively analyzed to assess the impact on the real implementation of renewable energy communities for different monitoring granularities. The results highlight how advanced monitoring infrastructures significantly improve the capability of renewable energy communities to implement real-time energy management strategies and flexibility-oriented services. In particular, centralized coordination of storage systems within the renewable energy community enables higher shared energy and more effective flexibility provision compared with decentralized user-driven operation. The proposed framework provides useful guidelines for the design of future renewable energy community management platforms and monitoring architectures supporting the evolution of local flexibility markets.
Open AccessMonitoring and Management Strategies of Renewable Energy Communities for Improving Energy Sharing and Flexibility
Renewable energy communities are emerging actors in the European energy transition, enabling higher penetration of distributed energy resources while promoting local energy sharing and demand-side flexibility. This paper proposes an integrated framework for the monitoring and optimal management of renewable energy communities aimed at maximizing the shared energy and enabling the provision of flexibility services. In particular, the paper examines the role and key features of real-time monitoring and control, which are required to be designed to enable the renewable energy community to achieve its objectives. The proposed methodology is based on a multi-period optimization model accounting for users’ energy exchanges, renewable generation, battery energy storage systems operation and degradation, renewable energy community incentive mechanisms, and flexibility remuneration schemes according to the current Italian regulatory framework. In parallel, different monitoring architectures are comparatively analyzed to assess the impact on the real implementation of renewable energy communities for different monitoring granularities. The results highlight how advanced monitoring infrastructures significantly improve the capability of renewable energy communities to implement real-time energy management strategies and flexibility-oriented services. In particular, centralized coordination of storage systems within the renewable energy community enables higher shared energy and more effective flexibility provision compared with decentralized user-driven operation. The proposed framework provides useful guidelines for the design of future renewable energy community management platforms and monitoring architectures supporting the evolution of local flexibility markets.
- Open Access
A Novel Simultaneous Fault Computation Algorithm for Any Asymmetric and Multiconductor Power System: SFPD
The paper presents SFPD, the new open algorithm developed by the University of Padova (PD in the acronym) for computing the steady-state regime due to any number of simultaneous faults (SF at the beginning of the acronym) both short circuits and open conductors. The algorithm does not have simplified hypotheses, since it benefits from the pre-fault regime based on PFPD_MCA (power flow by University of Padova with multiconductor cell analysis), a multiconductor power flow (developed and published by the first author) which takes into account both the active conductors (i.e., the phases subjected to the impressed voltages) and the passive conductors (i.e., the interfered metallic conductors, namely earth wires of overhead lines, metallic screens and armors of land and submarine cables, enclosures of gas insulated lines, return and earth wires of 2 × 25 kV AC high-speed railway supply system, etc.). Different types of faults are considered, and where they occur (also along the lines), by means of a suitable admittance matrix in phase frame of reference and embedded inside the overall network bus admittance matrix. Some comparisons with simplified approaches are presented in order to demonstrate the power of the method. Eventually, application to the real Italian network is comprehensively shown.
Open AccessA Novel Simultaneous Fault Computation Algorithm for Any Asymmetric and Multiconductor Power System: SFPD
The paper presents SFPD, the new open algorithm developed by the University of Padova (PD in the acronym) for computing the steady-state regime due to any number of simultaneous faults (SF at the beginning of the acronym) both short circuits and open conductors. The algorithm does not have simplified hypotheses, since it benefits from the pre-fault regime based on PFPD_MCA (power flow by University of Padova with multiconductor cell analysis), a multiconductor power flow (developed and published by the first author) which takes into account both the active conductors (i.e., the phases subjected to the impressed voltages) and the passive conductors (i.e., the interfered metallic conductors, namely earth wires of overhead lines, metallic screens and armors of land and submarine cables, enclosures of gas insulated lines, return and earth wires of 2 × 25 kV AC high-speed railway supply system, etc.). Different types of faults are considered, and where they occur (also along the lines), by means of a suitable admittance matrix in phase frame of reference and embedded inside the overall network bus admittance matrix. Some comparisons with simplified approaches are presented in order to demonstrate the power of the method. Eventually, application to the real Italian network is comprehensively shown.
- Open Access
- 4 March 2026
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Access
- Vol. 14, 37164-37177
Experimental Validation of a Novel Travelling Wave-Based Fault Location Method for Unearthed Overhead Line Networks
This paper presents the improvement of an original fault location approach previously presented by the authors to the scientific community. The method is thought to identify the fault position in unearthed operated networks by exploiting a single measurement terminal and it is based on the travelling wave theory. The novelty introduced in this work is the experimental demonstration that the combination of the Continuous Wavelet Transform and the Discrete Fourier Transform applied to the earth mode component of the fault current is able to significantly increase the precision in the fault location. In order to verify the accuracy of the method, phase-to-ground short circuits have been triggered on a real overhead line in different positions, since the on-field application of travelling wave-based fault location methods represents the most reliable bench test. The proposed algorithm proved to be reliable and accurate in the estimation of the fault distance despite its formal simplicity. The experimental results demonstrate the accuracy and robustness of the method for faults occurring before a line branch at a sampling rate of 1 MHz. In addition, the behavior of the proposed approach for faults occurring after a branch is investigated, highlighting the role of the sampling frequency in resolving closely spaced reflections. Simulation results show that higher sampling rates are required in branched configurations, thereby defining the current practical conditions for the applicability of the method.
- 4 March 2026
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Access
- Vol. 14, 37164-37177
Open AccessExperimental Validation of a Novel Travelling Wave-Based Fault Location Method for Unearthed Overhead Line Networks
This paper presents the improvement of an original fault location approach previously presented by the authors to the scientific community. The method is thought to identify the fault position in unearthed operated networks by exploiting a single measurement terminal and it is based on the travelling wave theory. The novelty introduced in this work is the experimental demonstration that the combination of the Continuous Wavelet Transform and the Discrete Fourier Transform applied to the earth mode component of the fault current is able to significantly increase the precision in the fault location. In order to verify the accuracy of the method, phase-to-ground short circuits have been triggered on a real overhead line in different positions, since the on-field application of travelling wave-based fault location methods represents the most reliable bench test. The proposed algorithm proved to be reliable and accurate in the estimation of the fault distance despite its formal simplicity. The experimental results demonstrate the accuracy and robustness of the method for faults occurring before a line branch at a sampling rate of 1 MHz. In addition, the behavior of the proposed approach for faults occurring after a branch is investigated, highlighting the role of the sampling frequency in resolving closely spaced reflections. Simulation results show that higher sampling rates are required in branched configurations, thereby defining the current practical conditions for the applicability of the method.
- 10 October 2025
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Industry Applications
- Vol. 62 (3) , 5140-5148
Experimental Validation of Multiconductor Cell Analysis by Overhead Line Field Measurements
Multiconductor Cell Analysis (MCA) is a matrix algorithm computing the electrical steady-state regime of any asymmetrical multiconductor system. This paper presents two experimental validations of MCA, which are carried out by two measurement campaigns performed in two different areas of Italy: on the Extra High Voltage (EHV) double-circuit OverHead Line (OHL) Dolo-Venezia Nord (18 km long) and on Suvereto-Montalto di Castro (120 km long) EHV OHL. By considering the double-circuit configuration of these lines, it has been assessed the impact of one inducing circuit, kept in service, on the other circuit, kept out of service, for the evaluation of induced voltages and currents. The induced circuit experiences induced voltage magnitudes ranging from about 4 kV to 30 kV when it is open at both ends, whereas the induced voltages are negligible but the current magnitudes ranging from 10 A to 28 A when it is grounded at both ends. The maximum mismatch between measurements and MCA results is 8,6% of the induced voltage magnitude of the phase closest to the earth. This mismatch is theoretically explainable by considering that this phase is the more subjected to the presence of unknown proximity objects along the route which could alter the electric field. One more time, comparisons between computations and measurements confirm the very good agreement between MCA and the physical behavior of asymmetric multiconductor systems.
- 10 October 2025
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Industry Applications
- Vol. 62 (3) , 5140-5148
Experimental Validation of Multiconductor Cell Analysis by Overhead Line Field Measurements
Multiconductor Cell Analysis (MCA) is a matrix algorithm computing the electrical steady-state regime of any asymmetrical multiconductor system. This paper presents two experimental validations of MCA, which are carried out by two measurement campaigns performed in two different areas of Italy: on the Extra High Voltage (EHV) double-circuit OverHead Line (OHL) Dolo-Venezia Nord (18 km long) and on Suvereto-Montalto di Castro (120 km long) EHV OHL. By considering the double-circuit configuration of these lines, it has been assessed the impact of one inducing circuit, kept in service, on the other circuit, kept out of service, for the evaluation of induced voltages and currents. The induced circuit experiences induced voltage magnitudes ranging from about 4 kV to 30 kV when it is open at both ends, whereas the induced voltages are negligible but the current magnitudes ranging from 10 A to 28 A when it is grounded at both ends. The maximum mismatch between measurements and MCA results is 8,6% of the induced voltage magnitude of the phase closest to the earth. This mismatch is theoretically explainable by considering that this phase is the more subjected to the presence of unknown proximity objects along the route which could alter the electric field. One more time, comparisons between computations and measurements confirm the very good agreement between MCA and the physical behavior of asymmetric multiconductor systems.
- Open Access
- 14 February 2025
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Access
- Vol. 13, 31936-31948
DTS: A New Deterministic Approach to Derive the Optimal Synchronization Conditions of a Synchronous Condenser
This paper presents an original deterministic approach to improve the success rate of the synchronization process of a synchronous condenser. In fact, the start-up process of a synchronous condenser cannot rely on the presence of a supply system to regulate its speed during the synchronization process, as happens with traditional synchronous generators. A static frequency converter is used to start the machine, but it should be disconnected before the grid synchronization to avoid damages, making the process uncontrollable. The proposed method aims to analytically determine the optimal frequency and phase angle to disconnect the converter in order to ensure synchronization with the grid within proper thresholds. The accuracy of the method is confirmed by a comparison with on-field recording of real synchronous condenser start-up processes. This procedure enables significantly reducing the frequency threshold for the synchronization so to limit the thermal and mechanical stresses of the machine and to increase its lifecycle.
- 14 February 2025
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Access
- Vol. 13, 31936-31948
Open AccessDTS: A New Deterministic Approach to Derive the Optimal Synchronization Conditions of a Synchronous Condenser
This paper presents an original deterministic approach to improve the success rate of the synchronization process of a synchronous condenser. In fact, the start-up process of a synchronous condenser cannot rely on the presence of a supply system to regulate its speed during the synchronization process, as happens with traditional synchronous generators. A static frequency converter is used to start the machine, but it should be disconnected before the grid synchronization to avoid damages, making the process uncontrollable. The proposed method aims to analytically determine the optimal frequency and phase angle to disconnect the converter in order to ensure synchronization with the grid within proper thresholds. The accuracy of the method is confirmed by a comparison with on-field recording of real synchronous condenser start-up processes. This procedure enables significantly reducing the frequency threshold for the synchronization so to limit the thermal and mechanical stresses of the machine and to increase its lifecycle.
- Open Access
- 30 October 2024
- Published by MDPI AG in Electronics
- Vol. 13 (21) , 4262
Comparison of Advanced Flexible Alternating Current Transmission System (FACTS) Devices with Conventional Technologies for Power System Stability Enhancement: An Updated Review
The continuously growing penetration of renewable energy sources (RESs) in electrical networks provides increasing challenges and critical situations to be managed by worldwide system operators. Due to their features and variability, non-programmable RES power plants, whose increasing penetration reduces the inertia level of the power system, may determine the instability effects on the grids, especially from the frequency and voltage regulation standpoints. The present study focuses on the support that advanced FACTS (Flexible Alternating Current Transmission System) devices, such as STATCOMs (Static Synchronous Compensators), can provide to the power system operation in terms of system inertia improvement, frequency stability, and voltage stability. In particular, a review of the scientific literature and practice is performed, with the aim of benchmarking the ongoing evolution of these technologies, also comparing them with different options based on synchronous condensers, synchronous condensers integrated with flywheels, and STATCOMs with supercapacitors. The outcome of the analysis consists of an updated evaluation of the state-of-the-art technological development in the field and of a comparison between different FACTSs with the purpose of identifying the most suitable solutions for different practical situations, also taking account of synergies across various options. This study includes an updated overview regarding the status of STATCOM installation in the Italian power grid.
- 30 October 2024
- Published by MDPI AG in Electronics
- Vol. 13 (21) , 4262
Open AccessComparison of Advanced Flexible Alternating Current Transmission System (FACTS) Devices with Conventional Technologies for Power System Stability Enhancement: An Updated Review
The continuously growing penetration of renewable energy sources (RESs) in electrical networks provides increasing challenges and critical situations to be managed by worldwide system operators. Due to their features and variability, non-programmable RES power plants, whose increasing penetration reduces the inertia level of the power system, may determine the instability effects on the grids, especially from the frequency and voltage regulation standpoints. The present study focuses on the support that advanced FACTS (Flexible Alternating Current Transmission System) devices, such as STATCOMs (Static Synchronous Compensators), can provide to the power system operation in terms of system inertia improvement, frequency stability, and voltage stability. In particular, a review of the scientific literature and practice is performed, with the aim of benchmarking the ongoing evolution of these technologies, also comparing them with different options based on synchronous condensers, synchronous condensers integrated with flywheels, and STATCOMs with supercapacitors. The outcome of the analysis consists of an updated evaluation of the state-of-the-art technological development in the field and of a comparison between different FACTSs with the purpose of identifying the most suitable solutions for different practical situations, also taking account of synergies across various options. This study includes an updated overview regarding the status of STATCOM installation in the Italian power grid.
- Open Access
- 24 August 2024
- Published by MDPI AG in Applied Sciences
- Vol. 14 (17) , 7488
Techno-Economic Assessment of Coaxial HTS HVAC Transmission Cables with Critical Current Grading between Phases Using the OSCaR Tool
In recent years, the scientific and industrial interest regarding alternative technologies for transmission cables has increased. These conductors should efficiently transmit significant amounts of power between grid nodes, which are expected to be particularly congested due to the projected global increase in electricity production. Superconducting cables are considered a promising solution in this context, offering the potential to transmit large amounts of energy with minimal losses and compact dimensions, thereby potentially benefiting the environment. To evaluate the feasibility of integrating superconducting cables into existing grids, techno-economic approaches should be adopted. Such techniques enable the conceptual design of a specific cable structure, allowing users to explore a wide range of operating parameters to derive optimal designs. This paper reports a comprehensive techno-economic analysis of High Voltage Alternating Current (HVAC) cables realized with High-Temperature Superconducting (HTS) tapes, with the aim to transmit extremely high-power level. The optimal coaxial design is selected using Optimization Tool for Superconducting Cable Research (OSCaR) by implementing a graded approach to the critical current of the HTS tapes used for the different phases. This optimization aims to achieve the most effective balance between the cost of the coated conductors and their electrical properties. The whole set of model equations, the user-defined parameters, and the applied constraints are detailed. The OSCaR tool is then applied to assess the impact on the optimized design of the cable system and the corresponding cost indexes of several crucial parameters, such as the maximum transmitted power, the voltage level, and the line length.
- 24 August 2024
- Published by MDPI AG in Applied Sciences
- Vol. 14 (17) , 7488
Open AccessTechno-Economic Assessment of Coaxial HTS HVAC Transmission Cables with Critical Current Grading between Phases Using the OSCaR Tool
In recent years, the scientific and industrial interest regarding alternative technologies for transmission cables has increased. These conductors should efficiently transmit significant amounts of power between grid nodes, which are expected to be particularly congested due to the projected global increase in electricity production. Superconducting cables are considered a promising solution in this context, offering the potential to transmit large amounts of energy with minimal losses and compact dimensions, thereby potentially benefiting the environment. To evaluate the feasibility of integrating superconducting cables into existing grids, techno-economic approaches should be adopted. Such techniques enable the conceptual design of a specific cable structure, allowing users to explore a wide range of operating parameters to derive optimal designs. This paper reports a comprehensive techno-economic analysis of High Voltage Alternating Current (HVAC) cables realized with High-Temperature Superconducting (HTS) tapes, with the aim to transmit extremely high-power level. The optimal coaxial design is selected using Optimization Tool for Superconducting Cable Research (OSCaR) by implementing a graded approach to the critical current of the HTS tapes used for the different phases. This optimization aims to achieve the most effective balance between the cost of the coated conductors and their electrical properties. The whole set of model equations, the user-defined parameters, and the applied constraints are detailed. The OSCaR tool is then applied to assess the impact on the optimized design of the cable system and the corresponding cost indexes of several crucial parameters, such as the maximum transmitted power, the voltage level, and the line length.
- Open Access
Analysis and Explanation of Resonant Phenomena Involving EHV Transformers during Power System Restoration Tests
This paper deals with the simulation and the experimental confirmation of electromagnetic events that could interfere with the successful formation of the restoration path during the power system restoration procedure. The studied phenomena are more relevant for bulk power systems characterized by a low short circuit power as the restoration backbone. In particular, two case studies have been simulated and analyzed: one related to a transformer energization during the formation of the restoration path, and the other one occurred after the de-energization of some transmission lines and one autotransformer belonging to the restoration path. From the simulation results, it emerged that such events are related to the resonant effects between the supplying transformer and the restored network. Such resonances could have negative effects on the restoration if they are not effectively managed. In order to evaluate the impact of such phenomena in real networks, the measurement recordings of on-field tests were compared with the simulation results. It is worth noting that the performed analyses require the knowledge of several parameters that were not always available in practice. Hence, the exact magnitude of the described resonant phenomena was not easy to foresee for the restoration of real networks. The performed comparison confirms the preliminary simulation results and highlights that detailed electromagnetic models are particularly important to support the power system restoration management, in particular the planning of recovery procedures.
Open AccessAnalysis and Explanation of Resonant Phenomena Involving EHV Transformers during Power System Restoration Tests
This paper deals with the simulation and the experimental confirmation of electromagnetic events that could interfere with the successful formation of the restoration path during the power system restoration procedure. The studied phenomena are more relevant for bulk power systems characterized by a low short circuit power as the restoration backbone. In particular, two case studies have been simulated and analyzed: one related to a transformer energization during the formation of the restoration path, and the other one occurred after the de-energization of some transmission lines and one autotransformer belonging to the restoration path. From the simulation results, it emerged that such events are related to the resonant effects between the supplying transformer and the restored network. Such resonances could have negative effects on the restoration if they are not effectively managed. In order to evaluate the impact of such phenomena in real networks, the measurement recordings of on-field tests were compared with the simulation results. It is worth noting that the performed analyses require the knowledge of several parameters that were not always available in practice. Hence, the exact magnitude of the described resonant phenomena was not easy to foresee for the restoration of real networks. The performed comparison confirms the preliminary simulation results and highlights that detailed electromagnetic models are particularly important to support the power system restoration management, in particular the planning of recovery procedures.
- Open Access
- 23 August 2022
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Access
- Vol. 10, 89861-89875
A Novel Dynamic Load Modeling for Power Systems Restoration: An Experimental Validation on Active Distribution Networks
In this paper, a novel approach to assess the power demand of distribution networks during a restoration process following an outage is presented. The possibility of correctly estimating such power demand represents a very important support in the choice and management of reliable restoration paths which significantly contributes to increase the resilience of the power system. In fact, due to the ever-growing penetration of renewable energy sources in the worldwide networks, electrical systems are often pushed to operate closer to their design limits and so, in particular conditions, black outs can be more frequent compared to the past. In this context, the aim of this work is to develop a general expression which can consider and represent all the key elements which affect the active and reactive power demand of distribution grids during the restoration process. The proposed method considers also the relationship between distributed generation and frequency behaviour in the power demand estimation. This aspect is generally neglected in literature although it has a significative impact. The effectiveness of the present approach is experimentally demonstrated on field. More specifically, the developed tool is applied to estimate the power demand of two real distribution networks and the tool results are compared with on-field recordings. This comparison demonstrates that the proposed approach represents a promising tool which, together with the restoration tests, could be an important ally in the design and management of the restoration plan of electrical networks.
- 23 August 2022
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Access
- Vol. 10, 89861-89875
Open AccessA Novel Dynamic Load Modeling for Power Systems Restoration: An Experimental Validation on Active Distribution Networks
In this paper, a novel approach to assess the power demand of distribution networks during a restoration process following an outage is presented. The possibility of correctly estimating such power demand represents a very important support in the choice and management of reliable restoration paths which significantly contributes to increase the resilience of the power system. In fact, due to the ever-growing penetration of renewable energy sources in the worldwide networks, electrical systems are often pushed to operate closer to their design limits and so, in particular conditions, black outs can be more frequent compared to the past. In this context, the aim of this work is to develop a general expression which can consider and represent all the key elements which affect the active and reactive power demand of distribution grids during the restoration process. The proposed method considers also the relationship between distributed generation and frequency behaviour in the power demand estimation. This aspect is generally neglected in literature although it has a significative impact. The effectiveness of the present approach is experimentally demonstrated on field. More specifically, the developed tool is applied to estimate the power demand of two real distribution networks and the tool results are compared with on-field recordings. This comparison demonstrates that the proposed approach represents a promising tool which, together with the restoration tests, could be an important ally in the design and management of the restoration plan of electrical networks.