FXFengfeng Xie
Fengfeng Xie
*This is an algorithmically generated author record based on publicly available information.
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Fengfeng Xie has a total of 14 co-authors. Here are the top co-authors by number of shared publications:
- Baozhuang Niu
South China University of Technology
5 shared publications - Xinhai Deng2 shared publications
Chencan Lin
1 shared publication- Chenghua Shi
School of Civil Engineering, Central South University, Changsha 410075, China
1 shared publication - Enkai Zhang1 shared publication
Fanzhuo Zeng
University of Southampton
1 shared publication
Latest Publications
- 28 August 2026
- Published by Elsevier in International Journal of Production Economics
- Vol. 303
Fine-tuning collaboration in a Co-opetitive manufacturing supply chain
- 28 August 2026
- Published by Elsevier in International Journal of Production Economics
- Vol. 303
Fine-tuning collaboration in a Co-opetitive manufacturing supply chain
- 30 April 2026
- Published by Elsevier in European Journal of Operational Research
- Vol. 335 (3) , 855-867
Co-opetitive improvement of multi-win green performance: Is horizontal order pooling more effective than vertical cost-sharing?
- 30 April 2026
- Published by Elsevier in European Journal of Operational Research
- Vol. 335 (3) , 855-867
Co-opetitive improvement of multi-win green performance: Is horizontal order pooling more effective than vertical cost-sharing?
- 10 August 2023
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 62 (18) , 6518-6541
Optimisation of carbon emission reduction in a competitive market with varying saturation and eco-conscious consumers
- 10 August 2023
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 62 (18) , 6518-6541
Optimisation of carbon emission reduction in a competitive market with varying saturation and eco-conscious consumers
- Open Access
- 22 November 2017
- Published by Wiley in Complexity
- Vol. 2017, 1-19
A Joint Inspection-Based Preventive Maintenance and Spare Ordering Optimization Policy Using a Three-Stage Failure Process
Separated decision-making for maintenance and spare ordering is unrealistic in the industry, so this paper aims to optimize them together. A joint policy of inspection-based preventive maintenance (PM) and spare ordering considering two modes of spare ordering, namely, a regular order and an emergency order, is proposed for single-unit systems using a three-stage failure process. If the system is recognized to be in the minor defective stage, the original inspection interval is shortened and a regular order is placed. However, replacement is undertaken preventively or correctively if the severe defective stage is identified or a failure occurs. Depending on the system state and the state of the regular ordered spare when replacement is needed, all possible scenarios are considered to construct optimization model I. The decision variables are the optimal inspection interval and the times of shortening the original inspection interval. Additionally, model II on the basis of an assumption that the spare is always ordered at time 0 is also developed. The results from a numerical example illustrated the applicability and the effectiveness of model compared to model II, and the irregular inspection policy is validated to be cost-saving compared to the regular inspection policy.- 22 November 2017
- Published by Wiley in Complexity
- Vol. 2017, 1-19
Open AccessA Joint Inspection-Based Preventive Maintenance and Spare Ordering Optimization Policy Using a Three-Stage Failure Process
Separated decision-making for maintenance and spare ordering is unrealistic in the industry, so this paper aims to optimize them together. A joint policy of inspection-based preventive maintenance (PM) and spare ordering considering two modes of spare ordering, namely, a regular order and an emergency order, is proposed for single-unit systems using a three-stage failure process. If the system is recognized to be in the minor defective stage, the original inspection interval is shortened and a regular order is placed. However, replacement is undertaken preventively or correctively if the severe defective stage is identified or a failure occurs. Depending on the system state and the state of the regular ordered spare when replacement is needed, all possible scenarios are considered to construct optimization model I. The decision variables are the optimal inspection interval and the times of shortening the original inspection interval. Additionally, model II on the basis of an assumption that the spare is always ordered at time 0 is also developed. The results from a numerical example illustrated the applicability and the effectiveness of model compared to model II, and the irregular inspection policy is validated to be cost-saving compared to the regular inspection policy.