Hang Yin
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Hang Yin has a total of 12 co-authors. Here are the top co-authors by number of shared publications:
- Dan Wang
Chongqing Univ
2 shared publications Binchao Deng
School of Management, Tianjin University of Technology, Tianjin, China
1 shared publication- Henry Junxiao Liu
School of Design and the Built Environment, University of Canberra
1 shared publication Hui-Jie Jiang
Shenzhen Polytechnic, Shenzhen, People’s Republic of China
1 shared publication- Huijie Jiang
Department of Radiology, The Second Affiliated Hospital of Harbin Medical University, Harbin, China
1 shared publication Yang Wang
1 shared publication
Latest Publications
- 1 October 2024
- Published by Serbian Project Management Association
- p. 252-262
Management Application of BIM Collaboration Platform in the Entire Lifecycle of Construction Projects
This paper delves into the application of Building Information Modeling (BIM) collaborative platforms in the lifecycle management of construction projects, analyzing their significance in the current construction industry. Initially, the background of BIM collaborative platforms is introduced, emphasizing their goals of enhancing the usability of BIM models and reducing communication costs, with a focus on optimizing the collaborative management of involved units. The paper then addresses several key challenges faced by BIM collaborative platforms, including issues related to platform positioning, functionality, data integration, graphic engines, and integrated management. Furthermore, it elaborates on the effective application of BIM collaborative platforms in various project phases: survey and design, construction implementation, and operation and maintenance management. The paper highlights the value of BIM collaborative platforms in integrating data from various stakeholders and specializations, enhancing work efficiency and project quality while acknowledging challenges in widespread application due to non-uniform standards and insufficient policy support. It concludes with a future outlook, anticipating a broader application spectrum for BIM collaborative platforms driven by national policy initiatives and collaborative efforts within the industry.
- 1 October 2024
- Published by Serbian Project Management Association
- p. 252-262
Management Application of BIM Collaboration Platform in the Entire Lifecycle of Construction Projects
This paper delves into the application of Building Information Modeling (BIM) collaborative platforms in the lifecycle management of construction projects, analyzing their significance in the current construction industry. Initially, the background of BIM collaborative platforms is introduced, emphasizing their goals of enhancing the usability of BIM models and reducing communication costs, with a focus on optimizing the collaborative management of involved units. The paper then addresses several key challenges faced by BIM collaborative platforms, including issues related to platform positioning, functionality, data integration, graphic engines, and integrated management. Furthermore, it elaborates on the effective application of BIM collaborative platforms in various project phases: survey and design, construction implementation, and operation and maintenance management. The paper highlights the value of BIM collaborative platforms in integrating data from various stakeholders and specializations, enhancing work efficiency and project quality while acknowledging challenges in widespread application due to non-uniform standards and insufficient policy support. It concludes with a future outlook, anticipating a broader application spectrum for BIM collaborative platforms driven by national policy initiatives and collaborative efforts within the industry.
- 1 May 2021
- Published by Emerald Publishing in Proceedings of the Institution of Civil Engineers - Management, Procurement and Law
- Vol. 174 (2) , 69-83
Bibliometrics and visualisation of research on trust in construction projects
The present study used scientific mapping analysis to describe the overall state of the literature on trust in construction projects (TC) and to gain a deeper understanding of its intellectual structure and research areas of interest. It focuses on 349 articles from 27 journals in the construction-management domain from the past 20 years. The influential journals, scholars and articles in the domain of TC were analysed. A qualitative follow-up discussion targets two main objectives: intellectual structure and research fronts. The TC intellectual structure involves topics such as relationships, project performance, contracts and behaviour, approached by way of multiple disciplinary fields, including ‘transaction, management and accounting’, which are supported primarily by organisational theory, organisational trust theory, trust theory and incomplete contract theory. Multi-case analysis and structural equation models are used widely as research tools. New key TC research areas include varying relationship characteristics, trust evolution, interpersonal trust and new problems in project governance.
- 1 May 2021
- Published by Emerald Publishing in Proceedings of the Institution of Civil Engineers - Management, Procurement and Law
- Vol. 174 (2) , 69-83
Bibliometrics and visualisation of research on trust in construction projects
The present study used scientific mapping analysis to describe the overall state of the literature on trust in construction projects (TC) and to gain a deeper understanding of its intellectual structure and research areas of interest. It focuses on 349 articles from 27 journals in the construction-management domain from the past 20 years. The influential journals, scholars and articles in the domain of TC were analysed. A qualitative follow-up discussion targets two main objectives: intellectual structure and research fronts. The TC intellectual structure involves topics such as relationships, project performance, contracts and behaviour, approached by way of multiple disciplinary fields, including ‘transaction, management and accounting’, which are supported primarily by organisational theory, organisational trust theory, trust theory and incomplete contract theory. Multi-case analysis and structural equation models are used widely as research tools. New key TC research areas include varying relationship characteristics, trust evolution, interpersonal trust and new problems in project governance.
- 8 April 2021
- Published by Emerald Publishing in Engineering, Construction and Architectural Management
- Vol. 29 (4) , 1661-1677
Response of contractor behavior to hierarchical governance: effects on the performance of mega-projects
Purpose: This study aims to examine the impacts of formal and informal hierarchical governances (HGs) on the performance of mega-projects and the mediating role of contractor behavior (i.e. perfunctory and consummate behaviors) in these relationships.Design/methodology/approach: A total of 375 valid data entries from managers representing 375 mega-projects were analyzed through path analysis.Findings: Both formal and informal HGs exert positive effects on the performance of mega-projects. While formal HG positively affects contractor perfunctory behavior and contractor consummate behavior, informal HG affects contractor perfunctory behavior only. Contractor behavior mediates the relationship between formal HG and project performance.Research limitations/implications: The impacts of potential moderators (e.g. institutional arrangement and complexity) on the relationship between HG and contractor behavior have not been considered in this study.Practical implications: This study is useful for owners to enhance formal HG to improve contractor perfunctory and consummate behaviors, which in turn can enhance the performance of mega-projects.Originality/value: This study expands the knowledge of mega-project performance management from the perspective of HG. It also contributes to the literature of contractor behavior within the context of mega-projects.
- 8 April 2021
- Published by Emerald Publishing in Engineering, Construction and Architectural Management
- Vol. 29 (4) , 1661-1677
Response of contractor behavior to hierarchical governance: effects on the performance of mega-projects
Purpose: This study aims to examine the impacts of formal and informal hierarchical governances (HGs) on the performance of mega-projects and the mediating role of contractor behavior (i.e. perfunctory and consummate behaviors) in these relationships.Design/methodology/approach: A total of 375 valid data entries from managers representing 375 mega-projects were analyzed through path analysis.Findings: Both formal and informal HGs exert positive effects on the performance of mega-projects. While formal HG positively affects contractor perfunctory behavior and contractor consummate behavior, informal HG affects contractor perfunctory behavior only. Contractor behavior mediates the relationship between formal HG and project performance.Research limitations/implications: The impacts of potential moderators (e.g. institutional arrangement and complexity) on the relationship between HG and contractor behavior have not been considered in this study.Practical implications: This study is useful for owners to enhance formal HG to improve contractor perfunctory and consummate behaviors, which in turn can enhance the performance of mega-projects.Originality/value: This study expands the knowledge of mega-project performance management from the perspective of HG. It also contributes to the literature of contractor behavior within the context of mega-projects.
- Open Access
- 1 January 2021
- Published by Wiley in Advances in Civil Engineering
- Vol. 2021 (1)
BIM Performance, Project Complexity, and User Satisfaction: A QCA Study of 39 Cases
Although the realization of building information modeling (BIM) performance is the basis for the generation of user’s satisfaction, few studies have explored the influence path between BIM performance and BIM user’s satisfaction in recent years. Therefore, to enrich the research results of BIM user’s satisfaction and provide reference schemes for engineering practice, this study adopts the fsQCA (fuzzy‐set qualitative comparative analysis) method, taking 39 project cases using BIM technology as the base sample to analyze the influence path between BIM performance and user’s satisfaction. Moreover, this study is based on the configuration theory, examining four elements of BIM performance: BIM accuracy, information integration, functional advantages and manager support, and the complexity of the project. Finally, this study identifies three types of configuration results: performance type, support type, and comprehensive type. The performance type can achieve high user satisfaction in relatively complex projects; the support type requires executive support to improve user satisfaction in less complex projects, and the comprehensive type improves satisfaction through multiple BIM performances without considering project complexity.
- 1 January 2021
- Published by Wiley in Advances in Civil Engineering
- Vol. 2021 (1)
Open AccessBIM Performance, Project Complexity, and User Satisfaction: A QCA Study of 39 Cases
Although the realization of building information modeling (BIM) performance is the basis for the generation of user’s satisfaction, few studies have explored the influence path between BIM performance and BIM user’s satisfaction in recent years. Therefore, to enrich the research results of BIM user’s satisfaction and provide reference schemes for engineering practice, this study adopts the fsQCA (fuzzy‐set qualitative comparative analysis) method, taking 39 project cases using BIM technology as the base sample to analyze the influence path between BIM performance and user’s satisfaction. Moreover, this study is based on the configuration theory, examining four elements of BIM performance: BIM accuracy, information integration, functional advantages and manager support, and the complexity of the project. Finally, this study identifies three types of configuration results: performance type, support type, and comprehensive type. The performance type can achieve high user satisfaction in relatively complex projects; the support type requires executive support to improve user satisfaction in less complex projects, and the comprehensive type improves satisfaction through multiple BIM performances without considering project complexity.