Jun Zhang
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Jun Zhang has a total of 12 co-authors. Here are the top co-authors by number of shared publications:
- Binping Wu
State Key Laboratory of Hydraulic Engineering Simulation and Safety, Tianjin University, Tianjin 300350, China
2 shared publications Binping Wu
State Key Laboratory of Hydraulic Engineering Simulation and Safety, Tianjin University, Tianjin, China
1 shared publicationBo Cui
State Key Laboratory of Hydraulic Engineering Simulation and Safety, Tianjin University, Tianjin, China
1 shared publication- Dawei Tong
Tianjin University
1 shared publication Deng-Hua Zhong
The State Key Laboratory of Hydraulic Engineering Simulation and Safety, Tianjin University, Tianjin, China
1 shared publication- Denghua Zhong
State Key Laboratory of Hydraulic Engineering Simulation and Safety, Tianjin University, Tianjin, China
1 shared publication
Latest Publications
- Open Access
Adaptive Compaction Construction Simulation Based on Bayesian Field Theory
The compaction construction process is a critical operation in civil engineering projects. By establishing a construction simulation model, the compaction duration can be predicted to assist construction management. Existing studies have achieved adaptive modelling of input parameters from a Bayesian inference perspective, but usually assume the model as parametric distribution. Few studies adopt the nonparametric distribution to achieve robust inference, but still need to manually set hyper-parameters. In addition, the condition of when the roller stops moving ignores the impact of randomness of roller movement. In this paper, a new adaptive compaction construction simulation method is presented. The Bayesian field theory is innovatively adopted for input parameter adaptive modelling. Next, whether rollers have offset enough distance is used to determine the moment of stopping. Simulation experiments of the compaction process of a high earth dam project are demonstrated. The results indicate that the Bayesian field theory performs well in terms of accuracy and efficiency. When the size of roller speed dataset is 787,490, the Bayesian field theory costs only 1.54 s. The mean absolute error of predicted compaction duration reduces significantly with improved judgment condition. The proposed method can contribute to project resource planning, particularly in a high-frequency construction monitoring environment.
Open AccessAdaptive Compaction Construction Simulation Based on Bayesian Field Theory
The compaction construction process is a critical operation in civil engineering projects. By establishing a construction simulation model, the compaction duration can be predicted to assist construction management. Existing studies have achieved adaptive modelling of input parameters from a Bayesian inference perspective, but usually assume the model as parametric distribution. Few studies adopt the nonparametric distribution to achieve robust inference, but still need to manually set hyper-parameters. In addition, the condition of when the roller stops moving ignores the impact of randomness of roller movement. In this paper, a new adaptive compaction construction simulation method is presented. The Bayesian field theory is innovatively adopted for input parameter adaptive modelling. Next, whether rollers have offset enough distance is used to determine the moment of stopping. Simulation experiments of the compaction process of a high earth dam project are demonstrated. The results indicate that the Bayesian field theory performs well in terms of accuracy and efficiency. When the size of roller speed dataset is 787,490, the Bayesian field theory costs only 1.54 s. The mean absolute error of predicted compaction duration reduces significantly with improved judgment condition. The proposed method can contribute to project resource planning, particularly in a high-frequency construction monitoring environment.
- Open Access
- 15 December 2017
- Published by Elsevier in Computer-Aided Civil and Infrastructure Engineering
- Vol. 33 (6) , 459-480
Earth Dam Construction Simulation Considering Stochastic Rainfall Impact
- 15 December 2017
- Published by Elsevier in Computer-Aided Civil and Infrastructure Engineering
- Vol. 33 (6) , 459-480
Open AccessEarth Dam Construction Simulation Considering Stochastic Rainfall Impact
- 10 January 2017
- Published by Zhejiang University Press in Journal of Zhejiang University-SCIENCE A
- Vol. 18 (1) , 1-19
Dynamic time-cost-quality tradeoff of rockfill dam construction based on real-time monitoring
Time, cost, and quality are three key control factors in rockfill dam construction, and the tradeoff among them is important. Research has focused on the c
- 10 January 2017
- Published by Zhejiang University Press in Journal of Zhejiang University-SCIENCE A
- Vol. 18 (1) , 1-19
Dynamic time-cost-quality tradeoff of rockfill dam construction based on real-time monitoring
Time, cost, and quality are three key control factors in rockfill dam construction, and the tradeoff among them is important. Research has focused on the c