Hasse H. Neve
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Hasse H. Neve has a total of 13 co-authors. Here are the top co-authors by number of shared publications:
- Jon Lerche
Department of Business Development and Technology, Aarhus University, Herning, Denmark
8 shared publications - Søren Wandahl
Aarhus univ
6 shared publications - Jochen Teizer
Technical University of Denmark
4 shared publications - Søren Munch Lindhard
Department of the Built Environment, Aalborg University
4 shared publications - Peter Enevoldsen
Centre for Energy Technologies, Aarhus University, Denmark
3 shared publications - Allan Gross
Department of Business Development and Technology, Aarhus University, Aarhus, Denmark
2 shared publications
Latest Publications
- 9 February 2022
- Published by Taylor & Francis in Production Planning & Control
- Vol. 34 (15) , 1513-1526
Causes of delay in offshore wind turbine construction projects
This research investigated the causes of delays in offshore wind projects, categorizing, and ranking these factors using statistical analysis. The study presented was based on the analysis of 208,140 historical data points from seven different cases, investigating both the onshore and offshore on-site assembly locations. The findings revealed that the dominant delay factor is ‘planning’ at the onshore assembly location and ‘previous task’ at the offshore assembly location. This challenges the current perception that weather is the dominant cause of delay in offshore wind projects. This analysis and its results categorize and rank delay factors between on-site assembly locations, proffering a better understanding and insights into this domain. This is relevant to both academics and practitioners, not only in on- and off-shore wind projects but also in other project types handling remote or multiple assembly locations.
- 9 February 2022
- Published by Taylor & Francis in Production Planning & Control
- Vol. 34 (15) , 1513-1526
Causes of delay in offshore wind turbine construction projects
This research investigated the causes of delays in offshore wind projects, categorizing, and ranking these factors using statistical analysis. The study presented was based on the analysis of 208,140 historical data points from seven different cases, investigating both the onshore and offshore on-site assembly locations. The findings revealed that the dominant delay factor is ‘planning’ at the onshore assembly location and ‘previous task’ at the offshore assembly location. This challenges the current perception that weather is the dominant cause of delay in offshore wind projects. This analysis and its results categorize and rank delay factors between on-site assembly locations, proffering a better understanding and insights into this domain. This is relevant to both academics and practitioners, not only in on- and off-shore wind projects but also in other project types handling remote or multiple assembly locations.
- Open Access
- 26 January 2022
- Published by Elsevier in Renewable and Sustainable Energy Reviews
- Vol. 158
The impact of COVID -19 on offshore wind project productivity – A case study
- 26 January 2022
- Published by Elsevier in Renewable and Sustainable Energy Reviews
- Vol. 158
Open AccessThe impact of COVID -19 on offshore wind project productivity – A case study
- Open Access
- 1 January 2022
- Published by Elsevier in Energy Strategy Reviews
- Vol. 39
What can be learned from variability in offshore wind projects
- 1 January 2022
- Published by Elsevier in Energy Strategy Reviews
- Vol. 39
Open AccessWhat can be learned from variability in offshore wind projects
- Open Access
- 9 November 2020
- Published by Taylor & Francis in Production Planning & Control
- Vol. 33 (8) , 790-802
Learning to see value-adding and non-value-adding work time in renovation production systems
For decades construction labour productivity has been stagnated or declining. Changing this issue requires new knowledge on the labour-intensive construction production system. The work sampling method was applied to collect data from three renovation construction production systems. It quantifies observations of on-site work and enables deep analyses of how time is used. The analysis revealed that the renovation projects had a baseline of value-adding-work (VAW) time on 29.5%. It further identified five system behaviours outlining how VAW and Non-Value-Adding work (NVAW) time behaves. The new knowledge of how both VAW and NVAW time behaves advances knowledge on how time is wasted in construction projects and opens new branches of future research. The findings are furthermore of potential use to industry professionals who work with process improvement in renovation projects because they provide, among others, answers to how targets can be defined for both VAW and NVAW.
- 9 November 2020
- Published by Taylor & Francis in Production Planning & Control
- Vol. 33 (8) , 790-802
Open AccessLearning to see value-adding and non-value-adding work time in renovation production systems
For decades construction labour productivity has been stagnated or declining. Changing this issue requires new knowledge on the labour-intensive construction production system. The work sampling method was applied to collect data from three renovation construction production systems. It quantifies observations of on-site work and enables deep analyses of how time is used. The analysis revealed that the renovation projects had a baseline of value-adding-work (VAW) time on 29.5%. It further identified five system behaviours outlining how VAW and Non-Value-Adding work (NVAW) time behaves. The new knowledge of how both VAW and NVAW time behaves advances knowledge on how time is wasted in construction projects and opens new branches of future research. The findings are furthermore of potential use to industry professionals who work with process improvement in renovation projects because they provide, among others, answers to how targets can be defined for both VAW and NVAW.
- 1 November 2020
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 146 (11) , 05020015
Application of Last Planner System to Modular Offshore Wind Construction
The focus of this study is the applicability of the Last Planner System (LPS) to modular offshore wind construction. Following a design science approach, a conceptual model for LPS adapted to modular offshore wind construction was developed, then refined and evaluated in a field study. The field study investigated was an offshore wind project in the Belgian part of the North Sea. Theoretical knowledge from academics as well as practical experience from field experts allowed adjusting LPS to the context of modular offshore wind construction. The case study organization participated in artifact development and evaluated its utility through implementation. Implementation of the developed artifact reduced the project duration by 21% compared to the as-planned original critical path method (CPM) schedule. Because offshore wind projects have tended to substantially overrun their scheduled durations, 21% may understate the actual improvement. Compared to current installation time within the industry, the project made a 36% reduction, measured by average installation time per megawatt. The developed LPS artifact contributes to the body of knowledge by adaptation of LPS to modular construction, and the evaluation shows its usefulness in the context of modular offshore wind construction.
- 1 November 2020
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 146 (11) , 05020015
Application of Last Planner System to Modular Offshore Wind Construction
The focus of this study is the applicability of the Last Planner System (LPS) to modular offshore wind construction. Following a design science approach, a conceptual model for LPS adapted to modular offshore wind construction was developed, then refined and evaluated in a field study. The field study investigated was an offshore wind project in the Belgian part of the North Sea. Theoretical knowledge from academics as well as practical experience from field experts allowed adjusting LPS to the context of modular offshore wind construction. The case study organization participated in artifact development and evaluated its utility through implementation. Implementation of the developed artifact reduced the project duration by 21% compared to the as-planned original critical path method (CPM) schedule. Because offshore wind projects have tended to substantially overrun their scheduled durations, 21% may understate the actual improvement. Compared to current installation time within the industry, the project made a 36% reduction, measured by average installation time per megawatt. The developed LPS artifact contributes to the body of knowledge by adaptation of LPS to modular construction, and the evaluation shows its usefulness in the context of modular offshore wind construction.
- 1 September 2020
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 146 (9) , 04020110
Determining the Relationship between Direct Work and Construction Labor Productivity in North America: Four Decades of Insights
Labor productivity in construction has fallen behind other industries in most of the world and has declined continuously for decades in the United States. To change this, the construction industry needs to know where to focus. This research aims to show how important craftsmen efficiency is for national construction labor productivity (CLP) development. Statistical analysis was used to compare craftsmen efficiency and CLP data from North America (NA) in the period 1972–2010. Craftsmen efficiency data were extracted from published work that measured direct work (DW) through work sampling, and CLP data were extracted from national databases. A statistically significant relationship between DW and CLP was established. This revealed that adding 36 s of DW to every work hour could yield a yearly return of 5.4 billion USD to the NA gross domestic product (GDP). Results show that more focus on activity and project level efficiency is crucial for changing the trends of national CLP. Industry leaders and policy makers now have a solid foundation for taking corrective actions for an industry plagued by low productivity.
- 1 September 2020
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 146 (9) , 04020110
Determining the Relationship between Direct Work and Construction Labor Productivity in North America: Four Decades of Insights
Labor productivity in construction has fallen behind other industries in most of the world and has declined continuously for decades in the United States. To change this, the construction industry needs to know where to focus. This research aims to show how important craftsmen efficiency is for national construction labor productivity (CLP) development. Statistical analysis was used to compare craftsmen efficiency and CLP data from North America (NA) in the period 1972–2010. Craftsmen efficiency data were extracted from published work that measured direct work (DW) through work sampling, and CLP data were extracted from national databases. A statistically significant relationship between DW and CLP was established. This revealed that adding 36 s of DW to every work hour could yield a yearly return of 5.4 billion USD to the NA gross domestic product (GDP). Results show that more focus on activity and project level efficiency is crucial for changing the trends of national CLP. Industry leaders and policy makers now have a solid foundation for taking corrective actions for an industry plagued by low productivity.
- 4 March 2020
- Published by Springer Nature
- p. 459-470
Feedback Loop—The Missing Link in Activity Analysis
- 4 March 2020
- Published by Springer Nature
- p. 459-470
Feedback Loop—The Missing Link in Activity Analysis
- Open Access
- 1 January 2020
- Published by Engineering, Project, and Production Management (EPPM) in Journal of Engineering, Project, and Production Management
- Vol. 10 (1) , 64-70
Continuous Improvements at Operator Level
Few empirical studies have previously reported on the implementation of takt planning and utilizing Deming cycles (PDCA) to control construction workflows continuously. This paper presents a case study from the offshore renewable industry, closely related to construction. The paper aims to develop and evaluate a conceptual model combining takt planning and the Deming cycle within the offshore wind construction environment. The conceptual model has through interactions with construction experts been modified for a visual board implementation, covering two alternative processes with a fixed number of technicians per performing team. The knowledge base for the conceptual model is based on Takt planning implementation from the lean construction community and PDCA implementation from the lean production community. The main contribution of this paper is the development and evaluation of the conceptual model combining takt planning and the Deming cycle in a construction environment. This conceptual model has potential implications in the construction and refurbishment industry.
- 1 January 2020
- Published by Engineering, Project, and Production Management (EPPM) in Journal of Engineering, Project, and Production Management
- Vol. 10 (1) , 64-70
Open AccessContinuous Improvements at Operator Level
Few empirical studies have previously reported on the implementation of takt planning and utilizing Deming cycles (PDCA) to control construction workflows continuously. This paper presents a case study from the offshore renewable industry, closely related to construction. The paper aims to develop and evaluate a conceptual model combining takt planning and the Deming cycle within the offshore wind construction environment. The conceptual model has through interactions with construction experts been modified for a visual board implementation, covering two alternative processes with a fixed number of technicians per performing team. The knowledge base for the conceptual model is based on Takt planning implementation from the lean construction community and PDCA implementation from the lean production community. The main contribution of this paper is the development and evaluation of the conceptual model combining takt planning and the Deming cycle in a construction environment. This conceptual model has potential implications in the construction and refurbishment industry.