Salvador Doménech Martínez
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Salvador Doménech Martínez has a total of 11 co-authors. Here are the top co-authors by number of shared publications:
- José Villar
INESC TEC - Institute for Systems and Computer Engineering,Technology and Science,Porto,Portugal
7 shared publications - Fco. Alberto Campos
Institute for Research in Technology, Technical School of Engineering, Comillas Pontifical University, C/ Santa Cruz de Marcenado 26, 28015 Madrid-Spain
5 shared publications - André Rodrigues de Oliveira1 shared publication
Cristian A. Diaz
Operation Planning Department, XM, Colombian System Operator, Calle 12 Sur No. 18-168 Bloque 2, Medellín, Colombia
1 shared publicationFco Alberto Campos
1 shared publicationFco. Alberto Campos
1 shared publication
Latest Publications
- Open Access
Co-optimizing energy and reserve interconnection capacity in coupled EU electricity markets
- 1 October 2021
- Published by Elsevier in International Journal of Electrical Power & Energy Systems
- Vol. 131, 107055
Joint energy and capacity equilibrium model for centralized and behind-the-meter distributed generation
- 1 October 2021
- Published by Elsevier in International Journal of Electrical Power & Energy Systems
- Vol. 131, 107055
Joint energy and capacity equilibrium model for centralized and behind-the-meter distributed generation
- 1 July 2020
- Published by Elsevier in Electric Power Systems Research
- Vol. 184
An equilibrium approach for modeling centralized and behind-the-meter distributed generation expansion
- 1 July 2020
- Published by Elsevier in Electric Power Systems Research
- Vol. 184
An equilibrium approach for modeling centralized and behind-the-meter distributed generation expansion
- 1 September 2019
- Published by Institute of Electrical and Electronics Engineers (IEEE)
Profitability Analysis of Spanish CCGTs under Future Scenarios of high RES and EV Penetration
Among conventional generation technologies in Spain, Combined Cycle Gas Turbines (CCGT) is the one that has experienced the largest development over the first decade of the 21st century. However, despite its promising future, multiple factors (such as the renewable generation increase, demand decline, adverse regulatory policies, etc.) have compromised their competitive position, reducing their capacity factor and undermining their financial viability. Because of those issues, electricity companies are giving up on new CCGTs investments, or even considering closing or mothballing some of their recently built plants. However, many still claim for the necessity of maintaining flexible backup technologies to cope with the variability of renewable energies, as a transition technology until energy storage or other future technologies emerge. This paper makes a profitability analysis of CCGTs in the Spanish electric power sector under different scenarios of RES penetration, carbon plants decommissioning, CO 2 emission costs and EV penetration.
- 1 September 2019
- Published by Institute of Electrical and Electronics Engineers (IEEE)
Profitability Analysis of Spanish CCGTs under Future Scenarios of high RES and EV Penetration
Among conventional generation technologies in Spain, Combined Cycle Gas Turbines (CCGT) is the one that has experienced the largest development over the first decade of the 21st century. However, despite its promising future, multiple factors (such as the renewable generation increase, demand decline, adverse regulatory policies, etc.) have compromised their competitive position, reducing their capacity factor and undermining their financial viability. Because of those issues, electricity companies are giving up on new CCGTs investments, or even considering closing or mothballing some of their recently built plants. However, many still claim for the necessity of maintaining flexible backup technologies to cope with the variability of renewable energies, as a transition technology until energy storage or other future technologies emerge. This paper makes a profitability analysis of CCGTs in the Spanish electric power sector under different scenarios of RES penetration, carbon plants decommissioning, CO 2 emission costs and EV penetration.
- 1 September 2019
- Published by Institute of Electrical and Electronics Engineers (IEEE)
Residential DER Cooperative Investments
This paper aims to model collaborative behaviours related to distributed generation investments in a residential neighbourhood, by means of Cooperative Game Theory (CGT). The main objective is to analyse the economic impact of the installation of photovoltaic solar panels and batteries, and the assessment of the potential energy savings due to the cooperation among residential households. In this regard, both the purchase of needed energy from the grid and the sale of the spare energy from the households' self-generation to the grid are considered. The comparison between cooperative and non-cooperative behaviours in the investments and energy management decisions is analysed based on the Shapley value, a cost sharing method from CGT, concluding that cooperation among prosumers to share energy in a residential energy community is in general more efficient than prosumers making individual decisions.
- 1 September 2019
- Published by Institute of Electrical and Electronics Engineers (IEEE)
Residential DER Cooperative Investments
This paper aims to model collaborative behaviours related to distributed generation investments in a residential neighbourhood, by means of Cooperative Game Theory (CGT). The main objective is to analyse the economic impact of the installation of photovoltaic solar panels and batteries, and the assessment of the potential energy savings due to the cooperation among residential households. In this regard, both the purchase of needed energy from the grid and the sale of the spare energy from the households' self-generation to the grid are considered. The comparison between cooperative and non-cooperative behaviours in the investments and energy management decisions is analysed based on the Shapley value, a cost sharing method from CGT, concluding that cooperation among prosumers to share energy in a residential energy community is in general more efficient than prosumers making individual decisions.
- 1 June 2018
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-5
Synthetizing Representative Periods for Chronological Hourly Electricity Generation Expansion Models
Capacity generation expansion problems have traditionally been represented with low time resolution models due to their high computational cost, very often using blocks of hours with similar demand. However, the current transformation of the power system with the new generation and consumption technologies, the flexibility and reserve requirements, and the expected new behavioral consumption patterns, requires more complex and detailed models with higher time resolution to provide accurate investment decisions and allow for closer analyses. In particular, these challenges require chronological hourly models with constraints linking all the years of the planning horizon, compromising in most cases the computational feasibility. This paper presents a new approach to synthetize a reduced representative time period for capacity expansion problems, for being used in detailed chronological hourly models, while keeping them computationally feasible. The representative period is synthetized by selecting, with a genetic algorithm, those real days that minimizes the distance between the duration curves of a set of relevant variables (such as demand, renewable generation, ramps, etc.) computed for the original and for the representative periods. Results show that investments decisions with the representative period are very similar to those obtained with the full planning horizon, while computational times are strongly reduced.
- 1 June 2018
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-5
Synthetizing Representative Periods for Chronological Hourly Electricity Generation Expansion Models
Capacity generation expansion problems have traditionally been represented with low time resolution models due to their high computational cost, very often using blocks of hours with similar demand. However, the current transformation of the power system with the new generation and consumption technologies, the flexibility and reserve requirements, and the expected new behavioral consumption patterns, requires more complex and detailed models with higher time resolution to provide accurate investment decisions and allow for closer analyses. In particular, these challenges require chronological hourly models with constraints linking all the years of the planning horizon, compromising in most cases the computational feasibility. This paper presents a new approach to synthetize a reduced representative time period for capacity expansion problems, for being used in detailed chronological hourly models, while keeping them computationally feasible. The representative period is synthetized by selecting, with a genetic algorithm, those real days that minimizes the distance between the duration curves of a set of relevant variables (such as demand, renewable generation, ramps, etc.) computed for the original and for the representative periods. Results show that investments decisions with the representative period are very similar to those obtained with the full planning horizon, while computational times are strongly reduced.
- 1 June 2017
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-5
Estimation of the Spanish secondary reserves requirements
The increasing penetration of Intermittent Generation (IG) is being accompanied by the revision of the needs of traditional regulation reserves, as well as the discussion of new flexibility products for system balancing. In the context of electricity generation models, it is of high relevance to adequately represent, not only the energy, but also the reserve dispatch constraints, by providing the models with the expected secondary reserve requirements (SRR), so as to output more realistic energy and reserve schedules and prices. This paper analyses the SRR published by the Spanish System Operator and uses several forecasting tools for determining its main explanatory variables. Results confirm that the SRR have remained almost constant during the years of significant IG growth (and even slightly decreasing in the most recent years), and that the best SRR estimation models found use the demand and its inter-hour variations as the main explanatory variables, but not wind productions as could be expected.
- 1 June 2017
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-5
Estimation of the Spanish secondary reserves requirements
The increasing penetration of Intermittent Generation (IG) is being accompanied by the revision of the needs of traditional regulation reserves, as well as the discussion of new flexibility products for system balancing. In the context of electricity generation models, it is of high relevance to adequately represent, not only the energy, but also the reserve dispatch constraints, by providing the models with the expected secondary reserve requirements (SRR), so as to output more realistic energy and reserve schedules and prices. This paper analyses the SRR published by the Spanish System Operator and uses several forecasting tools for determining its main explanatory variables. Results confirm that the SRR have remained almost constant during the years of significant IG growth (and even slightly decreasing in the most recent years), and that the best SRR estimation models found use the demand and its inter-hour variations as the main explanatory variables, but not wind productions as could be expected.