Guillermo Ramirez
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Guillermo Ramirez has a total of 14 co-authors. Here are the top co-authors by number of shared publications:
- Paul H. Ziehl
Associate Professor, Dept. of Civil and Environmental Engineering, Univ. of South Carolina, 300 Main St., Columbia, SC 29208
2 shared publications - Timothy J. Fowler
Department of Civil Engineering, Ferguson Structural Engineering Laboratory, University of Texas at Austin, 10100 Burnet Road, Building No. 177, Austin, TX 78731
2 shared publications - Brent Keil
Corporate Chief Engineer, Northwest Pipe Company, 5721 SE Columbia Way, Suite 200, Vancouver, WA 98661
1 shared publication - Glenn Davidenko
Multisite Engineering Manager, Northwest Pipe Company, 351 Longhorn Rd., Saginaw, TX 76179
1 shared publication - J. P. Jones
Bridge Design Engineer, Texas Department of Transportation, Bridge Division, Formerly, Doctoral Candidate, University of Kansas
1 shared publication - Michael D. Engelhardt
Ferguson Structural Engineering Laboratory, Dept. of Civil, Architectural and Environmental Eng., Univ. of Texas at Austin, 10100 Burnet Road, Building 177, Austin, Texas 78758 USA
1 shared publication
Latest Publications
- 28 July 2011
- Published by American Society of Civil Engineers (ASCE)
- p. 864-871
Analysis and Testing of a Prototype Jointing System for Bar-Wrapped Steel Cylinder Concrete Pressure Pipe
Northwest Pipe Company is a manufacturer of both steel pipe and bar-wrapped steel-cylinder concrete pressure pipe. While there are similarities between the two pipe materials, the AWWA C303 standard for bar-wrapped concrete pipe does not currently allow the Rolled Groove gasket joint, a rubber sealing system widely used in steel pipes manufactured with complete-penetration butt welded seams per AWWA C200. In an effort to study the viability of including the Rolled Groove joint into Bar-wrapped concrete pipe, the services of researchers from the University of Texas at Arlington were retained to aid with design and analysis of a prototype joint, S303TM. Additionally, full scale tests on a 54-inch S303 prototype joint were conducted to verify its ability to perform to established acceptance criteria. This paper presents discussions on the Finite Element Modeling (FEM) and the full scale testing.
- 28 July 2011
- Published by American Society of Civil Engineers (ASCE)
- p. 864-871
Analysis and Testing of a Prototype Jointing System for Bar-Wrapped Steel Cylinder Concrete Pressure Pipe
Northwest Pipe Company is a manufacturer of both steel pipe and bar-wrapped steel-cylinder concrete pressure pipe. While there are similarities between the two pipe materials, the AWWA C303 standard for bar-wrapped concrete pipe does not currently allow the Rolled Groove gasket joint, a rubber sealing system widely used in steel pipes manufactured with complete-penetration butt welded seams per AWWA C200. In an effort to study the viability of including the Rolled Groove joint into Bar-wrapped concrete pipe, the services of researchers from the University of Texas at Arlington were retained to aid with design and analysis of a prototype joint, S303TM. Additionally, full scale tests on a 54-inch S303 prototype joint were conducted to verify its ability to perform to established acceptance criteria. This paper presents discussions on the Finite Element Modeling (FEM) and the full scale testing.
- 13 April 2011
- Published by American Society of Civil Engineers (ASCE)
- p. 145-151
Fatigue Repair of the Arkansas River Bridge
Since the Kansas Department of Transportation (KDOT) started its fracture critical bridge inspection program around the mid-1980s, many welded steel bridge details at the diaphragm (or floorbeam) to girder connections were found to have developed fatigue cracks, often due to the cause of out-of-plane distortion. While proper fatigue design philosophy has been developed and incorporated into the current AASHTO bridge design specifications, repair of existing bridges with fatigue cracking remains a challenge to the bridge engineering community, especially when the repair details happen to reside in locations with geometrical complexity, or when cracking is compounded by corrosion or impact damage. Beginning 1996, a series of research studies were performed through the collaborative effort between the KDOT State Bridge Office and the University of Kansas (KU). Five candidate structures were selected to examine the overall fatigue problem experienced by the KDOT steel bridges, using state-of-art finite element (FE) modeling technique. Two of these five bridges were then strain gauged, both before and after the repair, to ensure that the fatigue details were eliminated and the chosen repair method was effective. This paper discusses the research and repair findings of the first case study sponsored by KDOT, the Arkansas River Bridge.
- 13 April 2011
- Published by American Society of Civil Engineers (ASCE)
- p. 145-151
Fatigue Repair of the Arkansas River Bridge
Since the Kansas Department of Transportation (KDOT) started its fracture critical bridge inspection program around the mid-1980s, many welded steel bridge details at the diaphragm (or floorbeam) to girder connections were found to have developed fatigue cracks, often due to the cause of out-of-plane distortion. While proper fatigue design philosophy has been developed and incorporated into the current AASHTO bridge design specifications, repair of existing bridges with fatigue cracking remains a challenge to the bridge engineering community, especially when the repair details happen to reside in locations with geometrical complexity, or when cracking is compounded by corrosion or impact damage. Beginning 1996, a series of research studies were performed through the collaborative effort between the KDOT State Bridge Office and the University of Kansas (KU). Five candidate structures were selected to examine the overall fatigue problem experienced by the KDOT steel bridges, using state-of-art finite element (FE) modeling technique. Two of these five bridges were then strain gauged, both before and after the repair, to ensure that the fatigue details were eliminated and the chosen repair method was effective. This paper discusses the research and repair findings of the first case study sponsored by KDOT, the Arkansas River Bridge.
- 28 July 2009
- Published by ASME International in Journal of Pressure Vessel Technology
- Vol. 131 (5) , 051205
Experimental Investigation of a Large-Scale Composite Riser Tube Under External Pressure
A collapse pressure test was conducted on a full-scale diameter prototype composite offshore drilling riser. The test specimen was a carbon fiber-epoxy filament-wound tube, approximately 56.4 cm outside diameter and 3.05 cm wall thickness. The tube was subjected to external water pressure up to collapse. The purpose of the test was to confirm the external pressure capacity of the specimen and to provide a basis for verification and calibration of analytical estimates of the collapse pressure of large scale carbon fiber tubes. The specimen was instrumented with strain gauges on both the outside and inside walls of the tube. This paper describes the test specimen and presents key results of the test.
- 28 July 2009
- Published by ASME International in Journal of Pressure Vessel Technology
- Vol. 131 (5) , 051205
Experimental Investigation of a Large-Scale Composite Riser Tube Under External Pressure
A collapse pressure test was conducted on a full-scale diameter prototype composite offshore drilling riser. The test specimen was a carbon fiber-epoxy filament-wound tube, approximately 56.4 cm outside diameter and 3.05 cm wall thickness. The tube was subjected to external water pressure up to collapse. The purpose of the test was to confirm the external pressure capacity of the specimen and to provide a basis for verification and calibration of analytical estimates of the collapse pressure of large scale carbon fiber tubes. The specimen was instrumented with strain gauges on both the outside and inside walls of the tube. This paper describes the test specimen and presents key results of the test.
- 24 July 2009
- Published by ASME International in Journal of Pressure Vessel Technology
- Vol. 131 (5) , 051401
Influence of Elevated Temperature on the Acoustic Emission Evaluation of FRP Vessels Through Internal Fluid Pressure Tests
A research program evaluating the effect of elevated temperature in the acoustic emission testing of fiberglass vessels was completed recently. The program aimed at evaluating the current ASME provisions that require acoustic emission testing for Class II vessels be carried out at operating temperature in the event that the operating temperature exceeds (). Lack of data from fiber reinforced polymer vessels and/or components that have been subjected to acoustic emission evaluation at elevated temperature has resulted in speculation regarding the appropriateness of conducting the acoustic emission evaluation at elevated temperature. To address these issues, an experimental investigation was conducted on representative coupon specimens and pressurized cylindrical specimens at differing temperatures. The results from the coupon tests were presented in a previous publication. This paper will present the results of the cylindrical specimens and compare them to the coupon specimens drawing the final conclusions from the overall results of the program. The results from this study resulted in changes in the body of the ASME code for testing pressure vessels with acoustic emission at temperature.- 24 July 2009
- Published by ASME International in Journal of Pressure Vessel Technology
- Vol. 131 (5) , 051401
Influence of Elevated Temperature on the Acoustic Emission Evaluation of FRP Vessels Through Internal Fluid Pressure Tests
A research program evaluating the effect of elevated temperature in the acoustic emission testing of fiberglass vessels was completed recently. The program aimed at evaluating the current ASME provisions that require acoustic emission testing for Class II vessels be carried out at operating temperature in the event that the operating temperature exceeds (). Lack of data from fiber reinforced polymer vessels and/or components that have been subjected to acoustic emission evaluation at elevated temperature has resulted in speculation regarding the appropriateness of conducting the acoustic emission evaluation at elevated temperature. To address these issues, an experimental investigation was conducted on representative coupon specimens and pressurized cylindrical specimens at differing temperatures. The results from the coupon tests were presented in a previous publication. This paper will present the results of the cylindrical specimens and compare them to the coupon specimens drawing the final conclusions from the overall results of the program. The results from this study resulted in changes in the body of the ASME code for testing pressure vessels with acoustic emission at temperature.- 14 January 2009
- Published by Taylor & Francis in Research in Nondestructive Evaluation
- Vol. 20 (1) , 32-50
Nondestructive Evaluation of Full-Scale FRP Bridge Beams Prior to Construction
Two innovative hybrid bridges having conventional reinforced concrete slabs combined with fiber-reinforced polymer (FRP) beams have been designed and built in the Corpus Christi District. The first structure had two spans each of 30 feet and the second structure length is 50 feet; the width of each bridge is 32 feet. The first hybrid structure was designed by researchers at the University of Texas at Austin working closely with Texas Department of Transportation (TxDOT) and the second was designed by researchers at the University of Texas in Arlington and the University of South Carolina. For both bridge structures, beams were nondestructively evaluated at the manufacturing facility using Acoustic Emission (AE) as the primary evaluation method. This article presents a description of the structures and the methods and results of the nondestructive evaluation (NDE). AE testing proved to be a useful tool for helping to establish the fitness for service of the FRP beams prior to implementation and for identifying areas requiring special attention during the quality assurance phase.
- 14 January 2009
- Published by Taylor & Francis in Research in Nondestructive Evaluation
- Vol. 20 (1) , 32-50
Nondestructive Evaluation of Full-Scale FRP Bridge Beams Prior to Construction
Two innovative hybrid bridges having conventional reinforced concrete slabs combined with fiber-reinforced polymer (FRP) beams have been designed and built in the Corpus Christi District. The first structure had two spans each of 30 feet and the second structure length is 50 feet; the width of each bridge is 32 feet. The first hybrid structure was designed by researchers at the University of Texas at Austin working closely with Texas Department of Transportation (TxDOT) and the second was designed by researchers at the University of Texas in Arlington and the University of South Carolina. For both bridge structures, beams were nondestructively evaluated at the manufacturing facility using Acoustic Emission (AE) as the primary evaluation method. This article presents a description of the structures and the methods and results of the nondestructive evaluation (NDE). AE testing proved to be a useful tool for helping to establish the fitness for service of the FRP beams prior to implementation and for identifying areas requiring special attention during the quality assurance phase.
- 29 June 2006
- Published by ASME International in Journal of Pressure Vessel Technology
- Vol. 129 (3) , 516-524
Effect of Temperature on Acoustic Emission Evaluation of FRP Vessels (Tensile Specimens)
Current American Society of Mechanical Engineers (ASME) provisions require that acoustic emission testing for class II vessels be carried out at operating temperature in the event that the operating temperature exceeds . This causes increased cost due to the need for a boiler. Safety is also a concern due to the possibility of a leak or failure of the vessel during testing. More important than these two items is the lack of data that is available from fiber reinforced polymer (FRP) vessels and/or components that have been subjected to acoustic emission evaluation at elevated temperature. This has lead to speculation regarding the appropriateness of conducting acoustic emission evaluations at elevated temperature. To address these issues an experimental investigation was conducted on representative coupon specimens at differing temperatures. The results of the investigation are described.- 29 June 2006
- Published by ASME International in Journal of Pressure Vessel Technology
- Vol. 129 (3) , 516-524
Effect of Temperature on Acoustic Emission Evaluation of FRP Vessels (Tensile Specimens)
Current American Society of Mechanical Engineers (ASME) provisions require that acoustic emission testing for class II vessels be carried out at operating temperature in the event that the operating temperature exceeds . This causes increased cost due to the need for a boiler. Safety is also a concern due to the possibility of a leak or failure of the vessel during testing. More important than these two items is the lack of data that is available from fiber reinforced polymer (FRP) vessels and/or components that have been subjected to acoustic emission evaluation at elevated temperature. This has lead to speculation regarding the appropriateness of conducting acoustic emission evaluations at elevated temperature. To address these issues an experimental investigation was conducted on representative coupon specimens at differing temperatures. The results of the investigation are described.