P. Devadas Manoharan
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
P. Devadas Manoharan has a total of 16 co-authors. Here are the top co-authors by number of shared publications:
- G. Muneeswaran
Anna University, Chennai, India
2 shared publications Rm. Senthamarai
2 shared publicationsS. Ramana Gopal
2 shared publicationsA. Chellappan
Structural Engineering Research Centre (SERC), Taramani, Chennai 600113, India
1 shared publication- Adeyemi Adesina
Department of Civil and Environmental Engineering, University of Windsor, Windsor, Canada
1 shared publication D. Gobinath
1 shared publication
Latest Publications
- 1 February 2021
- Published by Emerald Publishing in Civil Engineering
- Vol. 174 (1) , 43-47
Case studies on best practices in construction of long-span bridge projects in India
This paper describes the key challenges faced in three recent long-span bridge projects in India and explains how they were overcome through the application of novel construction methods. They include constructability changes in the precast works for the Barapullah elevated corridor phase 3 in New Delhi, a temporary bamboo pile jetty system for Bihar’s New Ganga Bridge project near Patna and a combined precast yard with a load-out facility for the Durgam Cheruvu Bridge in Hyderabad. The new approaches adopted in these case studies resulted in considerable cost and time savings compared with the original plans.
- 1 February 2021
- Published by Emerald Publishing in Civil Engineering
- Vol. 174 (1) , 43-47
Case studies on best practices in construction of long-span bridge projects in India
This paper describes the key challenges faced in three recent long-span bridge projects in India and explains how they were overcome through the application of novel construction methods. They include constructability changes in the precast works for the Barapullah elevated corridor phase 3 in New Delhi, a temporary bamboo pile jetty system for Bihar’s New Ganga Bridge project near Patna and a combined precast yard with a load-out facility for the Durgam Cheruvu Bridge in Hyderabad. The new approaches adopted in these case studies resulted in considerable cost and time savings compared with the original plans.
- 31 August 2018
- Published by Taylor & Francis in International Journal of Construction Management
- Vol. 20 (5) , 450-461
A statistical approach to assess the schedule delays and risks in Indian construction industry
Construction projects are highly complex and dynamic in nature. However, its dynamicity subjects it to several delays and risks; before, during and after construction. Therefore, it is paramount to identify the possible sources of delays and risks so as to prioritize them. This study used a literature review and perception of construction professionals in the Indian construction industries to assess and prioritize delays and risks. Statistical analysis using relative importance index and fuzzy ranking was employed to identify, assess, and prioritize delays and risks in the Indian construction industry context. Inadequate schedule was found to be the most critical risk, which constitutes a long-term problem in any construction projects. New risks were identified in the tendering stage. It is anticipated that the result of this study would be a guidebook for all stakeholders in the construction industry to assess and prevent any possible delay and risk in their construction processes.
- 31 August 2018
- Published by Taylor & Francis in International Journal of Construction Management
- Vol. 20 (5) , 450-461
A statistical approach to assess the schedule delays and risks in Indian construction industry
Construction projects are highly complex and dynamic in nature. However, its dynamicity subjects it to several delays and risks; before, during and after construction. Therefore, it is paramount to identify the possible sources of delays and risks so as to prioritize them. This study used a literature review and perception of construction professionals in the Indian construction industries to assess and prioritize delays and risks. Statistical analysis using relative importance index and fuzzy ranking was employed to identify, assess, and prioritize delays and risks in the Indian construction industry context. Inadequate schedule was found to be the most critical risk, which constitutes a long-term problem in any construction projects. New risks were identified in the tendering stage. It is anticipated that the result of this study would be a guidebook for all stakeholders in the construction industry to assess and prevent any possible delay and risk in their construction processes.
- 1 May 2011
- Published by Elsevier in Construction and Building Materials
- Vol. 25 (5) , 2413-2419
Concrete made from ceramic industry waste: Durability properties
- 1 May 2011
- Published by Elsevier in Construction and Building Materials
- Vol. 25 (5) , 2413-2419
Concrete made from ceramic industry waste: Durability properties
- 1 March 2010
- Published by Elsevier in Construction and Building Materials
- Vol. 24 (3) , 346-352
Diffusion characteristics of OPC concrete of various grades under accelerated test conditions
- 1 March 2010
- Published by Elsevier in Construction and Building Materials
- Vol. 24 (3) , 346-352
Diffusion characteristics of OPC concrete of various grades under accelerated test conditions
- 1 July 2008
- Published by Taylor & Francis
A design of automatic controller for seismic protection system of towers
- 1 July 2008
- Published by Taylor & Francis
A design of automatic controller for seismic protection system of towers
- 1 June 2006
- Published by American Society of Civil Engineers (ASCE) in Journal of Materials in Civil Engineering
- Vol. 18 (3) , 408-414
Investigations on the Static Behavior of Self-Compacting Concrete Under-Reamed Piles
Self-compacting concrete (SCC), a recent development, eliminates the need for internal or external vibration, as it freely flows in and around dense reinforcement and fills the mold completely without any blockages. SCC would be an ideal material for cast in situ piles, where compaction is infeasible. Six double under-reamed piles having a diameter of 250 mm and a length of 4 m , three made of SCC and three of conventionally vibrated cement concrete having similar strengths, were cast and tested to evaluate their static behavior in axial compression and tension (pullout). Later, all the piles were exhumed using suitable machinery to examine whether the pile shaft and bulbs had been well formed. Ultrasonic pulse velocity measurements were also taken on the exhumed piles along the length to evaluate the integrity of the concrete. Concrete cores of 75 mm diameter and 150 mm height taken from the pile shaft were tested for mechanical and durability related properties. The experimental study clearly demonstrat...
- 1 June 2006
- Published by American Society of Civil Engineers (ASCE) in Journal of Materials in Civil Engineering
- Vol. 18 (3) , 408-414
Investigations on the Static Behavior of Self-Compacting Concrete Under-Reamed Piles
Self-compacting concrete (SCC), a recent development, eliminates the need for internal or external vibration, as it freely flows in and around dense reinforcement and fills the mold completely without any blockages. SCC would be an ideal material for cast in situ piles, where compaction is infeasible. Six double under-reamed piles having a diameter of 250 mm and a length of 4 m , three made of SCC and three of conventionally vibrated cement concrete having similar strengths, were cast and tested to evaluate their static behavior in axial compression and tension (pullout). Later, all the piles were exhumed using suitable machinery to examine whether the pile shaft and bulbs had been well formed. Ultrasonic pulse velocity measurements were also taken on the exhumed piles along the length to evaluate the integrity of the concrete. Concrete cores of 75 mm diameter and 150 mm height taken from the pile shaft were tested for mechanical and durability related properties. The experimental study clearly demonstrat...
- 1 May 2006
- Published by Elsevier in Journal of Constructional Steel Research
- Vol. 62 (5) , 513-520
Experimental behaviour of eccentrically loaded slender circular hollow steel columns in-filled with fibre reinforced concrete
- 1 May 2006
- Published by Elsevier in Journal of Constructional Steel Research
- Vol. 62 (5) , 513-520
Experimental behaviour of eccentrically loaded slender circular hollow steel columns in-filled with fibre reinforced concrete
- 1 October 2005
- Published by Elsevier in Cement and Concrete Composites
- Vol. 27 (9-10) , 910-913
Concrete with ceramic waste aggregate
- 1 October 2005
- Published by Elsevier in Cement and Concrete Composites
- Vol. 27 (9-10) , 910-913
Concrete with ceramic waste aggregate
- 25 February 2004
- Published by Techno-Press in Steel and Composite Structures
- Vol. 4 (1) , 37-48
Tests on fiber reinforced concrete filled steel tubular columns
- 25 February 2004
- Published by Techno-Press in Steel and Composite Structures
- Vol. 4 (1) , 37-48
Tests on fiber reinforced concrete filled steel tubular columns
- 1 January 2003
- Published by Emerald Publishing
- p. 463-476
STUDIES ON PROPORTIONING OF SELF-COMPACTING CONCRETE AND EVALUATION OF ITS STRENGTH AND DURABILITY RELATED CHARACTERISTICS
- 1 January 2003
- Published by Emerald Publishing
- p. 463-476
STUDIES ON PROPORTIONING OF SELF-COMPACTING CONCRETE AND EVALUATION OF ITS STRENGTH AND DURABILITY RELATED CHARACTERISTICS