LCLi‐Chung Chao

Li‐Chung Chao

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Li‐Chung Chao has a total of 2 co-authors. Here are the top co-authors by number of shared publications:

  • Chang‐Nan Liou

    Ri‐Xin Construction Co. Ltd , Taiwan, Republic of China

    1 shared publication
  • Ching-Fa Chien

    Associate Professor, Dept. of Construction Engineering, National Kaohsiung First Univ. of Science and Technology, Kaohsiung 824, Taiwan, ROC

    1 shared publication

Latest Publications

  • Estimating project overheads rate in bidding: DSS approach using neural networks

    by Li‐Chung Chao

    Project overheads estimation by applying a selected rate as a percentage of direct cost is used widely in bidding in construction, but the rate is prone to inaccuracy if it is selected subjectively. An improved approach is developed, a decision support system (DSS) based on a construction firm’s cost data and using a neural network model for mapping of overheads rates from project attributes. The estimating ability of the proposed DSS is continually updated by retraining the neural networks with accumulated cost data in an expanding project database. An illustrative example is provided, in which the creation and updating of a prototype neural network model were simulated using cost data for projects spanning six years. The model explains the effects of duration and direct cost on overheads rates that the regression method fails to account for. The results also give empirical evidence that the DSS is capable of improving accuracy through annual model updating and may be used as a means for implementing organizational learning. The methods for assessing the loss risk for a bid incorporating an estimate from the DSS are provided.


  • Estimating Project S-Curves Using Polynomial Function and Neural Networks

    by Li-Chung Chao, Ching-Fa Chien

    The S-curve is a graphical representation of a construction project’s cumulative progress from start to finish. While S-curves for project control during construction should be estimated analytically based on a schedule of activity times, empirical estimation methods using various mathematical S-curve formulas have been developed for initial planning at predesign stages, with the mean for past similar projects often used as the basis of prediction. In an attempt to make an improvement, a succinct cubic polynomial function for generalizing S-curves is proposed and a comparison with existing formulas shows its advantages of accuracy and simplicity. Based on an analysis of the attributes and actual progress of 101 projects, four factors, i.e., contract amount, duration, type of work, and location, are then used as the inputs of a model developed for estimating S-curves as represented by the polynomial parameters. For model development, it is proposed to use neural networks for their ability to perform comple...


  • Risk‐minimizing approach to bid‐cutting limit determination

    by Li‐Chung Chao, Chang‐Nan Liou

    Intense price competition is quite common in the construction industry. In many markets, contractors have to cut their bids to compete, giving priority to winning enough contracts to sustain normal operation, and it is common to see a winning bid close to the expected project cost. While cutting bids not only gives up profits but also undoubtedly increases the risk of making a loss, the behaviour of contractors in intense competition is difficult to explain by existing academic bidding models. An approach to determining the lower limit of the bid for a project is proposed based on minimization of the overall loss risk defined by a probabilistic model. The approach can be used to prevent arbitrary over‐cuts in final bid decision where price competition is intense. Factors influencing the suggested bid‐cutting limit for a project are analysed. An illustrative example using real case data is provided.