RARidwan Anas

Ridwan Anas

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article

Previous Organizations / Institutes

The organizations / institutes from the scholar's other articles in the past ten years


Ridwan Anas has a total of 33 co-authors. Here are the top co-authors by number of shared publications:


Latest Publications

  • Open Access

    Monte Carlo Simulation Approach to Predict the Toll Road Revenue

    by Ridwan Anas, Gina Cynthia Raphita Hasibuan, Indra Jaya

    The development of toll roads has been increasingly become an attractive option to finance road investments facing lack of infrastructure budget. Regulators play a key role in ensuring that infrastructure projects are affordable and the overall investment envelope is sustainable. This study applies the Monte Carlo simulation to predict toll road revenue under traffic volume uncertainty, using the Tanjung Pura–Pangkalan Brandan section of the Trans Sumatra Toll Road as a case study. Traffic volume is a critical factor in toll revenue projections, and inaccuracies in traffic forecasts can significantly affect the financial viability of toll road investments. The Monte Carlo simulation generates random samples based on historical traffic data distributions to produce probabilistic revenue estimates, capturing the stochastic nature of vehicle volumes and providing confidence intervals for monthly projections. Results indicate that the method achieved a prediction accuracy of 98.2%, which demonstrate its effectiveness in reflecting fluctuations in toll road revenue while maintaining a conservative risk perspective. Future research could enhance this model by incorporating macroeconomic factors and machine learning for long-term traffic pattern prediction, which will support more robust and sustainable toll road investment strategies in Indonesia.

  • Open Access

    Korelasi Antara Kompetensi Sumber Daya Manusia Dengan Keberhasilan Proyek Konstruksi Pada Dinas Pekerjaan Umum Dan Penataan Ruang Provinsi Sumatera Utara

    by Ade Pradipta Putri, Gina Cynthia Raphita Hasibuan, M. Ridwan Anas

    The success of construction projects is influenced by many factors, one of which is the competence of human resources (HR). This study aims to analyze the influence of human resource competencies on the success of construction projects at the Public Works and Spatial Planning Office (PUPR) of North Sumatra Province. This study uses a quantitative method with a multiple linear regression approach on primary data obtained from 50 respondents from technical implementation units within the PUPR Office. The results show that the experience, loyalty, and certification of experts have a significant influence on the success of construction projects. These findings confirm the importance of strengthening human resource capacity through training and certification to improve overall project performance.


  • Open Access

    The Determining Initial Toll Road Tariff Based On BKBOK, ATP And WTP (Case Study : Tebing Tinggi - Pematang Siantar Toll Road Section)

    by Ridwan Anas, Gina C R Hasibuan, M Ihsan Nasution

    The construction of the Trans Sumatra Toll Road or JTTS was initiated as a development strategy and backbone for Indonesia's strategic economic growth. One of the sections that will soon be operational in September 2024 is the Tebing Tinggi-Pematangsiantar Toll Road. Based on Indonesian Law No. 2 2022, the initial road tariff must consider 3 things: the user's ATP (Ability To Pay), the amount of vehicle operating cost benefit (BKBOK), and also the cost recovery of the investment. This study aims to determine the toll tariff based on BKBOK, ATP and WTP. VOC is calculated using the Binamarga 2005 method, VOC model Pd-T-15-2005. ATP is calculated using the Household Budget Method and WTP is calculated using a modification of Stated Preference based on 100 respondents of Class 1 vehicle owners. When calculating the amount of BKBOK, a significant difference in VOC is obtained when the vehicle passes through the toll road compared to passing through non-toll roads, which is Rp. 57,629. This study also shows that the value of travel time is IDR 24,773 per hour, and the value of travel time saving of the Golongan 1 vehicle is IDR 78,035. Travel time savings contribute more benefits than VOC savings, contributing 58% of the total benefits of Rp 135,664 received by the Group 1 toll user, or 35% more than the benefits of VOC savings. The recommended tariff to improve the service of Tebing Tinggi Pematangsiantar Toll Road is between Rp 1055 and Rp 1688 per km, or Rp 47500-Rp 76000. This tariff is willing to be paid by ± 5%-25% of motorists and able to be paid by ± 50%-85% of vehicles.

  • Open Access

    Pelatihan Building Information Modeling untuk Peningkatan Kompetensi Mahasiswa Teknik Sipil Universitas Sumatera Utara

    by Dwina Archenita, Satwarnirat Satwarnirat, Yurisman Yurisman, Dalrino Dalrino, Ridwan Ridwan

    Pelatihan Building Information Modeling (BIM) bertujuan meningkatkan kompetensi mahasiswa teknik sipil dalam menghadapi tuntutan industri konstruksi modern. Kegiatan ini melibatkan 30 maha-siswa Universitas Sumatera Utara (USU) dengan pendekatan daring dan luring menggunakan perangkat lunak Tekla Structures. Mahasiswa yang mengikuti pelatihan ini adalah mahasiswa semester akhir di-mana 90% dari mereka belum bisa menggunakan BIM, namun telah mengetahui pentingnya BIM dalam dunia konstruksi saat ini. Oleh karena itu mahasiswa tersebut sangat antusias saat akan diberikan pelatihan ini. Pelatihan mencakup pengenalan konsep dasar, pemodelan, simulasi analisis beban, dan estimasi material. Hasil menunjukkan peningkatan signifikan, dengan 90% peserta berhasil melakukan pemodelan dan 85% mampu menyelesaikan simulasi serta estimasi material. Evaluasi pasca pelatihan yang dilakukan melalui kuisioner yang diberikan menunjukkan tingkat kepuasan peserta mencapai 100%, bahkan setelah pelatihan selesai peserta masih berkomunikasi dengan tim demi lebih me-mahirkan keterampilan mereka. Kegiatan ini juga akan memperkuat kerja sama antar institusi melalui rancangan MoU dan MoA. Pihak mitra pun merekomendasikan pengembangan pelatihan lanjutan ber-basis daring untuk mempertahankan hasil yang dicapai.

  • Comparative Analysis of Vehicle Operating Cost Methods

    by Ridwan Anas, David Barry Hariganta, Derry W. Nasution

  • Open Access

    ANALISIS PREDIKSI KERUSAKAN PERKERASAN LENTUR BERBASIS IRI (INTERNATIONAL ROUGHNESS INDEX) DENGAN METODE IRMS-V3, RONET

    by Sarah Maghfirah, Muhammad Ridwan Anas, Emma Patricia Bangun

    The condition of road pavement is going to decrease during its service life. To keep a pavement functioning, maintenance must be continuously performed. However, the maintenance that has been carried out so far has not been carried out optimally because the budgeting system is still carried out annually based on the results of a road condition survey. The preparation of the budget is carried out annually by BBPJN SUMUT as the relevant stake holder, based on the FWD value with a back calculation program. This causes funding to become unsustainable so that it affects unsustainable handling as well. There are several methods for calculating predictions of future damage values ​​including IRMS-V3 and RONET. Both have a basis for calculating the value of IRI as the main variable in predicting damage. The purpose of this study is to use both methods and compare them to predict IRI values, traffic growth values, and also the remaining planned life values ​​in order to obtain a funding/budget planning scheme and the right type of treatment. The type of data used is secondary data sourced from North Sumatra BBPJN. The analysis is carried out by calculating the IRI value, traffic volume, and the remaining planned life for the next 5 years. Based on the results of the analysis obtained, road damage will occur more quickly using the RONET method. Road maintenance funds resulting from the IRMS-V3 method are more economical. Then validated using statistical t test. The results show that there is no difference in the average predicted IRI value, but there is a difference in the average predicted RSL value for the two methods


  • Open Access

    Identification of slope angle along Medan-Berastagi road using geographic information system (GIS)

    by Ika Puji Hastuty, Ridwan Anas, Fauziah Ahmad, Roesyanto, Chikita, Suci Amalia

    North Sumatra is located at an altitude between 0 to 2000 masl, covering the lowlands/coasts, mountains, and highlands, where some of the areas are part of the Barisan Mountains. The Barisan Mountains have a sloping and hilly topography; some of it is steep. A place with steep slopes is Medan–Berastagi road which crosses Sibolangit District and Karo Regency. This topography has an impact on road conditions in the event of landslides. The purposes of this study were to identify, analyze, and classify the slope angle along Medan-Berastagi road. The method used was to take data from DEMNAS, then the data was analyzed using the Geographic Information System (GIS). The results showed that Medan-Berastagi road has flat to very steep slopes with an angle of 0–4.73°, 4.73°–11.83°, 11.83°–19.82°, 19.82°–28.69°, and 28.69°–100°. The susceptibility category consists of very low-risk, low-risk, medium-risk, high-risk, and very high-risk. According to the study results, it was found that the area included in the very low-risk area is 2024.53 km2, the area included in the low-risk area is 1135. 87 km2, the area included in the medium-risk area is 792.04 km2, the area included in the high-risk area is 618.32 km2, and the area included in the very high-risk area is 457.08 km2.

  • Open Access

    Direct user benefit of Medan-Binjai toll road based on vehicle operating cost

    by Ridwan Anas, Ika P. Hastuty, Derry W. Nasution

    The development of toll roads has increased since 2005 in Indonesia. The benefits of toll road investment have increased connectivity, accessibility, and mobility. This paper presents the calculation of the estimated direct benefits of the new toll road investment. In general, to evaluate immediate user benefits, benefits are associated with direct user benefits. They are reflected in travel time savings and vehicle operating cost savings, from the analysis identified from VOC via toll road, which is more expensive than the arterial road. This has been caused by the distance reached if using the toll road and added the size of the tariff of the toll held by the users. The saving of the VOC will be a significant element from one appraisal in investing in a toll road, and this matter will be used as a basic policy for the government to invest in the transport sector.

  • Open Access

    A web-based booking system on freight movement (truck)

    by M. Ridwan Anas, Serena Yohana Ias

    The transport sector affects the fluctuation rate of productivity in one area. The transportation’s high cost and infrastructure condition have placed Indonesia’s logistic performance on the 46th rank out of 160 countries. One of the causes is the low utilization rate of the truck in Indonesia, which has been triggered by the uncertainty and the unequal distribution of demand of sending commodity which has made the truck service provider face the continued risk and the lack of capacity, which affects to the operational cost and the sending period. This paper will develop the web-based innovation booking system in ordering the truck to sort the algorithm insertion. Applying the insertion sort of the algorithm will minimalize the waiting time and loading/unloading, which can occur in the delivery process. The result of developing the web-based information system will simplify the customer or shipper in doing or tracking the order of the truck.

  • Open Access

    Utilization of Sinabung volcanic ash and lime as cement substitution materials in paving block manufacturer

    by Ika Puji Hastuty, Irwan Suranta Sembiring, Ridwan Anas

    Mount Sinabung is one of the active volcanoes in Indonesia located in Karo Regency, North Sumatra. Since the first eruption on August 27th, 2010, Mount Sinabung