    Enhancing Forensic Analysis of Construction Project Delays Through Digital Interventions

    by Serife Ece Boyacioglu, David Greenwood, Kay Rogage, Andrew Parry

    Project delays remain a persistent challenge in the construction industry, having significant financial implications and contributing to disputes between project participants. Forensic Delay Analysis (FDA) has emerged as a specialised function that identifies the root causes of such delays, quantifies their duration, and assigns responsibility to the appropriate parties. While FDA is a widely practised process, it has yet to fully exploit the potential of emerging technologies. This study explores the integration of both existing and emerging technologies for enhancing FDA processes. A Design Science Research (DSR) approach is adopted, with data collection methods that involve the use of the literature, archival materials, case studies and survey methods. The research demonstrates how the use of technologies, such as database management systems (DBMSs), building information modelling (BIM), artificial intelligence (AI) and games engines, can improve the analytical efficiency, data management, and presentation of findings through a case study. The study showcases the transformative potential of these interventions in streamlining FDA processes, ultimately leading to more accurate and efficient resolution of construction disputes. The proposed process is exemplified by the development of a prototype: the Forensic Information Modelling Visualiser (FIMViz). The FIMViz is a practical tool that has received positive evaluation by FDA experts. The prototype and the enhanced FDA process model that underpins it demonstrate significant advancement in FDA practices, promoting improved decision-making and collaboration between project participants. Further development is needed, but the results could ultimately streamline the FDA process and minimise the uncertainties in FDA outcomes, thus reducing the incidence of costly disputes to the wider economic benefit of the industry generally.


  • Open Access

    Building Information Modelling

    by Omar Doukari, Mohamad Kassem, David Greenwood

    From its origins as a computer-aided three-dimensional modelling tool, Building Information Modelling (BIM) has evolved to incorporate time scheduling, cost management, and ultimately an information management framework that has the potential to enhance decision-making throughout the whole life-cycle of built assets. This chapter summarises state-of-the-art BIM and its benefits. It then considers the particular characteristics of deep renovation projects, the challenges confronting their delivery, and the potential for using BIM to meet the challenges. This includes the application of Artificial Intelligence (AI) and Machine Learning (ML) to BIM models to optimise deep renovation project delivery. The prospects for this are encouraging, but further development work, including the creation of ontologies that are appropriate for renovation work, is still needed.


  • Open Access

    A BIM-based Techno-Economic Framework and Tool for Evaluating and Comparing Building Renovation Strategies

    by Omar Doukari, Enrico Scoditti, Mohamad Kassem, David Greenwood

    Building renovation presents real challenges for project participants which frequently generate high cost and schedule overruns. The disruption caused to occupants is one of the main challenges for the planning and management of renovation works. To better manage occupant interference and enable the acceleration of renovation works, this study aims to develop a novel framework for the assessment and optimisation of renovation strategies using BIM. The concept of disruption is formalised through a renovation ontology using the UML language. To enable process automation, the renovation ontology is then populated, and knowledge related to renovation tasks, constraints, duration, cost, equipment, and disruption are captured, structured and validated with industry partners. A digital tool and a set of Key Performance Indicators are also developed so as to facilitate the identification, assessment and optimisation of renovation scenarios in terms of cost, project duration and disruptive potential. Using a step-by-step process, detailed descriptions of the methodologies and workflows of the proposed framework are finally provided and demonstrated on a live case study located in Greece. The findings show no spatial correlation exist for the disruption concept and also confirm the disruptive nature of building floor renovation which can lead to a low rate of retrofitting them. Furthermore, the findings question the general applicability of the Whiteman et al.’s heuristic suggesting to prioritise the planning and execution of the most disruptive renovation activities as early as possible in the renovation process, and of the preference of Fawcett for a one-off renovation strategy recommending to conduct renovation works in one go as quickly as possible. Ultimately, the TEA framework will be further demonstrated and tested by end-users on three additional European case studies within the RINNO project which will particularly help validating the added value and benefits of the TEA framework from a user perspective.


  • Open Access

    The impact of built environment on mental health: A COVID-19 lockdown perspective

    by Jie Xiao, Jianfeng Zhao, Zhiwen Luo, Fang Liu, David Greenwood


  • Open Access

    The Creation of Construction Schedules in 4D BIM: A Comparison of Conventional and Automated Approaches

    by Omar Doukari, Boubacar Seck, David Greenwood

    Building Information Modelling (BIM) is now a globally recognised phenomenon, though its adoption remains inconsistent and variable between and within the construction sectors of different countries. BIM technology has enabled a wide range of functional applications, one of which, ‘4D BIM’, involves linking the tasks in a project’s construction schedule to its object-orientated 3D model to improve the logistical decision making and delivery of the project. Ideally, this can be automatically generated but in reality, this is not currently possible, and the process requires considerable manual effort. The level of maturity and expertise in the use of BIM amongst the project participants still varies considerably; adding further obstacles to the ability to derive full benefits from BIM. Reflecting these challenges, two case studies are presented in this paper. The first describes a predominantly manual approach that was used to ameliorate the implementation of 4D BIM on a project in Paris. In fact, there is scope for automating the process: a combination of BIM and Artificial Intelligence (AI) could exploit newly-available data that are increasingly obtainable from smart devices or IoT sensors. A prerequisite for doing so is the development of dedicated ontologies that enable the formalisation of the domain knowledge that is relevant to a particular project typology. Perhaps the most challenging example of this is the case of renovation projects. In the second case study, part of a large European research project, the authors propose such an ontology and demonstrate its application by developing a digital tool for application within the context of deep renovation projects.


  • Open Access

    Unpacking the context of value for money assessment in global markets: a procurement option framework for public-private partnerships

    by Jianfeng Zhao, Niraj Thurairajah, David Greenwood, Henry Liu, Jingfeng Yuan

    Purpose: The unprecedented SARS-CoV-2 (COVID-19) pandemic has further constrained the budgets of governments worldwide for delivering their much-needed infrastructure. Consequently, public-private partnerships (PPPs), with the private sector's investment and ingenuity, would appear to be an increasingly popular alternative. Value for money (VfM) has become the major criterion for evaluating PPPs against the traditional public sector procurement and, however, is plagued with controversy. Hence, it is important that governments compare and contrast their practice with similar and disparate bodies to engender best practice. This paper, therefore, aims to understand governments' assessment context and provide a cross-continental comparison of their VfM assessment.Design/methodology/approach: Faced with different domestic contexts (e.g. aging infrastructure, population growth, and competing demands on finance), governments tend to place different emphases when undertaking the VfM assessment. In line with the theory of boundary spanning, a cross-continental comparison is conducted between three of the most noticeable PPP markets (i.e. the United Kingdom, Australia and China) about their VfM assessment. The institutional level is interpreted by a social, economic and political framework, and the methodological level is elucidated through a qualitative and quantitative VfM assessment.Findings: There are individual institutional characteristics that have shaped the way each country assesses VfM. For the methodological level, we identify that: (1) these global markets use a public sector comparator as the benchmark in VfM assessment; (2) ambiguous qualitative assessment is conducted only against PPPs to strengthen their policy development; (3) Australia's priority is in service provision whereas that of the UK and China is project finance and production; and (4) all markets are seeking an amelioration of existing controversial VfM assessments so that purported VfM relates to project lifecycles. As such, an option framework is proposed to make headway towards a sensible selection of infrastructure procurement approaches in the post COVID-19 era.Originality/value: This study addresses a current void of enhancing the decision-making process for using PPPs within today's changing environment and then opens up an avenue for future empirical research to examine the option framework and ensuing VfM decisions. Practically, it presents a holistic VfM landscape for public sector procurers that aim to engage with PPPs for their infrastructure interventions.


  • Open Access

    Object-centred automated compliance checking: a novel, bottom-up approach

    by Omar Doukari, David Greenwood, Kay Rogage, Mohamad Kassem

    Journal of Information Technology in Construction


  • Open Access

    Towards an Interoperable Approach for Modelling and Managing Smart Building Data: The Case of the CESI Smart Building Demonstrator

    by Omar Doukari, Boubacar Seck, David Greenwood, Haibo Feng, Mohamad Kassem

    Buildings have a significant impact on energy consumption and carbon emissions. Smart buildings are deemed to play a crucial role in improving the energy performance of buildings and cities. Managing a smart building requires the modelling of data concerning smart systems and components. While there is a significant amount of research on optimising building energy using the smart building concept, there is a dearth of studies investigating the modelling and management of smart systems’ data, which is the starting point for establishing the necessary digital environment for representing a smart building. This study aimed to develop and test a solution for modelling and managing smart building information using an industry foundation classes (IFCs)-based BIM process. A conceptual model expressed in the SysML language was proposed to define a smart building. Five BIM approaches were identified as potential ‘prototypes’ for representing and exchanging smart building information. The fidelity of each approach is checked through a BIM-based validation process using an open-source visualisation platform. The different prototypes were also assessed using a multi-criteria comparison method to identify the preferred approach for modelling and managing smart building information. The preferred approach was prototyped and tested in a use case focused on building energy consumption monitoring to evaluate its ability to manage and visualise the smart building data. The use case was applied in a real case study using a full-scale demonstrator, namely, the ‘Nanterre 3’ (N3) smart building located at the CESI campus in Paris-Nanterre. The findings demonstrated that an open BIM format in the form of IFCs could achieve adequate modelling of smart building data without information loss. Future extensions of the proposed approach were finally outlined.


  • Open Access

    Value for money in transport infrastructure investment: An enhanced model for better procurement decisions

    by Jianfeng Zhao, David Greenwood, Niraj Thurairajah, Henry J. Liu, Richard Haigh