Marton Frits
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Marton Frits has a total of 6 co-authors. Here are the top co-authors by number of shared publications:
- Botond Bertok
Department of Systems Science, Szechenyi István University, Győr, Hungary
3 shared publications Botond Bertok
1 shared publication- Daniel J S Chong
Ahuora–Centre for Smart Energy Systems, The University of Waikato, Hamilton, New Zealand
1 shared publication - Karoly Kalauz1 shared publication
- Károly Kalauz
Department of Systems Science, Szechenyi István University, 9026 Győr, Hungary
1 shared publication - Petar Sabev Varbanov
Széchenyi István University, Győr, Hungary
1 shared publication
Latest Publications
- Open Access
- 8 February 2026
- Published by Springer Nature in Discover Sustainability
- Vol. 7 (1)
Modelling optimal investment planning for household photovoltaic and battery systems under dynamic electricity market conditions
Capacity sizing and calculating cost savings for residential households in a rapidly evolving energy market, influenced by fluctuating electricity prices and changing government incentives, is a highly complex problem. The key challenges stem from multiple interacting factors, including retail electricity prices, the desired payback period, household size, applicable electricity schemes, and the capacity factor of the photovoltaic (PV) system. The nominal power output of the solar energy system is constrained by both the specifications and the number of installed inverters and PV panels. As solar generation is intermittent and non-dispatchable, it is inherently weather-dependent and often unable to align with the dynamic fluctuations in household electricity consumption. From a financial modelling perspective, the length of the accounting period directly determines the time resolution of the model, influencing both the accuracy of cash flow estimation and investment decision-making. The proposed two-level investment planning model is based on the process network synthesis approach. At the upper level of the process model, solar generation technologies, including inverters and solar panels, are technically and economically assessed. At the lower level, which represents the load consumption side, the periodical energy balances for production, storage, demand, and purchase are considered. In order to accurately evaluate the solar energy system, the model is developed with both a monthly framework and a detailed hourly framework. The time resolution allows the model to account for grid intake, electricity sold, and storage inventory conditions over the defined periods, ultimately providing the optimal sizing for a solar system equipped with battery storage. Case studies are conducted to investigate the effects of household size, extended payback periods, varying retail electricity prices, and grid reliability. These scenarios demonstrate the key parameters that significantly influence the economic feasibility and optimal sizing of the solar energy system, which are discussed in detail in this paper.
- 8 February 2026
- Published by Springer Nature in Discover Sustainability
- Vol. 7 (1)
Open AccessModelling optimal investment planning for household photovoltaic and battery systems under dynamic electricity market conditions
Capacity sizing and calculating cost savings for residential households in a rapidly evolving energy market, influenced by fluctuating electricity prices and changing government incentives, is a highly complex problem. The key challenges stem from multiple interacting factors, including retail electricity prices, the desired payback period, household size, applicable electricity schemes, and the capacity factor of the photovoltaic (PV) system. The nominal power output of the solar energy system is constrained by both the specifications and the number of installed inverters and PV panels. As solar generation is intermittent and non-dispatchable, it is inherently weather-dependent and often unable to align with the dynamic fluctuations in household electricity consumption. From a financial modelling perspective, the length of the accounting period directly determines the time resolution of the model, influencing both the accuracy of cash flow estimation and investment decision-making. The proposed two-level investment planning model is based on the process network synthesis approach. At the upper level of the process model, solar generation technologies, including inverters and solar panels, are technically and economically assessed. At the lower level, which represents the load consumption side, the periodical energy balances for production, storage, demand, and purchase are considered. In order to accurately evaluate the solar energy system, the model is developed with both a monthly framework and a detailed hourly framework. The time resolution allows the model to account for grid intake, electricity sold, and storage inventory conditions over the defined periods, ultimately providing the optimal sizing for a solar system equipped with battery storage. Case studies are conducted to investigate the effects of household size, extended payback periods, varying retail electricity prices, and grid reliability. These scenarios demonstrate the key parameters that significantly influence the economic feasibility and optimal sizing of the solar energy system, which are discussed in detail in this paper.
- Open Access
Optimal Planning of Routes, Schedules, and Charging Times of Automated Guided Electric Vehicles
In traditional industry setups, Automated Guided Vehicles (AGVs) follow trajectories planned together with the layout of the storage or production facility and supported by fixed markers on the floor or on the walls. Traffic rules manage the avoidance of multiple vehicles, while fleet management gets movement and transportation commands completed as soon as possible. In contrast, recent developments in navigation and advanced computing, sensor, and communication capabilities make their free movement safe and manageable. Detailed route planning and scheduling can guarantee that the vehicles keep a safe distance in time and space. A recent challenge of electric AGVs is that their charging may take several hours, which must be factored into their schedule. This has made minimal energy demand a key objective alongside earliest delivery and strictly meeting the deadlines. This paper presents a method for detailed routing and scheduling of AGV fleets to minimize energy consumption while considering battery levels and charging times. The optimization method is illustrated by a case study where multiple delivery tasks are performed by synchronized movement of vehicles on a complex warehouse layout. In the optimal solution, the scheduled waiting times for collision avoidance are utilized by the vehicles to pre-charge their batteries.
Open AccessOptimal Planning of Routes, Schedules, and Charging Times of Automated Guided Electric Vehicles
In traditional industry setups, Automated Guided Vehicles (AGVs) follow trajectories planned together with the layout of the storage or production facility and supported by fixed markers on the floor or on the walls. Traffic rules manage the avoidance of multiple vehicles, while fleet management gets movement and transportation commands completed as soon as possible. In contrast, recent developments in navigation and advanced computing, sensor, and communication capabilities make their free movement safe and manageable. Detailed route planning and scheduling can guarantee that the vehicles keep a safe distance in time and space. A recent challenge of electric AGVs is that their charging may take several hours, which must be factored into their schedule. This has made minimal energy demand a key objective alongside earliest delivery and strictly meeting the deadlines. This paper presents a method for detailed routing and scheduling of AGV fleets to minimize energy consumption while considering battery levels and charging times. The optimization method is illustrated by a case study where multiple delivery tasks are performed by synchronized movement of vehicles on a complex warehouse layout. In the optimal solution, the scheduled waiting times for collision avoidance are utilized by the vehicles to pre-charge their batteries.
- Open Access
- 13 December 2023
- Published by Elsevier in Journal of Cleaner Production
- Vol. 434
Algorithmic model generation for multi-site multi-period planning of clean processes by P-graphs
- 13 December 2023
- Published by Elsevier in Journal of Cleaner Production
- Vol. 434
Open AccessAlgorithmic model generation for multi-site multi-period planning of clean processes by P-graphs
- Open Access
- 13 July 2021
- Published by Elsevier in Computers & Operations Research
- Vol. 136, 105472
Routing and scheduling field service operation by P-graph
- 13 July 2021
- Published by Elsevier in Computers & Operations Research
- Vol. 136, 105472
Open AccessRouting and scheduling field service operation by P-graph