Alexei Selyukov
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Alexei Selyukov has a total of 9 co-authors. Here are the top co-authors by number of shared publications:
Andrey Gerasimov
A:1:{s:5:"ru_RU";s:12:"КузГТУ";
3 shared publicationsKirill Byrdin
T.F. Gorbachev Kuzbass State Technical University, Department of open pit mining, 650000 Kemerovo, 28 Vesennya st., Russia
2 shared publicationsA.J.S. (Sam) Spearing
School of Engineering & Technology, Central Queensland University, Rockhampton North, Bruce Highway, Rockhampton, QLD 4702, Australia
1 shared publication- Magerram Gasanov
School of Core Engineering Education, National Research Tomsk Polytechnic University, 30 Lenina St., 634050 Tomsk, Russia
1 shared publication Nuray Demirel
Middle East Technical University, Üniversiteler Mah., Dumlupınar Bulvarı, No: 1, 06800 Çankaya, Ankara, Turkey
1 shared publicationRadim Rybár
Technical University of Kosice, 04200 Letná 9, Kosice, Slovak republic
1 shared publication
Latest Publications
- Open Access
- 30 October 2024
- Published by National Research Tomsk Polytechnic University in Bulletin of the Tomsk Polytechnic University Geo Assets Engineering
- Vol. 335 (10) , 178-188
Block method of mining quarry fields as a tool to reduce environmental impact in conditions of intensification of production
Relevance. The intensification of open-pit mining in the coal basins of the Russian Federation is accompanied by an increase in negative impact on the environment. Directly in Kuzbass, the environment is exposed to the impact of the coal industry, especially when conducting open-pit mining using deep mining systems, with external dumping, which is accompanied by the withdrawal of a large amount of undisturbed land. The block method of mining quarry fields, well known in mining, has been rarely implemented in existing and planned quarry fields. The general line of its application is the lack of a unified approach to the design of block parameters, including environmental and economic assessment of the impact of this technological solution on the environment. Aim. Reduce environmental payments of mining enterprises with justified parameters of blocks for the development of quarry fields of promising inclined and steeply dipping coal deposits. Methods. Systematic generalization of the actual situation of mining operations in open-pit mines using the block method of mining quarry fields, the method of options and technical and economic modeling using spreadsheets. Results and conclusions. The authors have proposed the ecological and economic criteria for assessing the application of the block method of quarry field development. This allows us to study the patterns of change in environmental indicators. Using the example of the Krasnobrodskoe open-pit mine, the costs of environmental payments for the use of land resources, emissions and dusting are calculated for two options different from the design documentation. Based on the calculation results, the authors proved the efficiency of applying the block procedure for developing promising coal deposits, allowing us to reduce the costs for environmental impact by 22.5 and 63%, respectively, when changing the length of the initial block along the bottom from 2.2 to 1.4 km. From which it follows that the combined ecological and economic indicators allow us to fully assess the feasibility of applying the method for calculating block parameters, which is generally reflected in reduction in the costs for negative impact on the environment.
- 30 October 2024
- Published by National Research Tomsk Polytechnic University in Bulletin of the Tomsk Polytechnic University Geo Assets Engineering
- Vol. 335 (10) , 178-188
Open AccessBlock method of mining quarry fields as a tool to reduce environmental impact in conditions of intensification of production
Relevance. The intensification of open-pit mining in the coal basins of the Russian Federation is accompanied by an increase in negative impact on the environment. Directly in Kuzbass, the environment is exposed to the impact of the coal industry, especially when conducting open-pit mining using deep mining systems, with external dumping, which is accompanied by the withdrawal of a large amount of undisturbed land. The block method of mining quarry fields, well known in mining, has been rarely implemented in existing and planned quarry fields. The general line of its application is the lack of a unified approach to the design of block parameters, including environmental and economic assessment of the impact of this technological solution on the environment. Aim. Reduce environmental payments of mining enterprises with justified parameters of blocks for the development of quarry fields of promising inclined and steeply dipping coal deposits. Methods. Systematic generalization of the actual situation of mining operations in open-pit mines using the block method of mining quarry fields, the method of options and technical and economic modeling using spreadsheets. Results and conclusions. The authors have proposed the ecological and economic criteria for assessing the application of the block method of quarry field development. This allows us to study the patterns of change in environmental indicators. Using the example of the Krasnobrodskoe open-pit mine, the costs of environmental payments for the use of land resources, emissions and dusting are calculated for two options different from the design documentation. Based on the calculation results, the authors proved the efficiency of applying the block procedure for developing promising coal deposits, allowing us to reduce the costs for environmental impact by 22.5 and 63%, respectively, when changing the length of the initial block along the bottom from 2.2 to 1.4 km. From which it follows that the combined ecological and economic indicators allow us to fully assess the feasibility of applying the method for calculating block parameters, which is generally reflected in reduction in the costs for negative impact on the environment.
- Open Access
- 28 October 2021
- Published by EDP Sciences
- Vol. 315, 01015
Technological Adaptation of Internal Dumping to the Operating Mode of Open Pit when Developing Inclined and Steeply Dipping Coal Seams Strata
With surface mining of inclined and steeply dipping coal deposits, the so-called deeping longitudinal mining methods with a gradual deepening of mining from the surface to the final depth are widely spread, while orienting the mining front along the strike line of the seams (strata). When using such mining methods, the volumes of internal dumping are limited or completely absent; there is a peak-like increase in overburden volumes and transportation distance, the land resources disturbing proceeds at a progressive pace. In this regard, it is obvious that an important production task is to find technological solutions and methods to develop coal deposits that reduce the environmental hazard and increase resource conservation in mining by placing overburden in the mined-out space while reducing the area for external dumps and disturbing the earth's surface. If this is not foreseen at the present time, then all coal surface mines in the coming decades will be limited by their own external dumps of overburden, and their further development will be problematic.
- 28 October 2021
- Published by EDP Sciences
- Vol. 315, 01015
Open AccessTechnological Adaptation of Internal Dumping to the Operating Mode of Open Pit when Developing Inclined and Steeply Dipping Coal Seams Strata
With surface mining of inclined and steeply dipping coal deposits, the so-called deeping longitudinal mining methods with a gradual deepening of mining from the surface to the final depth are widely spread, while orienting the mining front along the strike line of the seams (strata). When using such mining methods, the volumes of internal dumping are limited or completely absent; there is a peak-like increase in overburden volumes and transportation distance, the land resources disturbing proceeds at a progressive pace. In this regard, it is obvious that an important production task is to find technological solutions and methods to develop coal deposits that reduce the environmental hazard and increase resource conservation in mining by placing overburden in the mined-out space while reducing the area for external dumps and disturbing the earth's surface. If this is not foreseen at the present time, then all coal surface mines in the coming decades will be limited by their own external dumps of overburden, and their further development will be problematic.
- Open Access
- 29 June 2021
- Published by EDP Sciences in E3S Web of Conferences
- Vol. 278, 01020
Management of Excess Mined-Out Space of Quarry Fields of Coal Open Pit Mines
Regardless of the applied technology of coal mining, a technogenic resource of the open pit is formed – excess mined-out space. Excessive mined-out space should be understood as a part of the internal space of a pit that is not used for placing overburden in dumps. The excess mined-out space in the plan is limited by the following: on the flanks of the quarry field and along the uprising by the limiting contour of the quarry, along the inclination – by the possible position of the slope of the dump layer, as close as possible to the working area. The lower boundary corresponds to the position of the formed dumps, the upper one – to the marks of the dominant relief. The article presents a method for reducing the excess mined-out space by means of the patterns of spatial development of objects “quarry field – dump of overburden”.
- 29 June 2021
- Published by EDP Sciences in E3S Web of Conferences
- Vol. 278, 01020
Open AccessManagement of Excess Mined-Out Space of Quarry Fields of Coal Open Pit Mines
Regardless of the applied technology of coal mining, a technogenic resource of the open pit is formed – excess mined-out space. Excessive mined-out space should be understood as a part of the internal space of a pit that is not used for placing overburden in dumps. The excess mined-out space in the plan is limited by the following: on the flanks of the quarry field and along the uprising by the limiting contour of the quarry, along the inclination – by the possible position of the slope of the dump layer, as close as possible to the working area. The lower boundary corresponds to the position of the formed dumps, the upper one – to the marks of the dominant relief. The article presents a method for reducing the excess mined-out space by means of the patterns of spatial development of objects “quarry field – dump of overburden”.
- Open Access
Parameters of Transition from Deepening Longitudinal to Continuous Lateral Surface Mining Methods to Decrease Environmental Damage in Coal Clusters
The present paper deals with an original way to reduce the environmental damage caused to land and air resources by surface coal mines with external dumping, due to the transition to internal dumping with filling the worked out space of the surface mine with overburden. The basic principle of the proposed idea is the transition from the deepening longitudinal mining method for the development of inclined and steep coal seam strata to lateral ones. This article substantiates the choice of technology for a block-and-layer continuous lateral mining method, including the construction of a first-stage pit, the use of a combined transport and direct dumping technology for moving overburden to an internal dump when mining blocks using draglines. The advantage of the presented technology, along with filling the internal capacity of the surface mine field with overburden, is the possibility of leveling the relief within the boundaries of the pit allotment and the implementation of reclamation as the mining front moves forward, without waiting for the dump to be completely filled in the boundary contours. Attention is also paid to the economic benefits of block-layer technology and the continuous lateral mining method, in the transition to which the overburden transporting costs can be significantly reduced, while the limitations of the proposed method’s implementation concern specific coal deposits that make up a small part of the fields being developed today by surface mining.
Open AccessParameters of Transition from Deepening Longitudinal to Continuous Lateral Surface Mining Methods to Decrease Environmental Damage in Coal Clusters
The present paper deals with an original way to reduce the environmental damage caused to land and air resources by surface coal mines with external dumping, due to the transition to internal dumping with filling the worked out space of the surface mine with overburden. The basic principle of the proposed idea is the transition from the deepening longitudinal mining method for the development of inclined and steep coal seam strata to lateral ones. This article substantiates the choice of technology for a block-and-layer continuous lateral mining method, including the construction of a first-stage pit, the use of a combined transport and direct dumping technology for moving overburden to an internal dump when mining blocks using draglines. The advantage of the presented technology, along with filling the internal capacity of the surface mine field with overburden, is the possibility of leveling the relief within the boundaries of the pit allotment and the implementation of reclamation as the mining front moves forward, without waiting for the dump to be completely filled in the boundary contours. Attention is also paid to the economic benefits of block-layer technology and the continuous lateral mining method, in the transition to which the overburden transporting costs can be significantly reduced, while the limitations of the proposed method’s implementation concern specific coal deposits that make up a small part of the fields being developed today by surface mining.
- Open Access
- 18 June 2020
- Published by EDP Sciences in E3S Web of Conferences
- Vol. 174, 01030
Passive Experiments for Monitoring Mining Operations by Dragline at Kuzbass Open Pits – Estimation of Coal Losses
The natural conditions for the formation of coal deposits in different regions of the globe are the same, all of them belong to reservoir sedimentary deposits and differ only in the degree of metamorphism and tectonic disturbances. In this regard, coal deposits of the Kuznetsk basin (Kuzbass, Western Siberia, Russia)) that have no analogues in nature are unique. Here are all sorts of options for the occurrence of coal seams both in terms of their thickness, dip angle, number, and the degree of disturbance by plicative and disjunctive disturbances. The article presents some results of research on ways to reduce coal losses in open pit mining during its extraction by draglines. The study was carried out on the example of deposits in Kemerovo region with coal seams in an inclined and steep formations, which allows analyzing the possibilities of applying the proposed technological solutions in the widest range of specific mining and geological conditions.
- 18 June 2020
- Published by EDP Sciences in E3S Web of Conferences
- Vol. 174, 01030
Open AccessPassive Experiments for Monitoring Mining Operations by Dragline at Kuzbass Open Pits – Estimation of Coal Losses
The natural conditions for the formation of coal deposits in different regions of the globe are the same, all of them belong to reservoir sedimentary deposits and differ only in the degree of metamorphism and tectonic disturbances. In this regard, coal deposits of the Kuznetsk basin (Kuzbass, Western Siberia, Russia)) that have no analogues in nature are unique. Here are all sorts of options for the occurrence of coal seams both in terms of their thickness, dip angle, number, and the degree of disturbance by plicative and disjunctive disturbances. The article presents some results of research on ways to reduce coal losses in open pit mining during its extraction by draglines. The study was carried out on the example of deposits in Kemerovo region with coal seams in an inclined and steep formations, which allows analyzing the possibilities of applying the proposed technological solutions in the widest range of specific mining and geological conditions.
- Open Access
- 18 June 2020
- Published by EDP Sciences in E3S Web of Conferences
- Vol. 174, 01020
The Results of Mining and Geometric Analysis in Open Pit Mining of Promising Kuzbass Coal Deposits with Block System
Currently, in developing the most inclined and steep coal deposits in the Central and Northern Kuzbass (Western Siberia, Russia), the deeping longitudinal open pit mining method is used with overburden rock moved to external dumps using transport technology. One of the ways to reduce the rate of land withdrawal while reducing development costs by shortening the distance of overburden movement is to use block lateral mining method with overburden storage in the worked out space. The paper emphasizes that well-known technological solutions consider quarry fields untouched by mining, or in the process of exploitation, so the block mining procedure is using fragmentally along with moving overburden by dump trucks. Internal dumping, as an element of land preservation, has not been generally considered to date. This is a deterrent to the implementation of resource-saving mining technologies, both in design and mining practice.
- 18 June 2020
- Published by EDP Sciences in E3S Web of Conferences
- Vol. 174, 01020
Open AccessThe Results of Mining and Geometric Analysis in Open Pit Mining of Promising Kuzbass Coal Deposits with Block System
Currently, in developing the most inclined and steep coal deposits in the Central and Northern Kuzbass (Western Siberia, Russia), the deeping longitudinal open pit mining method is used with overburden rock moved to external dumps using transport technology. One of the ways to reduce the rate of land withdrawal while reducing development costs by shortening the distance of overburden movement is to use block lateral mining method with overburden storage in the worked out space. The paper emphasizes that well-known technological solutions consider quarry fields untouched by mining, or in the process of exploitation, so the block mining procedure is using fragmentally along with moving overburden by dump trucks. Internal dumping, as an element of land preservation, has not been generally considered to date. This is a deterrent to the implementation of resource-saving mining technologies, both in design and mining practice.
- Open Access
- 28 November 2019
- Published by EDP Sciences in E3S Web of Conferences
- Vol. 134, 01018
Criteria for the difficulty of working out coal-bearing zones of quarry fields
Coal-bearing zones of open pit fields are represented by formations of coal seams from inclined to steep bedding with unstable thickness, both in dip and strike with different dip angles even within the same strata, with varying rock inter-layers and strength. In addition, most coal seams have a complex structure, including rock layers inside. In most cases, there is an uneven distribution of coal seams, and, consequently, coal reserves over the area of quarry fields. In this regard, for the analysis of quarry fields, there is a need to select criteria for assessing the complexity of coal-bearing zones for the purpose of systematizing them and choosing directions for constructing technological schemes for excavation and loading operations and mining methods.
- 28 November 2019
- Published by EDP Sciences in E3S Web of Conferences
- Vol. 134, 01018
Open AccessCriteria for the difficulty of working out coal-bearing zones of quarry fields
Coal-bearing zones of open pit fields are represented by formations of coal seams from inclined to steep bedding with unstable thickness, both in dip and strike with different dip angles even within the same strata, with varying rock inter-layers and strength. In addition, most coal seams have a complex structure, including rock layers inside. In most cases, there is an uneven distribution of coal seams, and, consequently, coal reserves over the area of quarry fields. In this regard, for the analysis of quarry fields, there is a need to select criteria for assessing the complexity of coal-bearing zones for the purpose of systematizing them and choosing directions for constructing technological schemes for excavation and loading operations and mining methods.
- Open Access
- 21 June 2019
- Published by EDP Sciences in E3S Web of Conferences
- Vol. 105, 01047
Justification of the Relationship of Production Capacity and the Parameters of the Blocks at Surface Mining of Existing Kuzbass Quarry Fields
Today, up to two-thirds of the world’s minerals are mined in an open, more economical way. However, at the same time, billions of tons of overburden are extracted, which are piled in the dumps, where they are polluted, lose their value and, in addition, reduce the quality of the environment. The possibility of industrial use of various rocks of from quarry field characterizes the complexity of minerals extracted by surface mining. Currently, there are no clear criteria for determining the size of blocks when designing enterprises for open pit mining. In most cases, when designing open pit mines, a quarry field is conventionally divided into several blocks, which does not always ensure the optimal production capacity of the mining enterprise due to the uneven distribution of reserves in the block contours. Because of that, during the transition from one block to another, a decrease in the production capacity of the enterprise can be noted. To avoid productivity decreasing, the precise analysis of the block parameters must be performed.
- 21 June 2019
- Published by EDP Sciences in E3S Web of Conferences
- Vol. 105, 01047
Open AccessJustification of the Relationship of Production Capacity and the Parameters of the Blocks at Surface Mining of Existing Kuzbass Quarry Fields
Today, up to two-thirds of the world’s minerals are mined in an open, more economical way. However, at the same time, billions of tons of overburden are extracted, which are piled in the dumps, where they are polluted, lose their value and, in addition, reduce the quality of the environment. The possibility of industrial use of various rocks of from quarry field characterizes the complexity of minerals extracted by surface mining. Currently, there are no clear criteria for determining the size of blocks when designing enterprises for open pit mining. In most cases, when designing open pit mines, a quarry field is conventionally divided into several blocks, which does not always ensure the optimal production capacity of the mining enterprise due to the uneven distribution of reserves in the block contours. Because of that, during the transition from one block to another, a decrease in the production capacity of the enterprise can be noted. To avoid productivity decreasing, the precise analysis of the block parameters must be performed.
- Open Access
- 21 June 2019
- Published by EDP Sciences in E3S Web of Conferences
- Vol. 105, 01043
Calculation of Boundary Stripping Ratio Errors at the Stage of Quarries Designing
The open pit mining method of solid minerals extracting is widely used both in Russia and in the whole world, and sets a general direction of mining industry development as its main tool, at least for the next decades. This is due to its significant advantages compared with other methods of minerals extraction, especially with underground method. This conclusion is made considering production capacity of mining and enrichment enterprises, mining safety, productivity and working conditions, investment and operating costs, level of mechanization, automation, robotization, informatization and computerization of production, full use of mineral resources. However, the practical realization of these advantages of the open pit method of mining, neutralization and reduction or elimination of its shortcomings (environmental damage) requires thorough and reliable design solutions, their timely and accurate adjustment, application of scientific methods and modern technical and technological means. This is especially important and relevant for design, construction, operation, reconstruction and reclamation of open pits developing complex and large deposits of scarce and valuable mineral resources. Erroneous and insufficiently substantiated design solutions and their implementation lead to a significant decrease in the efficiency of open pit mining.
- 21 June 2019
- Published by EDP Sciences in E3S Web of Conferences
- Vol. 105, 01043
Open AccessCalculation of Boundary Stripping Ratio Errors at the Stage of Quarries Designing
The open pit mining method of solid minerals extracting is widely used both in Russia and in the whole world, and sets a general direction of mining industry development as its main tool, at least for the next decades. This is due to its significant advantages compared with other methods of minerals extraction, especially with underground method. This conclusion is made considering production capacity of mining and enrichment enterprises, mining safety, productivity and working conditions, investment and operating costs, level of mechanization, automation, robotization, informatization and computerization of production, full use of mineral resources. However, the practical realization of these advantages of the open pit method of mining, neutralization and reduction or elimination of its shortcomings (environmental damage) requires thorough and reliable design solutions, their timely and accurate adjustment, application of scientific methods and modern technical and technological means. This is especially important and relevant for design, construction, operation, reconstruction and reclamation of open pits developing complex and large deposits of scarce and valuable mineral resources. Erroneous and insufficiently substantiated design solutions and their implementation lead to a significant decrease in the efficiency of open pit mining.