Marcin Jakubek
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Marcin Jakubek has a total of 7 co-authors. Here are the top co-authors by number of shared publications:
- Endika Urresti Padrón
Interdisciplinary Division for Energy Analyses, National Centre for Nuclear Research, 02-724 Warsaw, Poland
2 shared publications - Michal Klos
Interdisciplinary Division for Energy Analyses, National Centre for Nuclear Research, 02-724 Warsaw, Poland
2 shared publications - Wojciech Jaworski
Interdisciplinary Division for Energy Analyses, National Centre for Nuclear Research, 02-724 Warsaw, Poland
2 shared publications - Karol Wawrzyniak
Narodowe Centrum Badań Jądrowych, Interdyscyplinarny Zakład Analiz Energetycznych (IDEA)
1 shared publication - Marcin Blachnik
Silesian University of Technology, Poland
1 shared publication - Oded Stark
University of Bonn, Bonn, Germany
1 shared publication
Latest Publications
- Open Access
- 5 March 2021
- Published by MDPI AG in Electronics
- Vol. 10 (5) , 610
Partitioning Power Grid for the Design of the Zonal Energy Market While Preserving Control Area Constraints
The use of a zonal structure for energy markets across the globe is expanding; however the debate on how to effectively partition the grid into bidding zones is still open for discussion. One of the factors that needs to be addressed in the process of bidding zones’ delimitation is the transmission system operators control areas. Merging parts of different control areas into one bidding zone can lead to multiple problems, ranging from political, through grid security concerns, to reserve control issues. To address it, this paper presents a novel grid partitioning method aimed at bidding zones delimitation that is based on clustering the power grid using an extended version of the standard agglomerative clustering. The proposed solution adds additional clustering rules when constructing the dendrogram in order to take into account the control areas. The algorithm is applied to the data which represents the locational marginal prices obtained from optimal power flow analysis.
- 5 March 2021
- Published by MDPI AG in Electronics
- Vol. 10 (5) , 610
Open AccessPartitioning Power Grid for the Design of the Zonal Energy Market While Preserving Control Area Constraints
The use of a zonal structure for energy markets across the globe is expanding; however the debate on how to effectively partition the grid into bidding zones is still open for discussion. One of the factors that needs to be addressed in the process of bidding zones’ delimitation is the transmission system operators control areas. Merging parts of different control areas into one bidding zone can lead to multiple problems, ranging from political, through grid security concerns, to reserve control issues. To address it, this paper presents a novel grid partitioning method aimed at bidding zones delimitation that is based on clustering the power grid using an extended version of the standard agglomerative clustering. The proposed solution adds additional clustering rules when constructing the dendrogram in order to take into account the control areas. The algorithm is applied to the data which represents the locational marginal prices obtained from optimal power flow analysis.
- Open Access
Defining Transmission System Operators’ Investment Shares for Phase-Shifting Transformers Used for Coordinated Redispatch
The implementation of network codes within the framework of European Transmission System Operators (TSOs), involves redesigning the process of executing remedial actions aimed at maintaining the power system on a daily basis. One of the key elements of this redesign is the co-optimisation of all accessible measures, bringing a cost-optimal result and providing network security for the entire Capacity Calculation Region (CCR). This specifically means that the currently installed Phase Shifting Transformers (PSTs) are expected to be utilised for the benefit of the whole CCR, with no special priority to any issues incurred by the owner. Therefore, this paper addresses any questions regarding the rules of financing (investment shares per TSO) to be applied for future PST installations. The investment shares are calculated based on the exemplary implementation of a new European procedure – cost-sharing of remedial actions. Consequently, another long-term application of this process is postulated. In order to support the claims with numerical evidence, two scenarios with new PST investments are analysed. The conclusions drawn show that the largest investment burden can be imposed upon zones different from the area of which the new PST installation has taken place. As a result, joint TSOs’ investments may be a potential solution to financing new devices used for future coordination of remedial actions.
Open AccessDefining Transmission System Operators’ Investment Shares for Phase-Shifting Transformers Used for Coordinated Redispatch
The implementation of network codes within the framework of European Transmission System Operators (TSOs), involves redesigning the process of executing remedial actions aimed at maintaining the power system on a daily basis. One of the key elements of this redesign is the co-optimisation of all accessible measures, bringing a cost-optimal result and providing network security for the entire Capacity Calculation Region (CCR). This specifically means that the currently installed Phase Shifting Transformers (PSTs) are expected to be utilised for the benefit of the whole CCR, with no special priority to any issues incurred by the owner. Therefore, this paper addresses any questions regarding the rules of financing (investment shares per TSO) to be applied for future PST installations. The investment shares are calculated based on the exemplary implementation of a new European procedure – cost-sharing of remedial actions. Consequently, another long-term application of this process is postulated. In order to support the claims with numerical evidence, two scenarios with new PST investments are analysed. The conclusions drawn show that the largest investment burden can be imposed upon zones different from the area of which the new PST installation has taken place. As a result, joint TSOs’ investments may be a potential solution to financing new devices used for future coordination of remedial actions.
- Open Access
- 1 August 2020
- Published by Elsevier in Social Science & Medicine
- Vol. 259, 112829
A methodological rejoinder to “Does income relate to health due to psychosocial or material factors?”
- 1 August 2020
- Published by Elsevier in Social Science & Medicine
- Vol. 259, 112829
Open AccessA methodological rejoinder to “Does income relate to health due to psychosocial or material factors?”
- Open Access
Pre-Selection of the Optimal Sitting of Phase-Shifting Transformers Based on an Optimization Problem Solved within a Coordinated Cross-Border Congestion Management Process
The current European policy roadmap aims at forcing the TSOs to coordinate remedial actions used for relieving the congestions in the synchronous power system. In this paper, an optimization problem for coordinated congestion management is described and its results obtained for a real European use cases created in the H2020 EU-SysFlex project are presented. First of all, these results prove the feasibility of a central optimization problem for the coordination of the cross-border congestion management process. Next, the formulated optimization problem is used to tackle the issue of planning the investments in phase-shifting transformers (PSTs), for the purpose of increasing the efficiency/decreasing the cost of congestion management. Finally, this paper introduces two optimization-based indicators for pre-selecting the investment sites, which may be used to support the decision makers aiming at decreasing the costs of coordinated congestion management.
Open AccessPre-Selection of the Optimal Sitting of Phase-Shifting Transformers Based on an Optimization Problem Solved within a Coordinated Cross-Border Congestion Management Process
The current European policy roadmap aims at forcing the TSOs to coordinate remedial actions used for relieving the congestions in the synchronous power system. In this paper, an optimization problem for coordinated congestion management is described and its results obtained for a real European use cases created in the H2020 EU-SysFlex project are presented. First of all, these results prove the feasibility of a central optimization problem for the coordination of the cross-border congestion management process. Next, the formulated optimization problem is used to tackle the issue of planning the investments in phase-shifting transformers (PSTs), for the purpose of increasing the efficiency/decreasing the cost of congestion management. Finally, this paper introduces two optimization-based indicators for pre-selecting the investment sites, which may be used to support the decision makers aiming at decreasing the costs of coordinated congestion management.