Ashwin Mahalingam
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Ashwin Mahalingam has a total of 33 co-authors. Here are the top co-authors by number of shared publications:
- Satyanarayana N. Kalidindi
Department of Civil Engineering, Indian Institute of Technology Madras, Chennai, India
3 shared publications - Venkata Santosh Kumar Delhi
Indian Institute of Technology Bombay
3 shared publications - Carrie Sturts Dossick
University of Washington
2 shared publications - John E. Taylor
School of Civil and Environmental Engineering, Georgia Institute of Technology, Atlanta, USA
2 shared publications - Kaushik Bhattacharjee
Texas A&M University Department of Construction Science
2 shared publications - Koshy Varghese
Indian Institute of Technology Madras
2 shared publications
Latest Publications
- Open Access
- 25 September 2024
- Published by Engineering Project Organization Society in Engineering Project Organization Journal
- Vol. 7 (2)
Factors influencing the post-award governance of PPP projects: A proposed framework
Managing the post-award phase of a PPP project is critical with respect to realizing the project’s intended benefits to society at large. The impact of institutional contexts as well as strategic action by project organizations on post-award project performance have often been studied individually. However, a comprehensive framework that combines these categories, identifies specific factors within each category, as well as outcomes relevant to the post-award phase of PPP projects is missing. This study attempts to develop such a framework through content analysis of 354 peer-reviewed journal articles. The developed framework was then refined and validated using a three round personal interview based Delphi process. In doing so, the study identifies 19 critical dimensions pertaining to institutional environments and project characteristics, and 13 different strategic mechanisms that can impact outcomes in the post-award phase of PPP projects. Further, 7 outcome dimensions - financial sustainability, adaptability, legitimacy, the extent of restructuring, sustained performance, conformance to budget and conformance to schedule - are identified and conceptualized as a seven-dimensional vector that can be taken together to assess post-award project performance. The paper concludes by discussing ways by which this framework can be used to assess and predict the outcomes of PPPs post award, and attempts to contribute to our understanding of how PPPs can be successfully designed for ease of governance across their lifecycle.
- 25 September 2024
- Published by Engineering Project Organization Society in Engineering Project Organization Journal
- Vol. 7 (2)
Open AccessFactors influencing the post-award governance of PPP projects: A proposed framework
Managing the post-award phase of a PPP project is critical with respect to realizing the project’s intended benefits to society at large. The impact of institutional contexts as well as strategic action by project organizations on post-award project performance have often been studied individually. However, a comprehensive framework that combines these categories, identifies specific factors within each category, as well as outcomes relevant to the post-award phase of PPP projects is missing. This study attempts to develop such a framework through content analysis of 354 peer-reviewed journal articles. The developed framework was then refined and validated using a three round personal interview based Delphi process. In doing so, the study identifies 19 critical dimensions pertaining to institutional environments and project characteristics, and 13 different strategic mechanisms that can impact outcomes in the post-award phase of PPP projects. Further, 7 outcome dimensions - financial sustainability, adaptability, legitimacy, the extent of restructuring, sustained performance, conformance to budget and conformance to schedule - are identified and conceptualized as a seven-dimensional vector that can be taken together to assess post-award project performance. The paper concludes by discussing ways by which this framework can be used to assess and predict the outcomes of PPPs post award, and attempts to contribute to our understanding of how PPPs can be successfully designed for ease of governance across their lifecycle.
- 29 September 2023
- Published by Elsevier in Safety Science
- Vol. 169
An analysis of safety practices for small, medium, and large construction projects: A resilience engineering perspective
- 29 September 2023
- Published by Elsevier in Safety Science
- Vol. 169
An analysis of safety practices for small, medium, and large construction projects: A resilience engineering perspective
- 14 July 2023
- Published by Edward Elgar Publishing
- p. 243-264
Making sense of 'new age data sets': researching from afar
Research on construction has long mixed questionnaires, interviews, and observations among other forms of data capture. In contrast to questionnaires that unearth ‘what researchers think practitioners do’, and interviews that uncover ‘what practitioners think they do’, observations reveal ‘what practitioners actually do’. In contrast to traditional in-situ observations of practices, digital data represent a ‘new age data set’ that allows us to observe a social setting while suffering lesser participant or researcher biases as compared to other data sources. At the same time, these data are retrospective, longitudinal, and can be collected without any obstructions. These data sets include social media, online news articles, emails, and other digital platforms. We discuss how these data sets contribute to our understanding of the built environment. We thus highlight that, in the modern era, these ‘new age data sets’ comprise a new ‘ore’ which is currently not extracted or mined, and suggest some ways to approach them.
- 14 July 2023
- Published by Edward Elgar Publishing
- p. 243-264
Making sense of 'new age data sets': researching from afar
Research on construction has long mixed questionnaires, interviews, and observations among other forms of data capture. In contrast to questionnaires that unearth ‘what researchers think practitioners do’, and interviews that uncover ‘what practitioners think they do’, observations reveal ‘what practitioners actually do’. In contrast to traditional in-situ observations of practices, digital data represent a ‘new age data set’ that allows us to observe a social setting while suffering lesser participant or researcher biases as compared to other data sources. At the same time, these data are retrospective, longitudinal, and can be collected without any obstructions. These data sets include social media, online news articles, emails, and other digital platforms. We discuss how these data sets contribute to our understanding of the built environment. We thus highlight that, in the modern era, these ‘new age data sets’ comprise a new ‘ore’ which is currently not extracted or mined, and suggest some ways to approach them.
- 10 March 2020
- Published by Taylor & Francis in Construction Management and Economics
- Vol. 38 (4) , 305-307
Ray Levitt: professor, practitioner and pathfinder
(2020). Ray Levitt: professor, practitioner and pathfinder. Construction Management and Economics: Vol. 38, Festschrift Issue in tribute of Ray Levitt, pp. 305-307.
- 10 March 2020
- Published by Taylor & Francis in Construction Management and Economics
- Vol. 38 (4) , 305-307
Ray Levitt: professor, practitioner and pathfinder
(2020). Ray Levitt: professor, practitioner and pathfinder. Construction Management and Economics: Vol. 38, Festschrift Issue in tribute of Ray Levitt, pp. 305-307.
- 31 August 2018
- Published by Taylor & Francis in Construction Management and Economics
- Vol. 36 (12) , 700-715
Knowledge coordination in transnational engineering projects:a practice-based study
Several multinational engineering firms offshore the delivery of engineering design or structural detail drawings to their globally distributed delivery centres. Studies have reported knowledge-sharing challenges when such work is co-ordinated across boundaries. This study takes a practice-based approach to explore knowledge-coordinating challenges across two multinational engineering firms that offshore projects to their global delivery centres in India. Data was collected from six infrastructure projects in the two delivery centres through direct observations augmented with real-time interviews and reviews of e-mails and project documents. This data was analysed qualitatively using ethnographic-coding techniques. Empirical findings identified a set of eight coordinating practices, many of which were emergent, which the teams creatively recombined and enacted as co-ordinating mechanisms that spanned organisational boundaries. Seven practices served to transfer knowledge and one practice transformed knowledge across onshore and offshore units. The study contributes to our understanding of co-ordinating by identifying emergent and informal coordinating practices in offshored construction projects and provides insights to practitioners on the boundary spanning capabilities of these practices.
- 31 August 2018
- Published by Taylor & Francis in Construction Management and Economics
- Vol. 36 (12) , 700-715
Knowledge coordination in transnational engineering projects:a practice-based study
Several multinational engineering firms offshore the delivery of engineering design or structural detail drawings to their globally distributed delivery centres. Studies have reported knowledge-sharing challenges when such work is co-ordinated across boundaries. This study takes a practice-based approach to explore knowledge-coordinating challenges across two multinational engineering firms that offshore projects to their global delivery centres in India. Data was collected from six infrastructure projects in the two delivery centres through direct observations augmented with real-time interviews and reviews of e-mails and project documents. This data was analysed qualitatively using ethnographic-coding techniques. Empirical findings identified a set of eight coordinating practices, many of which were emergent, which the teams creatively recombined and enacted as co-ordinating mechanisms that spanned organisational boundaries. Seven practices served to transfer knowledge and one practice transformed knowledge across onshore and offshore units. The study contributes to our understanding of co-ordinating by identifying emergent and informal coordinating practices in offshored construction projects and provides insights to practitioners on the boundary spanning capabilities of these practices.
- 18 July 2018
- Published by IGLC
- p. 1002-1012
Simulation Exercise for Collaborative Planning System / Last Planner System (COLPLASSE)
- 18 July 2018
- Published by IGLC
- p. 1002-1012
Simulation Exercise for Collaborative Planning System / Last Planner System (COLPLASSE)
- 28 February 2018
- Published by American Society of Civil Engineers (ASCE)
- p. 291-321
CyberGRID: A Virtual Workspace for Architecture, Engineering, and Construction
This chapter describes the CyberGRID (Cyber-Enabled Global Research Infrastructure for Design), a virtual workspace that supports geographically distributed architecture, engineering, and construction (AEC) work coordination and execution. The CyberGRID facilitates learning, communication, and collaboration toward integrated design and delivery of AEC projects in a virtual environment and supports iterative engineering and design processes. For data collection and research purposes, the CyberGRID server can automatically capture text, voice, and video recording data whenever clients use the server. The CyberGRID is developed using the Unity3D platform. Through Unity3D, industry-standard building information modeling (BIM) models can be imported into the CyberGRID. Virtual team members can then interact with those models through their avatars, i.e., their human representations in the virtual space. The chapter illustrates a model for this process of interaction with and collaboration on BIM model development.
- 28 February 2018
- Published by American Society of Civil Engineers (ASCE)
- p. 291-321
CyberGRID: A Virtual Workspace for Architecture, Engineering, and Construction
This chapter describes the CyberGRID (Cyber-Enabled Global Research Infrastructure for Design), a virtual workspace that supports geographically distributed architecture, engineering, and construction (AEC) work coordination and execution. The CyberGRID facilitates learning, communication, and collaboration toward integrated design and delivery of AEC projects in a virtual environment and supports iterative engineering and design processes. For data collection and research purposes, the CyberGRID server can automatically capture text, voice, and video recording data whenever clients use the server. The CyberGRID is developed using the Unity3D platform. Through Unity3D, industry-standard building information modeling (BIM) models can be imported into the CyberGRID. Virtual team members can then interact with those models through their avatars, i.e., their human representations in the virtual space. The chapter illustrates a model for this process of interaction with and collaboration on BIM model development.
- 13 July 2017
- Published by Emerald Publishing in Built Environment Project and Asset Management
- Vol. 7 (3) , 253-270
Developing a clients’ charter and construction project KPIs to direct and drive industry improvements
Purpose: The purpose of this paper is to present a case, with live examples from a construction industry development initiative in India, for developing a proactive construction clients charter; and a core set of key performance indicators (KPIs), as basic tools for facilitating the expectations of this special issue in “securing clients’ organisational objectives and project aspirations throughout construction project lifecycles” apart from empowering construction industry improvements in general. Design/methodology/approach: Having identified 19 critical issues in the Indian construction industry at two construction clients-academia roundtables, two of the “action teams” formed to address specific issue sets, separately developed a relevant construction clients charter and useful KPIs, respectively, through a combination of literature reviews and brainstorming conference calls, along with iterative drafts of, and feedback on interim outputs. Validation of “working papers” presented at a “Consolidation Roundtable” of construction clients and their consultants, elicited further suggestions for fine tuning of final outputs. Findings: The charter was formulated in structured steps, including identifying “priorities” under four categories: overall, expectations from supply chains, by supply chains and by end users. The six sub-heads of the charter are on procurement, design, innovation and technology, project execution, human resource development and worker welfare, and quality, safety and sustainability. The “suggested KPIs” for building clients in India enable organisations to choose: from three different groups (i.e. design phase, construction phase, or business outcomes), and at three different levels (i.e. project/organisation level, benchmarking club level, or industry level). Originality/value: There is no known overarching Construction Clients’ Charter at present. Some project KPI sets are available elsewhere. However, those developed in India, while focusing on project performance, also connect to organisational performance and business outcomes. Furthermore, KPIs are provided to separately probe client, consultant and contractor performance. Significantly, the charter and KPIs are outcomes from an industry-led self-improvement initiative launched with building construction clients at the forefront, rather than a top-down imposition from government. Furthermore, while prioritising client aspirations, they also address common supply chain and end-user concerns, which may also be interpreted as a longer-term win-win-win client’s aspiration.
- 13 July 2017
- Published by Emerald Publishing in Built Environment Project and Asset Management
- Vol. 7 (3) , 253-270
Developing a clients’ charter and construction project KPIs to direct and drive industry improvements
Purpose: The purpose of this paper is to present a case, with live examples from a construction industry development initiative in India, for developing a proactive construction clients charter; and a core set of key performance indicators (KPIs), as basic tools for facilitating the expectations of this special issue in “securing clients’ organisational objectives and project aspirations throughout construction project lifecycles” apart from empowering construction industry improvements in general. Design/methodology/approach: Having identified 19 critical issues in the Indian construction industry at two construction clients-academia roundtables, two of the “action teams” formed to address specific issue sets, separately developed a relevant construction clients charter and useful KPIs, respectively, through a combination of literature reviews and brainstorming conference calls, along with iterative drafts of, and feedback on interim outputs. Validation of “working papers” presented at a “Consolidation Roundtable” of construction clients and their consultants, elicited further suggestions for fine tuning of final outputs. Findings: The charter was formulated in structured steps, including identifying “priorities” under four categories: overall, expectations from supply chains, by supply chains and by end users. The six sub-heads of the charter are on procurement, design, innovation and technology, project execution, human resource development and worker welfare, and quality, safety and sustainability. The “suggested KPIs” for building clients in India enable organisations to choose: from three different groups (i.e. design phase, construction phase, or business outcomes), and at three different levels (i.e. project/organisation level, benchmarking club level, or industry level). Originality/value: There is no known overarching Construction Clients’ Charter at present. Some project KPI sets are available elsewhere. However, those developed in India, while focusing on project performance, also connect to organisational performance and business outcomes. Furthermore, KPIs are provided to separately probe client, consultant and contractor performance. Significantly, the charter and KPIs are outcomes from an industry-led self-improvement initiative launched with building construction clients at the forefront, rather than a top-down imposition from government. Furthermore, while prioritising client aspirations, they also address common supply chain and end-user concerns, which may also be interpreted as a longer-term win-win-win client’s aspiration.
- Open Access
- 9 July 2017
- Published by IGLC
- p. 267-274
Initial Euphoria to Sustained Change - Mainstreaming Lean Culture
In line with the trend of spread of Lean Construction concepts in the recent past, Lean construction philosophy was introduced in a large industrial project of a leading organisation about two years back. The drive by the top management, augmented by efforts of the Lean champions in the project team, helped the project team to transition from the conventional project delivery method to the Lean Construction method. The present study looks at the developments in Lean implementation in the Project over time, based on observations on such dynamics and understanding the strategies which might help to mainstream Lean philosophy introduction in other similar organisations and construction projects. A detailed case study based approach was adopted to this end. The mentoring coach closely observed the behavioural developments of the Project team over time. Data for analysis included primary observations by the mentoring coach, minutes of the various meetings of the project team under study and one-on-one interactions with various team members. The analysis gave some significant insights on how to continue the initial momentum gained towards sustained Lean implementation on construction projects and in organisations.
- 9 July 2017
- Published by IGLC
- p. 267-274
Open AccessInitial Euphoria to Sustained Change - Mainstreaming Lean Culture
In line with the trend of spread of Lean Construction concepts in the recent past, Lean construction philosophy was introduced in a large industrial project of a leading organisation about two years back. The drive by the top management, augmented by efforts of the Lean champions in the project team, helped the project team to transition from the conventional project delivery method to the Lean Construction method. The present study looks at the developments in Lean implementation in the Project over time, based on observations on such dynamics and understanding the strategies which might help to mainstream Lean philosophy introduction in other similar organisations and construction projects. A detailed case study based approach was adopted to this end. The mentoring coach closely observed the behavioural developments of the Project team over time. Data for analysis included primary observations by the mentoring coach, minutes of the various meetings of the project team under study and one-on-one interactions with various team members. The analysis gave some significant insights on how to continue the initial momentum gained towards sustained Lean implementation on construction projects and in organisations.