Gang Wang
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Gang Wang has a total of 12 co-authors. Here are the top co-authors by number of shared publications:
- Gang Mu
Key Laboratory of Modern Power System Simulation and Control and Renewable Energy Technology, Ministry of Education, Northeast Electric Power University, Jilin, China
1 shared publication Gao De-Bin
Northeast Electric Power dispatching Center
1 shared publication- Hongpeng Zhang
Dalian Maritime University
1 shared publication Hou Kai-Yuan
System operation department, Northeast Electric Power Dispatching Center
1 shared publication- Ligai Kang
School of Civil Engineering, Hebei University of Science and Technology, Shijiazhuang 050018, China
1 shared publication - Ming-Li Zhang
College of Civil Engineering, Lanzhou University of Technology, Lanzhou, China
1 shared publication
Latest Publications
- Open Access
- 7 April 2020
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Access
- Vol. 8, 67396-67407
The Power Simulation of Water-Cooled Central Air-Conditioning System Based on Demand Response
With rapid development of smart grid, terminal power load is paid more and more attention, especially that of air conditioning system, which constitute an integral part of summer peak electricity load. In this paper, through controlling indoor air temperature deduced by equivalent thermal parameters-model, daily energy consumption and energy consumption during peak hours can be adjusted and reduced to realize demand side management. To reduce peak load of grid and ensure stable and reliable operation of grid, four temperature control strategies, including constant setting temperature control strategy, pre-cooling control strategy, curtailment control strategy and improved curtailment control strategy were proposed. Meanwhile, three operation schemes of the chiller were also employed. Furthermore, considering the power consumption and curtailment, five indicators including hourly average load, hourly average load ratio, energy saving ratio, load-shedding ratio during peak hours and coefficient of performance (COP) have been proposed to evaluate the performance. Results showed that the operation scheme of operating numbers control obtained better effect. Energy saving ratio was highest of 32.5% with curtailment control strategy, while load-shedding ratio during peak hours was optimal with improved curtailment control strategy. However, COP was maximum at 3.66 when pre-cooling control strategy was employed. This study can guide the operation of water-cooled air conditioning system through energy saving ratio and COP, also it has more benefits on economy of power system by hourly average load and load-shedding ratio.
- 7 April 2020
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Access
- Vol. 8, 67396-67407
Open AccessThe Power Simulation of Water-Cooled Central Air-Conditioning System Based on Demand Response
With rapid development of smart grid, terminal power load is paid more and more attention, especially that of air conditioning system, which constitute an integral part of summer peak electricity load. In this paper, through controlling indoor air temperature deduced by equivalent thermal parameters-model, daily energy consumption and energy consumption during peak hours can be adjusted and reduced to realize demand side management. To reduce peak load of grid and ensure stable and reliable operation of grid, four temperature control strategies, including constant setting temperature control strategy, pre-cooling control strategy, curtailment control strategy and improved curtailment control strategy were proposed. Meanwhile, three operation schemes of the chiller were also employed. Furthermore, considering the power consumption and curtailment, five indicators including hourly average load, hourly average load ratio, energy saving ratio, load-shedding ratio during peak hours and coefficient of performance (COP) have been proposed to evaluate the performance. Results showed that the operation scheme of operating numbers control obtained better effect. Energy saving ratio was highest of 32.5% with curtailment control strategy, while load-shedding ratio during peak hours was optimal with improved curtailment control strategy. However, COP was maximum at 3.66 when pre-cooling control strategy was employed. This study can guide the operation of water-cooled air conditioning system through energy saving ratio and COP, also it has more benefits on economy of power system by hourly average load and load-shedding ratio.
- 1 April 2009
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- No. 21569681,p. 1-6
The study on the stability properties of northeast main power grid after northeast-north power grid dc back-to-back interconnection
From October 2008 the interconnection between northeast and north power grid switched from alternating current to direct current. It is urgent to research the stability of northeast power grid based on the real network data. This paper studied the stability changing by applying real-time time-domain simulation method and frequency-domain analysis method. Research result indicated that the stability characteristic of northeast power grid has changed greatly compare to AC interconnection mode. This study is also fundamental to building the northeast power grid operation control strategy.
- 1 April 2009
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- No. 21569681,p. 1-6
The study on the stability properties of northeast main power grid after northeast-north power grid dc back-to-back interconnection
From October 2008 the interconnection between northeast and north power grid switched from alternating current to direct current. It is urgent to research the stability of northeast power grid based on the real network data. This paper studied the stability changing by applying real-time time-domain simulation method and frequency-domain analysis method. Research result indicated that the stability characteristic of northeast power grid has changed greatly compare to AC interconnection mode. This study is also fundamental to building the northeast power grid operation control strategy.