FSFajar Susilowati

Fajar Susilowati

*This is an algorithmically generated author record based on publicly available information.

Fajar Susilowati has a total of 7 co-authors. Here are the top co-authors by number of shared publications:

  • Arrizka Yanuar Adipradana

    Civil Engineering, Faculty of Engineering, Tidar University, Jalan Kapten Suparman No. 39 Potrobangsan, Magelang 56116, Central Java

    2 shared publications
  • A Y Adhipradana

    Civil Engineering, Tidar University, Magelang, Indonesia

    1 shared publication
  • Budi Temi Ariati

    Civil Engineering, Politeknik Negeri Jakarta, Jl. G. A. Siwabessy, Campus of UI Depok

    1 shared publication
  • Evi Puspitasari

    Universitas Tidar, Magelang, Indonesia

    1 shared publication
  • J A Prakoso

    Faculty of Economic, Tidar University, Magelang, Indonesia

    1 shared publication
  • Jalu Aji Prakoso

    Faculty of Economic, Tidar University, Jalan Kapten Suparman No. 39 Potrobangsan, Magelang 56116, Central Java

    1 shared publication

Latest Publications

  • Open Access

    Financing Model for Construction and Demolition Waste in Indonesia

    by Fajar Susilowati, Jalu Aji Prakoso, Arrizka Yanuar Adipradana

    Construction waste poses a significant environmental and economic challenge in Indonesia’s rapidly expanding construction sector. This research develops a financing model for managing construction waste throughout the project life cycle, emphasizing the integration of cost components and waste management strategies. Data were collected through surveys, structured interviews, and observations from 80 construction projects across Indonesia. The analysis revealed that while reinforcement, bricks, and split stone have high recycling potential, actual reuse remains limited due to poor planning and insufficient infrastructure. Seven financing components were identified: material loss, production/management, sorting, collection, transportation, recycling, and dumping. Notably, material loss accounts for the largest cost share—up to 10% of project value—while recycling and dumping costs are underfunded at 0.01%–0.5%. A cost-based model was developed to simulate waste-related expenses, ranging from 0.39% to 20.5% of overall project costs. The research also highlights the design stage as a critical leverage point for maximizing waste reduction. By aligning financial planning with life cycle stages, this research provides practical guidance for stakeholders and supports Indonesia’s transition to a circular construction economy through better budgeting, policy development, and waste strategy implementation.


  • Open Access

    Modeling of construction and demolition waste management based on the project life cycle in Indonesia

    by F Susilowati, A Y Adhipradana, J A Prakoso

    Improper management of construction and demolition waste has massively accumulated waste and has raised concerns over its impact on the environment and natural resources. The aims of this research modeled construction waste management based on the project life cycle, starting from design, procurement, storage, and implementation. The study aims to conduct a more in-depth study related to Construction and Demolition Waste (CDW) management to find the right strategy. The research method was used by identifying variables based on the review literature and compiling questionnaires for 80 construction projects in Indonesia that were randomly selected to be modeled with Partial Least Squares (PLS) tools. Based on specific criteria, existing models and indicators were evaluated against reflective outer models in explanatory research. The final model explains that construction waste has 24 indicators, namely, four at the design stage, eight at the procurement stage, four at the storage stage, and eight at the implementation stage. Based on the initial contextual analysis, the design factors are the main factor causing the waste. However, the final model explains that the construction waste contextually only relates to the implementation stage, but the design and storage stages directly affect the implementation stage. Therefore, strategies in waste management must be carried out, starting with the right design and material storage processes that are by standards to minimize waste at the time of implementation.


  • Open Access

    Community empowerment in building technical planning as an effort to improve the quality of village infrastructure

    by Fajar Susilowati, Arrizka Yanuar Adipradana, Evi Puspitasari

    Provision of village funds requires preparation starting from proper planning, monitoring and evaluation to improve the welfare and economic level of the community. Dusun Karaharjan Rt 02 Rw 03 Gunungpring Village, Magelang, Central Java, is one of the areas that received village funds. Nevertheless, some of the funds are still underutilized. Therefore, in order for these village funds to be managed independently and effectively, the community is taught various skills such as reading and understanding working drawings, breaking down the scope of work, calculating the volume of work, analyzing unit prices, and making a comprehensive budget plan for construction work. The method used in this activity is a holistic implementation approach. Through this activity, an increase in knowledge and skills regarding technical building planning is obtained so that it is expected to improve the quality of village infrastructure.


  • Open Access

    The Role of the Change Order on Time Performance in Construction Project

    by Fajar Susilowati, Budi Temi Ariati

    This research was conducted to determine how the conditions change order and time performance on a construction project. The population in this study were employees of one project in Jakarta with a sample of 30 employees. Analysis of the data used in this research is descriptive analysis. The results obtained showed that the change order is including in the not good category with a percentage value of 49.79%. While the time performance included in the category is also not good with a percentage value of 42.67%. Based on the results of calculations in the regression analysis, the results show that change order has a positive effect on increasing the time of implementation of construction project work (time performance). The most dominant change order indicator influencing time performance is the lack of information when planning a project. Based on the calculation of the Pearson Product-Moment Correlation, the change order gives a strong relationship to time performance equal to 0.556. So we can be explaining that the change order affects the time performance equal to 30.9% and the rest influenced by other variables.


  • Open Access

    Effective Performance Evaluation to Estimate Cost and Time Using Earned Value

    by F Susilowati, W M Kurniaji

    The data from Badan Pusat Statistik (BPS) Indonesia, show that the development sector in the Yogyakarta region is changing rapidly, especially with the construction of new airports in the region. That demands the effectiveness and efficiency of cost and time in every construction. It requires supervision, evaluation, and performance control in the construction process. In this effort, this research discusses more detail about the calculation of construction project performance using the earned value method. This research conducted on an integrated development project consisting of malls, hotels, and apartments in Sleman, Yogyakarta. The research data collection was carried out by direct observation and analysis of supporting project data. The data obtained were processed and analysed using the accepted value method. The results of this study indicate that at the end of the review, the Schedule Performance Index (SPI) obtained a value of 0.58. Project progress in the field shows that the project has a 41.48% delay. It can see from the initially planned project of 99.06%, but at the time of review, the realisation was only 57.22%. In terms of costs, the Cost Performance Index (CPI) is 1.25. It shows that the costs incurred during the review are still less than the existing budget plan. At the end of the review period, the estimated final project costs are obtained, both direct and indirect costs. With the tendency of project performance at the time of review, the value is still less than the project budget, while the estimated time of project completion will be longer or late at around 56.52% of the planned schedule.