Suprakash Gupta
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Suprakash Gupta has a total of 2 co-authors. Here are the top co-authors by number of shared publications:
- Jayanta Bhattacharya
Former Professor, Department of Mining Engineering, Indian Institute of Kharagpur, Kharagpur - 721302, West Bengal
2 shared publications Uday Kumar
Division of Operation and Maintenance Engineering , Luleå University of Technology , SE–97187 , Luleå , Sweden
1 shared publication
Latest Publications
- 1 May 2012
- Published by Taylor & Francis in International Journal of Mining, Reclamation and Environment
- Vol. 26 (4) , 324-336
An analytical hierarchy process (AHP)-guided decision model for underground mining method selection
Decision making in mining, especially the selection of an appropriate stoping method for an ore deposit, is a critical and challenging task owing to its compliance with a set of criteria. The lack of quantitative data and the qualitative nature of the task forces one to adopt an experience- and intuition -based technique like the analytical hierarchy process (AHP). This article examines the application of the AHP for the selection of an appropriate stoping method from a group of alternatives. The developed model has been verified by a number of case studies.
- 1 May 2012
- Published by Taylor & Francis in International Journal of Mining, Reclamation and Environment
- Vol. 26 (4) , 324-336
An analytical hierarchy process (AHP)-guided decision model for underground mining method selection
Decision making in mining, especially the selection of an appropriate stoping method for an ore deposit, is a critical and challenging task owing to its compliance with a set of criteria. The lack of quantitative data and the qualitative nature of the task forces one to adopt an experience- and intuition -based technique like the analytical hierarchy process (AHP). This article examines the application of the AHP for the selection of an appropriate stoping method from a group of alternatives. The developed model has been verified by a number of case studies.
- 1 June 2007
- Published by Taylor & Francis in Safety and Reliability
- Vol. 27 (3) , 36-52
Cost-effective indicator—a tool for resource prioritization
For a long time now different importance measures are put to use in reliability literature for ranking events of a fault tree (FT). Commonly used importance measures accounts only the probability of occurrence of faults in the system and ignore the effect or severity of failures which is an important factor in engineering decision making. Here a new approach is proposed by evaluating an indicator, called cost-effective indicator (CEI) that accounts both the component's performance and economic aspects. The CEI is useful in production systems where operational reliability and cost of break down are paramount. Basic componente/events in an FT are ranked as per the decreasing value of this indicator to indicate the favourable area for improvement. It is observed in the analysis that CEI can be a handy and effective tool for inspection, maintenance and failure detection and these activities can be carried out as per the rank of the components. Upgradation of system's performance can also be done by improving components with relatively large CEI values.
- 1 June 2007
- Published by Taylor & Francis in Safety and Reliability
- Vol. 27 (3) , 36-52
Cost-effective indicator—a tool for resource prioritization
For a long time now different importance measures are put to use in reliability literature for ranking events of a fault tree (FT). Commonly used importance measures accounts only the probability of occurrence of faults in the system and ignore the effect or severity of failures which is an important factor in engineering decision making. Here a new approach is proposed by evaluating an indicator, called cost-effective indicator (CEI) that accounts both the component's performance and economic aspects. The CEI is useful in production systems where operational reliability and cost of break down are paramount. Basic componente/events in an FT are ranked as per the decreasing value of this indicator to indicate the favourable area for improvement. It is observed in the analysis that CEI can be a handy and effective tool for inspection, maintenance and failure detection and these activities can be carried out as per the rank of the components. Upgradation of system's performance can also be done by improving components with relatively large CEI values.
- 7 November 2006
- Published by Wiley in Quality and Reliability Engineering International
- Vol. 23 (7) , 867-882
Reliability Analysis of a conveyor system using hybrid data
The quantification of a fault tree is difficult without an exact probability value for all of the basic events of the tree. To overcome this difficulty in this paper, we propose a methodology which employs ‘hybrid data’ as a tool to analyse the fault tree. The proposed methodology estimates the failure probability of basic events using the statistical analysis of field recorded failures. Under these circumstances, where there is an absence of past failure records, the method follows a fuzzy set based theoretical evaluation based on the subjective judgement of experts for the failure interval. The proposed methodology has been applied to a conveyor system. The results of the analysis reveal the effectiveness of the proposed methodology and the instrumental role played by the experience of experts in providing reliability oriented information. Copyright © 2006 John Wiley & Sons, Ltd.
- 7 November 2006
- Published by Wiley in Quality and Reliability Engineering International
- Vol. 23 (7) , 867-882
Reliability Analysis of a conveyor system using hybrid data
The quantification of a fault tree is difficult without an exact probability value for all of the basic events of the tree. To overcome this difficulty in this paper, we propose a methodology which employs ‘hybrid data’ as a tool to analyse the fault tree. The proposed methodology estimates the failure probability of basic events using the statistical analysis of field recorded failures. Under these circumstances, where there is an absence of past failure records, the method follows a fuzzy set based theoretical evaluation based on the subjective judgement of experts for the failure interval. The proposed methodology has been applied to a conveyor system. The results of the analysis reveal the effectiveness of the proposed methodology and the instrumental role played by the experience of experts in providing reliability oriented information. Copyright © 2006 John Wiley & Sons, Ltd.