Fathi Boukadi
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Fathi Boukadi has a total of 8 co-authors. Here are the top co-authors by number of shared publications:
D. Allen
University of Louisiana at Lafayette, Lafayette, LA 70506
1 shared publicationF. Sebring
University of Louisiana at Lafayette, Lafayette, LA 70506
1 shared publication- Jalel Ben Hmida
Department of Mechanical Engineering, University of Louisiana at Lafayette, Lafayette, LA 70504, USA
1 shared publication - Jim Lee
College of Business, Texas A&M University-Corpus Christi, Corpus Christi, TX 78412, USA
1 shared publication R. Trabelsi
University of Louisiana at Lafayette, Lafayette, LA 70506
1 shared publicationV. Pai
Superior Energy, Lafayette, LA 70508
1 shared publication
Latest Publications
- Open Access
- 1 January 2014
- Published by Taylor & Francis in Production & Manufacturing Research
- Vol. 2 (1) , 95-111
Production scheduling for continuous manufacturing systems with quality constraints
This research is motivated by a real world production scheduling problem in a continuous manufacturing system involving multiple objectives, multiple products and multiple processing lines with various inventory, production and quality constraints. Because of the conflicting objectives, a global optimization approach is considered as not feasible by the plant management. Given a customer demand forecast, two practical heuristic or sequential optimization algorithms are developed to generate daily production schedules for two primary objectives: minimize shipment delays (pull-backward procedure) and minimize average inventory levels (push-forward procedure). A third heuristic algorithm (reduce switch-over procedure) which is based on the current management practice is also developed to serve as a benchmark. A factorial experiment was performed to evaluate the performance of the heuristic procedures and to identify factors that might affect the performance differences among heuristics. Since each heuristic is designed to give priority to one of the three conflicting objectives, none of them is absolutely superior to the other algorithms in all aspects. However, the first two heuristic procedures performed better than the current management practice in shipment delays and average daily inventory. The production schedules generated by the two procedures also satisfy the quality constraints. The experimental results also showed that the performance of the algorithms is significantly affected by product mix, inventory levels, and demand pattern.
- 1 January 2014
- Published by Taylor & Francis in Production & Manufacturing Research
- Vol. 2 (1) , 95-111
Open AccessProduction scheduling for continuous manufacturing systems with quality constraints
This research is motivated by a real world production scheduling problem in a continuous manufacturing system involving multiple objectives, multiple products and multiple processing lines with various inventory, production and quality constraints. Because of the conflicting objectives, a global optimization approach is considered as not feasible by the plant management. Given a customer demand forecast, two practical heuristic or sequential optimization algorithms are developed to generate daily production schedules for two primary objectives: minimize shipment delays (pull-backward procedure) and minimize average inventory levels (push-forward procedure). A third heuristic algorithm (reduce switch-over procedure) which is based on the current management practice is also developed to serve as a benchmark. A factorial experiment was performed to evaluate the performance of the heuristic procedures and to identify factors that might affect the performance differences among heuristics. Since each heuristic is designed to give priority to one of the three conflicting objectives, none of them is absolutely superior to the other algorithms in all aspects. However, the first two heuristic procedures performed better than the current management practice in shipment delays and average daily inventory. The production schedules generated by the two procedures also satisfy the quality constraints. The experimental results also showed that the performance of the algorithms is significantly affected by product mix, inventory levels, and demand pattern.
- Open Access
- 29 November 2012
- Published by Wiley in Modelling and Simulation in Engineering
- Vol. 2012, 1-4
Appropriate Separator Sizing: A Modified Stewart and Arnold Method
Oil and gas separators were one of the first pieces of production equipment to be used in the petroleum industry. The different stages of separation are completed using the following three principles: gravity, centrifugal force, and impingement. The sizes of the oil droplets, in the production water, are based mainly on the choke valve pressure drop. The choke valve pressure drop creates a shearing effect; this reduces the ability of the droplets to combine. One of the goals of oil separation is to reduce the shearing effect of the choke. Separators are conventionally designed based on initial flow rates; as a result, the separator is no longer able to accommodate totality of produced fluids. Changing fluid flow rates as well as emulsion viscosity effect separator design. The reduction in vessel performance results in recorded measurements that do not match actual production levels inducing doubt into any history matching process and distorting reservoir management programs. In this paper, the new model takes into account flow rates and emulsion viscosity. The generated vessel length, vessel diameter, and slenderness ratio monographs are used to select appropriate separator size based on required retention time. Model results are compared to API 12J standards.
- 29 November 2012
- Published by Wiley in Modelling and Simulation in Engineering
- Vol. 2012, 1-4
Open AccessAppropriate Separator Sizing: A Modified Stewart and Arnold Method
Oil and gas separators were one of the first pieces of production equipment to be used in the petroleum industry. The different stages of separation are completed using the following three principles: gravity, centrifugal force, and impingement. The sizes of the oil droplets, in the production water, are based mainly on the choke valve pressure drop. The choke valve pressure drop creates a shearing effect; this reduces the ability of the droplets to combine. One of the goals of oil separation is to reduce the shearing effect of the choke. Separators are conventionally designed based on initial flow rates; as a result, the separator is no longer able to accommodate totality of produced fluids. Changing fluid flow rates as well as emulsion viscosity effect separator design. The reduction in vessel performance results in recorded measurements that do not match actual production levels inducing doubt into any history matching process and distorting reservoir management programs. In this paper, the new model takes into account flow rates and emulsion viscosity. The generated vessel length, vessel diameter, and slenderness ratio monographs are used to select appropriate separator size based on required retention time. Model results are compared to API 12J standards.