Lihui Zhang
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Lihui Zhang has a total of 33 co-authors. Here are the top co-authors by number of shared publications:
- Xin Zou
Department of Economic Management, North China Electric Power University, Baoding 071003, China
8 shared publications - Jianxue Chai
School of Economics and Management, North China Electric Power University, Beijing 102206, China
2 shared publications - Qian Zhang
State Grid Energy Research Institute Company Limited, Beijing, 102209, China
2 shared publications Songrui Li
School of Economics and Management, North China Electric Power University, Beijing, China; Beijing Key Laboratory of New Energy and Low-Carbon Development, Changping, Beijing 102206, China
2 shared publicationsXiaoli Liu
North China Electric Power Univ
2 shared publications- Cheng Luo
Master’s Candidate, Dept. of Mechanical and Aerospace Engineering, Hong Kong Univ. of Science and Technology, Hong Kong, China. ORCID:
1 shared publication
Latest Publications
- 24 July 2025
- Published by Elsevier in Journal of Environmental Management
- Vol. 392, 126699
Carbon allowance decision optimization with multi-agent simulation: Incorporating behavioral drivers
- 24 July 2025
- Published by Elsevier in Journal of Environmental Management
- Vol. 392, 126699
Carbon allowance decision optimization with multi-agent simulation: Incorporating behavioral drivers
- 2 April 2024
- Published by Springer Nature in Clean Technologies and Environmental Policy
- Vol. 26 (12) , 4197-4214
Study on the effectiveness and influencing factors of china’s carbon emissions trading policy from industries’ perspective
- 2 April 2024
- Published by Springer Nature in Clean Technologies and Environmental Policy
- Vol. 26 (12) , 4197-4214
Study on the effectiveness and influencing factors of china’s carbon emissions trading policy from industries’ perspective
- 5 April 2023
- Published by Elsevier in Science of The Total Environment
- Vol. 880, 163229
Exploring the coupling coordination relationship between eco-environment and renewable energy development in rural areas: A case of China
- 5 April 2023
- Published by Elsevier in Science of The Total Environment
- Vol. 880, 163229
Exploring the coupling coordination relationship between eco-environment and renewable energy development in rural areas: A case of China
- Open Access
- 16 January 2019
- Published by MDPI AG in World Electric Vehicle Journal
- Vol. 10 (1) , 4
Risk Identification and Analysis for PPP Projects of Electric Vehicle Charging Infrastructure Based on 2-Tuple and the DEMATEL Model
Risk management is critical to the success of electric vehicle charging infrastructure public–private partnership (EVCI-PPP) projects, as risks are present throughout the whole life cycle of projects. However, in EVCI-PPP projects, risk factors are often interdependent and, consequently, the interrelationships among factors affect the risk management, which is ignored in the existing studies. To identify the risk factors of EVCI-PPP projects and analyze their internal influence relations, this paper develops a risk identification and analysis model of EVCI-PPP projects based on the 2-tuple linguistic representation model and the decision-making trial and evaluation laboratory (DEMATEL) model. First, a risk factor set is established including 22 criteria involved in 5 dimensions of political/legal risk, economic/market risk, social/environment risk, project/technical risk, and managing risk. Next, the 2-tuple model is introduced to integrate the decision makers’ evaluation information in a linguistic environment, and the direct relation matrix is calculated. Then, the cause–effect relations and a significant degree of risk factors are interpreted using the extended DEMATEL technique. The results show that economic/market risk is the most significant factor of EVCI-PPP projects, and 22 criteria are classified into 14 cause factors and 8 effect factors. Finally, suggestions are provided for decision-makers to ensure the success of EVCI-PPP projects.
- 16 January 2019
- Published by MDPI AG in World Electric Vehicle Journal
- Vol. 10 (1) , 4
Open AccessRisk Identification and Analysis for PPP Projects of Electric Vehicle Charging Infrastructure Based on 2-Tuple and the DEMATEL Model
Risk management is critical to the success of electric vehicle charging infrastructure public–private partnership (EVCI-PPP) projects, as risks are present throughout the whole life cycle of projects. However, in EVCI-PPP projects, risk factors are often interdependent and, consequently, the interrelationships among factors affect the risk management, which is ignored in the existing studies. To identify the risk factors of EVCI-PPP projects and analyze their internal influence relations, this paper develops a risk identification and analysis model of EVCI-PPP projects based on the 2-tuple linguistic representation model and the decision-making trial and evaluation laboratory (DEMATEL) model. First, a risk factor set is established including 22 criteria involved in 5 dimensions of political/legal risk, economic/market risk, social/environment risk, project/technical risk, and managing risk. Next, the 2-tuple model is introduced to integrate the decision makers’ evaluation information in a linguistic environment, and the direct relation matrix is calculated. Then, the cause–effect relations and a significant degree of risk factors are interpreted using the extended DEMATEL technique. The results show that economic/market risk is the most significant factor of EVCI-PPP projects, and 22 criteria are classified into 14 cause factors and 8 effect factors. Finally, suggestions are provided for decision-makers to ensure the success of EVCI-PPP projects.
- Open Access
Prediction of China’s Energy Consumption Based on Robust Principal Component Analysis and PSO-LSSVM Optimized by the Tabu Search Algorithm
China’s energy consumption issues are closely associated with global climate issues, and the scale of energy consumption, peak energy consumption, and consumption investment are all the focus of national attention. In order to forecast the amount of energy consumption of China accurately, this article selected GDP, population, industrial structure and energy consumption structure, energy intensity, total imports and exports, fixed asset investment, energy efficiency, urbanization, the level of consumption, and fixed investment in the energy industry as a preliminary set of factors; Secondly, we corrected the traditional principal component analysis (PCA) algorithm from the perspective of eliminating “bad points” and then judged a “bad spot” sample based on signal reconstruction ideas. Based on the above content, we put forward a robust principal component analysis (RPCA) algorithm and chose the first five principal components as main factors affecting energy consumption, including: GDP, population, industrial structure and energy consumption structure, urbanization; Then, we applied the Tabu search (TS) algorithm to the least square to support vector machine (LSSVM) optimized by the particle swarm optimization (PSO) algorithm to forecast China’s energy consumption. We collected data from 1996 to 2010 as a training set and from 2010 to 2016 as the test set. For easy comparison, the sample data was input into the LSSVM algorithm and the PSO-LSSVM algorithm at the same time. We used statistical indicators including goodness of fit determination coefficient (R2), the root means square error (RMSE), and the mean radial error (MRE) to compare the training results of the three forecasting models, which demonstrated that the proposed TS-PSO-LSSVM forecasting model had higher prediction accuracy, generalization ability, and higher training speed. Finally, the TS-PSO-LSSVM forecasting model was applied to forecast the energy consumption of China from 2017 to 2030. According to predictions, we found that China shows a gradual increase in energy consumption trends from 2017 to 2030 and will breakthrough 6000 million tons in 2030. However, the growth rate is gradually tightening and China’s energy consumption economy will transfer to a state of diminishing returns around 2026, which guides China to put more emphasis on the field of energy investment.
Open AccessPrediction of China’s Energy Consumption Based on Robust Principal Component Analysis and PSO-LSSVM Optimized by the Tabu Search Algorithm
China’s energy consumption issues are closely associated with global climate issues, and the scale of energy consumption, peak energy consumption, and consumption investment are all the focus of national attention. In order to forecast the amount of energy consumption of China accurately, this article selected GDP, population, industrial structure and energy consumption structure, energy intensity, total imports and exports, fixed asset investment, energy efficiency, urbanization, the level of consumption, and fixed investment in the energy industry as a preliminary set of factors; Secondly, we corrected the traditional principal component analysis (PCA) algorithm from the perspective of eliminating “bad points” and then judged a “bad spot” sample based on signal reconstruction ideas. Based on the above content, we put forward a robust principal component analysis (RPCA) algorithm and chose the first five principal components as main factors affecting energy consumption, including: GDP, population, industrial structure and energy consumption structure, urbanization; Then, we applied the Tabu search (TS) algorithm to the least square to support vector machine (LSSVM) optimized by the particle swarm optimization (PSO) algorithm to forecast China’s energy consumption. We collected data from 1996 to 2010 as a training set and from 2010 to 2016 as the test set. For easy comparison, the sample data was input into the LSSVM algorithm and the PSO-LSSVM algorithm at the same time. We used statistical indicators including goodness of fit determination coefficient (R2), the root means square error (RMSE), and the mean radial error (MRE) to compare the training results of the three forecasting models, which demonstrated that the proposed TS-PSO-LSSVM forecasting model had higher prediction accuracy, generalization ability, and higher training speed. Finally, the TS-PSO-LSSVM forecasting model was applied to forecast the energy consumption of China from 2017 to 2030. According to predictions, we found that China shows a gradual increase in energy consumption trends from 2017 to 2030 and will breakthrough 6000 million tons in 2030. However, the growth rate is gradually tightening and China’s energy consumption economy will transfer to a state of diminishing returns around 2026, which guides China to put more emphasis on the field of energy investment.
- Open Access
- 3 May 2018
- Published by Wiley in Mathematical Problems in Engineering
- Vol. 2018, 1-12
A Biobjective Optimization Model for Deadline Satisfaction in Line-of-Balance Scheduling with Work Interruptions Consideration
The line-of-balance (LOB) technique has demonstrated many advantages in scheduling repetitive projects, one of which is that it allows more than one crew to be hired by an activity concurrently. The deadline satisfaction problem in LOB scheduling (DSPLOB) aims to find an LOB schedule such that the project is completed within a given deadline and the total number of crews is minimized. Previous studies required a strict application of crew work continuity, which may lead to a decline in the competitiveness of solutions. This paper introduces work interruptions into the DSPLOB and presents a biobjective optimization model that can balance the two conflicting objectives of minimizing the total number of crews and maximizing work continuity. An efficient version of the-constraint method is customized to find all feasible tradeoff solutions. Then, these solutions are further improved by an automated procedure to reduce the number of interruptions for each activity without deteriorating the performance in both the objectives. The effectiveness and practicability of the proposed model are verified using a considerable number of instances. The results show that introducing work interruptions provides more flexibility in reducing the total number of crews under the LOB framework, especially for serial projects with a tight deadline constraint.- 3 May 2018
- Published by Wiley in Mathematical Problems in Engineering
- Vol. 2018, 1-12
Open AccessA Biobjective Optimization Model for Deadline Satisfaction in Line-of-Balance Scheduling with Work Interruptions Consideration
The line-of-balance (LOB) technique has demonstrated many advantages in scheduling repetitive projects, one of which is that it allows more than one crew to be hired by an activity concurrently. The deadline satisfaction problem in LOB scheduling (DSPLOB) aims to find an LOB schedule such that the project is completed within a given deadline and the total number of crews is minimized. Previous studies required a strict application of crew work continuity, which may lead to a decline in the competitiveness of solutions. This paper introduces work interruptions into the DSPLOB and presents a biobjective optimization model that can balance the two conflicting objectives of minimizing the total number of crews and maximizing work continuity. An efficient version of the-constraint method is customized to find all feasible tradeoff solutions. Then, these solutions are further improved by an automated procedure to reduce the number of interruptions for each activity without deteriorating the performance in both the objectives. The effectiveness and practicability of the proposed model are verified using a considerable number of instances. The results show that introducing work interruptions provides more flexibility in reducing the total number of crews under the LOB framework, especially for serial projects with a tight deadline constraint. - 1 January 2018
- Published by American Society of Civil Engineers (ASCE) in Journal of Management in Engineering
- Vol. 34 (1)
Modeling and Solving the Deadline Satisfaction Problem in Line-of-Balance Scheduling
This study investigates the deadline satisfaction problem in line-of-balance (LOB) scheduling, where each activity can be done concurrently in several units by hiring additional crews, and all employed crews are allocated to implement an activity in sequential units smoothly with no interruption. Furthermore, the project must be completed within a given deadline. In previous studies, the objective was to minimize the total number of crews under the assumption that the cost of hiring a crew is the same for all activities. In fact, this cost usually differs among activities because of the differences in type of work, crew size, and technical level of workers. This paper presents a mixed-integer linear programming model with an extended objective of minimizing the crew employment cost of all activities. The model is equipped with an exact procedure to validate the feasibility of a prespecified deadline. A highway project was used to show the application of the proposed method, and then extensive computational experiments were conducted to investigate the performance of the proposed method by comparing the obtained results with those obtained by the existing methods. The results highlight the significance of integrating the time-cost trade-off analysis, and indicate that the proposed method can find optimal solutions for large-scale projects within a reasonable amount of time.
- 1 January 2018
- Published by American Society of Civil Engineers (ASCE) in Journal of Management in Engineering
- Vol. 34 (1)
Modeling and Solving the Deadline Satisfaction Problem in Line-of-Balance Scheduling
This study investigates the deadline satisfaction problem in line-of-balance (LOB) scheduling, where each activity can be done concurrently in several units by hiring additional crews, and all employed crews are allocated to implement an activity in sequential units smoothly with no interruption. Furthermore, the project must be completed within a given deadline. In previous studies, the objective was to minimize the total number of crews under the assumption that the cost of hiring a crew is the same for all activities. In fact, this cost usually differs among activities because of the differences in type of work, crew size, and technical level of workers. This paper presents a mixed-integer linear programming model with an extended objective of minimizing the crew employment cost of all activities. The model is equipped with an exact procedure to validate the feasibility of a prespecified deadline. A highway project was used to show the application of the proposed method, and then extensive computational experiments were conducted to investigate the performance of the proposed method by comparing the obtained results with those obtained by the existing methods. The results highlight the significance of integrating the time-cost trade-off analysis, and indicate that the proposed method can find optimal solutions for large-scale projects within a reasonable amount of time.