AMAshwin Mahalingam

Ashwin Mahalingam

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article

Previous Organizations / Institutes

The organizations / institutes from the scholar's other articles in the past ten years


Ashwin Mahalingam has a total of 33 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    Factors influencing the post-award governance of PPP projects: A proposed framework

    by Venkata Santosh Kumar Delhi, Ashwin Mahalingam

    Managing the post-award phase of a PPP project is critical with respect to realizing the project’s intended benefits to society at large. The impact of institutional contexts as well as strategic action by project organizations on post-award project performance have often been studied individually. However, a comprehensive framework that combines these categories, identifies specific factors within each category, as well as outcomes relevant to the post-award phase of PPP projects is missing. This study attempts to develop such a framework through content analysis of 354 peer-reviewed journal articles. The developed framework was then refined and validated using a three round personal interview based Delphi process. In doing so, the study identifies 19 critical dimensions pertaining to institutional environments and project characteristics, and 13 different strategic mechanisms that can impact outcomes in the post-award phase of PPP projects. Further, 7 outcome dimensions - financial sustainability, adaptability, legitimacy, the extent of restructuring, sustained performance, conformance to budget and conformance to schedule - are identified and conceptualized as a seven-dimensional vector that can be taken together to assess post-award project performance. The paper concludes by discussing ways by which this framework can be used to assess and predict the outcomes of PPPs post award, and attempts to contribute to our understanding of how PPPs can be successfully designed for ease of governance across their lifecycle.


  • Making sense of 'new age data sets': researching from afar

    by Johan Ninan, Mathangi Krishnamurthy, Ashwin Mahalingam

    Research on construction has long mixed questionnaires, interviews, and observations among other forms of data capture. In contrast to questionnaires that unearth ‘what researchers think practitioners do’, and interviews that uncover ‘what practitioners think they do’, observations reveal ‘what practitioners actually do’. In contrast to traditional in-situ observations of practices, digital data represent a ‘new age data set’ that allows us to observe a social setting while suffering lesser participant or researcher biases as compared to other data sources. At the same time, these data are retrospective, longitudinal, and can be collected without any obstructions. These data sets include social media, online news articles, emails, and other digital platforms. We discuss how these data sets contribute to our understanding of the built environment. We thus highlight that, in the modern era, these ‘new age data sets’ comprise a new ‘ore’ which is currently not extracted or mined, and suggest some ways to approach them.

  • Ray Levitt: professor, practitioner and pathfinder

    by Amy Javernick-Will, Ashwin Mahalingam, John E. Taylor

    (2020). Ray Levitt: professor, practitioner and pathfinder. Construction Management and Economics: Vol. 38, Festschrift Issue in tribute of Ray Levitt, pp. 305-307.


  • Knowledge coordination in transnational engineering projects:a practice-based study

    by Shobha Ramalingam, Ashwin Mahalingam

    Several multinational engineering firms offshore the delivery of engineering design or structural detail drawings to their globally distributed delivery centres. Studies have reported knowledge-sharing challenges when such work is co-ordinated across boundaries. This study takes a practice-based approach to explore knowledge-coordinating challenges across two multinational engineering firms that offshore projects to their global delivery centres in India. Data was collected from six infrastructure projects in the two delivery centres through direct observations augmented with real-time interviews and reviews of e-mails and project documents. This data was analysed qualitatively using ethnographic-coding techniques. Empirical findings identified a set of eight coordinating practices, many of which were emergent, which the teams creatively recombined and enacted as co-ordinating mechanisms that spanned organisational boundaries. Seven practices served to transfer knowledge and one practice transformed knowledge across onshore and offshore units. The study contributes to our understanding of co-ordinating by identifying emergent and informal coordinating practices in offshored construction projects and provides insights to practitioners on the boundary spanning capabilities of these practices.


  • Simulation Exercise for Collaborative Planning System / Last Planner System (COLPLASSE)

    by N Raghavan, Koshy Varghese, Ashwin Mahalingam, Venkata S.K. Delhi


  • CyberGRID: A Virtual Workspace for Architecture, Engineering, and Construction

    by John E. Taylor, Pauli Alin, Anne Anderson, Semra Çomu, Carrie Sturts Dossick, Timo Hartmann, Josh Iorio, Ashwin Mahalingam, Neda Mohammadi

    This chapter describes the CyberGRID (Cyber-Enabled Global Research Infrastructure for Design), a virtual workspace that supports geographically distributed architecture, engineering, and construction (AEC) work coordination and execution. The CyberGRID facilitates learning, communication, and collaboration toward integrated design and delivery of AEC projects in a virtual environment and supports iterative engineering and design processes. For data collection and research purposes, the CyberGRID server can automatically capture text, voice, and video recording data whenever clients use the server. The CyberGRID is developed using the Unity3D platform. Through Unity3D, industry-standard building information modeling (BIM) models can be imported into the CyberGRID. Virtual team members can then interact with those models through their avatars, i.e., their human representations in the virtual space. The chapter illustrates a model for this process of interaction with and collaboration on BIM model development.

  • Developing a clients’ charter and construction project KPIs to direct and drive industry improvements

    by Mohan Kumaraswamy, Gangadhar Mahesh, Ashwin Mahalingam, Santhosh Loganathan, Satyanarayana N. Kalidindi

    Purpose: The purpose of this paper is to present a case, with live examples from a construction industry development initiative in India, for developing a proactive construction clients charter; and a core set of key performance indicators (KPIs), as basic tools for facilitating the expectations of this special issue in “securing clients’ organisational objectives and project aspirations throughout construction project lifecycles” apart from empowering construction industry improvements in general. Design/methodology/approach: Having identified 19 critical issues in the Indian construction industry at two construction clients-academia roundtables, two of the “action teams” formed to address specific issue sets, separately developed a relevant construction clients charter and useful KPIs, respectively, through a combination of literature reviews and brainstorming conference calls, along with iterative drafts of, and feedback on interim outputs. Validation of “working papers” presented at a “Consolidation Roundtable” of construction clients and their consultants, elicited further suggestions for fine tuning of final outputs. Findings: The charter was formulated in structured steps, including identifying “priorities” under four categories: overall, expectations from supply chains, by supply chains and by end users. The six sub-heads of the charter are on procurement, design, innovation and technology, project execution, human resource development and worker welfare, and quality, safety and sustainability. The “suggested KPIs” for building clients in India enable organisations to choose: from three different groups (i.e. design phase, construction phase, or business outcomes), and at three different levels (i.e. project/organisation level, benchmarking club level, or industry level). Originality/value: There is no known overarching Construction Clients’ Charter at present. Some project KPI sets are available elsewhere. However, those developed in India, while focusing on project performance, also connect to organisational performance and business outcomes. Furthermore, KPIs are provided to separately probe client, consultant and contractor performance. Significantly, the charter and KPIs are outcomes from an industry-led self-improvement initiative launched with building construction clients at the forefront, rather than a top-down imposition from government. Furthermore, while prioritising client aspirations, they also address common supply chain and end-user concerns, which may also be interpreted as a longer-term win-win-win client’s aspiration.


  • Open Access

    Initial Euphoria to Sustained Change - Mainstreaming Lean Culture

    by Venkata S. K. Delhi, Raghavan N, Ashwin Mahalingam, Koshy Varghese

    In line with the trend of spread of Lean Construction concepts in the recent past, Lean construction philosophy was introduced in a large industrial project of a leading organisation about two years back. The drive by the top management, augmented by efforts of the Lean champions in the project team, helped the project team to transition from the conventional project delivery method to the Lean Construction method. The present study looks at the developments in Lean implementation in the Project over time, based on observations on such dynamics and understanding the strategies which might help to mainstream Lean philosophy introduction in other similar organisations and construction projects. A detailed case study based approach was adopted to this end. The mentoring coach closely observed the behavioural developments of the Project team over time. Data for analysis included primary observations by the mentoring coach, minutes of the various meetings of the project team under study and one-on-one interactions with various team members. The analysis gave some significant insights on how to continue the initial momentum gained towards sustained Lean implementation on construction projects and in organisations.