Markus Zerlauth
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Research Interests
Markus Zerlauth has a total of 1000 co-authors. Here are the top co-authors by number of shared publications:
- Daniel Wollmann
European Organization for Nuclear Research
8 shared publications - Oliver Bruning
European Organization for Nuclear Research
5 shared publications - Arjan Verweij
European Organization for Nuclear Research
4 shared publications - Marta Bajko
CERN, Geneva, Switzerland
4 shared publications - Samer Yammine
CERN, Geneva, Switzerland
4 shared publications - Christian Scheuerlein
European Organization for Nuclear Research
3 shared publications
Latest Publications
- Open Access
- 10 August 2026
- Published by Springer Nature in The European Physical Journal Plus
- Vol. 141 (8) , 922
News from the HL-LHC machine (and lessons learnt for future collider projects)
Operation of CERN’s present flagship project, the Large Hadron Collider (LHC), will come to an end in June 2026. After many years of successful operation in its current configuration since its startup for high-energy collisions in March 2010, the LHC will be transformed into the High Luminosity LHC (HL-LHC) configuration during the 47 months of Long Shutdown 3 (LS3). Series production of the components required for the HL-LHC project is currently in full swing, and the project is currently preparing for the transition into the deployment phase in the LHC tunnel and newly built underground galleries. In this paper we present the present status and outlook of the HL-LHC project, as well as lessons learnt from this major international endeavor that will be applicable for future projects of the High-Energy physics community.
- 10 August 2026
- Published by Springer Nature in The European Physical Journal Plus
- Vol. 141 (8) , 922
Open AccessNews from the HL-LHC machine (and lessons learnt for future collider projects)
Operation of CERN’s present flagship project, the Large Hadron Collider (LHC), will come to an end in June 2026. After many years of successful operation in its current configuration since its startup for high-energy collisions in March 2010, the LHC will be transformed into the High Luminosity LHC (HL-LHC) configuration during the 47 months of Long Shutdown 3 (LS3). Series production of the components required for the HL-LHC project is currently in full swing, and the project is currently preparing for the transition into the deployment phase in the LHC tunnel and newly built underground galleries. In this paper we present the present status and outlook of the HL-LHC project, as well as lessons learnt from this major international endeavor that will be applicable for future projects of the High-Energy physics community.
- Open Access
- 21 July 2026
- Published by Springer Nature in The European Physical Journal C
- Vol. 86 (7)
Erratum to: Future Circular Collider Feasibility Study Report
- 21 July 2026
- Published by Springer Nature in The European Physical Journal C
- Vol. 86 (7)
Open AccessErratum to: Future Circular Collider Feasibility Study Report
- Top Cited PapersOpen Access
- 24 December 2025
- Published by Springer Nature in The European Physical Journal C
- Vol. 85 (12)
Future Circular Collider Feasibility Study Report
Volume 1 of the FCC Feasibility Report presents an overview of the physics case, experimental programme, and detector concepts for the Future Circular Collider (FCC). This volume outlines how FCC would address some of the most profound open questions in particle physics, from precision studies of the Higgs and EW bosons and of the top quark, to the exploration of physics beyond the Standard Model. The report reviews the experimental opportunities offered by the staged implementation of FCC, beginning with an electron-positron collider (FCC-ee), operating at several centre-of-mass energies, followed by a hadron collider (FCC-hh). Benchmark examples are given of the expected physics performance, in terms of precision and sensitivity to new phenomena, of each collider stage. Detector requirements and conceptual designs for FCC-ee experiments are discussed, as are the specific demands that the physics programme imposes on the accelerator in the domains of the calibration of the collision energy, and the interface region between the accelerator and the detector. The report also highlights advances in detector, software and computing technologies, as well as the theoretical tools/reconstruction techniques that will enable the precision measurements and discovery potential of the FCC experimental programme. The content and structure of this report are guided by the scope and priorities defined in the mandate of the FCC Feasibility Study. It is therefore not intended to serve as an exhaustive review of the full physics potential of FCC. Several topics, already covered in earlier reports such as the FCC CDR, are not reiterated here or are addressed only briefly, in alignment with the study’s focus. This volume reflects the outcome of a global collaborative effort involving hundreds of scientists and institutions, aided by a dedicated community-building coordination, and provides a targeted assessment of the scientific opportunities and experimental foundations of the FCC programme.
- 24 December 2025
- Published by Springer Nature in The European Physical Journal C
- Vol. 85 (12)
Top Cited PapersOpen AccessFuture Circular Collider Feasibility Study Report
Volume 1 of the FCC Feasibility Report presents an overview of the physics case, experimental programme, and detector concepts for the Future Circular Collider (FCC). This volume outlines how FCC would address some of the most profound open questions in particle physics, from precision studies of the Higgs and EW bosons and of the top quark, to the exploration of physics beyond the Standard Model. The report reviews the experimental opportunities offered by the staged implementation of FCC, beginning with an electron-positron collider (FCC-ee), operating at several centre-of-mass energies, followed by a hadron collider (FCC-hh). Benchmark examples are given of the expected physics performance, in terms of precision and sensitivity to new phenomena, of each collider stage. Detector requirements and conceptual designs for FCC-ee experiments are discussed, as are the specific demands that the physics programme imposes on the accelerator in the domains of the calibration of the collision energy, and the interface region between the accelerator and the detector. The report also highlights advances in detector, software and computing technologies, as well as the theoretical tools/reconstruction techniques that will enable the precision measurements and discovery potential of the FCC experimental programme. The content and structure of this report are guided by the scope and priorities defined in the mandate of the FCC Feasibility Study. It is therefore not intended to serve as an exhaustive review of the full physics potential of FCC. Several topics, already covered in earlier reports such as the FCC CDR, are not reiterated here or are addressed only briefly, in alignment with the study’s focus. This volume reflects the outcome of a global collaborative effort involving hundreds of scientists and institutions, aided by a dedicated community-building coordination, and provides a targeted assessment of the scientific opportunities and experimental foundations of the FCC programme.
- 7 March 2025
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 35 (5) , 1-6
Project Quality Management for the HL-LHC IT String
This article explores the project management quality standards required for leading complex technical projects involving state-of-the art superconducting technologies, diverse stakeholders and extensive installation, commissioning, and quality assurance/ control activities. Specifically, it presents the project management framework – including processes and best practices – implemented for the High-Luminosity Large Hadron Collider (HL-LHC) Inner Triplet (IT) String test stand at CERN. This facility evaluates the collective behavior of major components to be installed on one side of the upgraded HL-LHC interaction point. It will serve to apply and improve installation and hardware commissioning test procedures, and QA/QC processes. The paper details the documentation and tools used to ensure proper execution and compliance with stakeholder requirements, as well as the communication strategy for reporting progress. Additionally, the paper specifies the type of quality control checks applied in the test stand, the tools to follow the tests from a managerial perspective and the handling of associated non-conformities. Finally, it presents the strategy for disseminating lessons learned to the project stakeholders.
- 7 March 2025
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 35 (5) , 1-6
Project Quality Management for the HL-LHC IT String
This article explores the project management quality standards required for leading complex technical projects involving state-of-the art superconducting technologies, diverse stakeholders and extensive installation, commissioning, and quality assurance/ control activities. Specifically, it presents the project management framework – including processes and best practices – implemented for the High-Luminosity Large Hadron Collider (HL-LHC) Inner Triplet (IT) String test stand at CERN. This facility evaluates the collective behavior of major components to be installed on one side of the upgraded HL-LHC interaction point. It will serve to apply and improve installation and hardware commissioning test procedures, and QA/QC processes. The paper details the documentation and tools used to ensure proper execution and compliance with stakeholder requirements, as well as the communication strategy for reporting progress. Additionally, the paper specifies the type of quality control checks applied in the test stand, the tools to follow the tests from a managerial perspective and the handling of associated non-conformities. Finally, it presents the strategy for disseminating lessons learned to the project stakeholders.
- Open Access
- 15 January 2025
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 35 (5) , 1-5
Transforming Concept into Reality: Overcoming Challenges in the HL-LHC IT String Test Stand Implementation
The objective of the High-Luminosity Large Hadron Collider (HL-LHC) Inner Triplet (IT) String is to faithfully represent and validate, within a surface building at CERN, the installation and collective behavior of all major systems in the new HL-LHC IT zone. These systems encompass superconducting magnets, protection, cryogenics for the superconducting magnets and the superconducting link, powering, vacuum, alignment, interconnections between magnets, and the superconducting link itself. The construction of this test facility, intended to complete its validation program before the installation of equipment in the LHC tunnel, is currently in an advanced state. From the initial concept to the final design and implementation of the IT String, numerous challenges had to be addressed in both technical and management domains. This publication aims to outline and classify these challenges, providing detailed insights into the proposed solutions for the problems encountered. Following an introduction to the project and its structure, the publication will delve into challenges related to integration, scheduling, budget and resource estimates, installation aspects, responsibilities, collaborations between teams, safety, and communication. Finally, we will conclude summarizing the key challenges addressed and solutions implemented, and we will discuss the potential overall impact and benefits of the HL-LHC IT String test stand on the broader HL-LHC project.
- 15 January 2025
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 35 (5) , 1-5
Open AccessTransforming Concept into Reality: Overcoming Challenges in the HL-LHC IT String Test Stand Implementation
The objective of the High-Luminosity Large Hadron Collider (HL-LHC) Inner Triplet (IT) String is to faithfully represent and validate, within a surface building at CERN, the installation and collective behavior of all major systems in the new HL-LHC IT zone. These systems encompass superconducting magnets, protection, cryogenics for the superconducting magnets and the superconducting link, powering, vacuum, alignment, interconnections between magnets, and the superconducting link itself. The construction of this test facility, intended to complete its validation program before the installation of equipment in the LHC tunnel, is currently in an advanced state. From the initial concept to the final design and implementation of the IT String, numerous challenges had to be addressed in both technical and management domains. This publication aims to outline and classify these challenges, providing detailed insights into the proposed solutions for the problems encountered. Following an introduction to the project and its structure, the publication will delve into challenges related to integration, scheduling, budget and resource estimates, installation aspects, responsibilities, collaborations between teams, safety, and communication. Finally, we will conclude summarizing the key challenges addressed and solutions implemented, and we will discuss the potential overall impact and benefits of the HL-LHC IT String test stand on the broader HL-LHC project.
- Open Access
- 31 January 2024
- Published by Sissa Medialab Srl
- Vol. 449, 615
Status and prospects of the HL-LHC project
This contribution summarizes the status of preparations and series production of key technologies for the HL-LHC upgrade project. The upgrade will be deployed in the LHC tunnel at the end of the currently ongoing third operational run of the LHC, by creating new underground areas and upgrading the existing LHC equipment, aiming to increase the data set collected by the main LHC experiments by another order of magnitude and starting operation as of 2029.
- 31 January 2024
- Published by Sissa Medialab Srl
- Vol. 449, 615
Open AccessStatus and prospects of the HL-LHC project
This contribution summarizes the status of preparations and series production of key technologies for the HL-LHC upgrade project. The upgrade will be deployed in the LHC tunnel at the end of the currently ongoing third operational run of the LHC, by creating new underground areas and upgrading the existing LHC equipment, aiming to increase the data set collected by the main LHC experiments by another order of magnitude and starting operation as of 2029.
- Open Access
- 9 January 2024
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 34 (5) , 1-5
Experimental Program of the HL-LHC Inner Triplet String Test at CERN
This contribution describes the experimental program already undergoing and to be completed on the High Luminosity Large Hadron Collider (HL-LHC) Inner Triplet (IT) String, an important intermediate milestone of the HL-LHC project at CERN. First, it describes the magnet circuits of the HL-LHC IT String. Afterwards, the different systems installed to perform the experimental program are detailed. The proposed tests are defined for the validation of the cryogenic system, the full remote alignment system, the powering system, and the protection schemes of all magnets working in unison. This strategy will allow for a verification of the integrated powering system before the final installation and commissioning in the HL-LHC's underground areas.
- 9 January 2024
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Applied Superconductivity
- Vol. 34 (5) , 1-5
Open AccessExperimental Program of the HL-LHC Inner Triplet String Test at CERN
This contribution describes the experimental program already undergoing and to be completed on the High Luminosity Large Hadron Collider (HL-LHC) Inner Triplet (IT) String, an important intermediate milestone of the HL-LHC project at CERN. First, it describes the magnet circuits of the HL-LHC IT String. Afterwards, the different systems installed to perform the experimental program are detailed. The proposed tests are defined for the validation of the cryogenic system, the full remote alignment system, the powering system, and the protection schemes of all magnets working in unison. This strategy will allow for a verification of the integrated powering system before the final installation and commissioning in the HL-LHC's underground areas.
- Open Access
- 5 July 2022
- Published by American Physical Society (APS) in Physical Review Accelerators and Beams
- Vol. 25 (7) , 073501
Quantitative reliability analysis of interlock systems for research infrastructures
This article presents a reliability analysis method and a series of case studies of different architectures for interlock systems of large and complex research infrastructures. Interlock systems play a crucial role in the protection of different types of machines, including present and future particle accelerators and fusion experiments. These infrastructures require multibillion Euros investments and accidents could cause irreparable damage. Protection systems are needed to prevent damage from an unintended release of large amounts of stored energy or power. Interlock systems define the signal exchange between the sensors that detect non-nominal conditions and the actuators that bring the machine into a safe state through a protection shutdown. The design of machine protection systems in general and interlock systems, in particular, is caught between the desired machine safety and machine availability, and the requirements vary between different infrastructures. For some infrastructures, interlock systems must be designed to strictly avoid unintentional shutdowns, as these can have a significant impact on the lifetime of vital equipment or their primary operational purpose. For others, unintentional shutdowns due to a failure in the interlock system are acceptable as long as their number is small compared to protection shutdowns caused by failures of other equipment, in order to maximize their scientific output. The case studies presented in the article compare different interlock architectures based on the probability of specific failure scenarios occurring.
- 5 July 2022
- Published by American Physical Society (APS) in Physical Review Accelerators and Beams
- Vol. 25 (7) , 073501
Open AccessQuantitative reliability analysis of interlock systems for research infrastructures
This article presents a reliability analysis method and a series of case studies of different architectures for interlock systems of large and complex research infrastructures. Interlock systems play a crucial role in the protection of different types of machines, including present and future particle accelerators and fusion experiments. These infrastructures require multibillion Euros investments and accidents could cause irreparable damage. Protection systems are needed to prevent damage from an unintended release of large amounts of stored energy or power. Interlock systems define the signal exchange between the sensors that detect non-nominal conditions and the actuators that bring the machine into a safe state through a protection shutdown. The design of machine protection systems in general and interlock systems, in particular, is caught between the desired machine safety and machine availability, and the requirements vary between different infrastructures. For some infrastructures, interlock systems must be designed to strictly avoid unintentional shutdowns, as these can have a significant impact on the lifetime of vital equipment or their primary operational purpose. For others, unintentional shutdowns due to a failure in the interlock system are acceptable as long as their number is small compared to protection shutdowns caused by failures of other equipment, in order to maximize their scientific output. The case studies presented in the article compare different interlock architectures based on the probability of specific failure scenarios occurring.
- Open Access
- 11 August 2020
- Published by American Physical Society (APS) in Physical Review Accelerators and Beams
- Vol. 23 (8) , 081001
Fast failures in the LHC and the future high luminosity LHC
An energy of 362 MJ is stored in each of the two LHC proton beams for nominal beam parameters. This will be further increased to about 700 MJ in the future high luminosity LHC (HL-LHC) and uncontrolled beam losses represent a significant hazard for the integrity and safe operation of the machine. In this paper, a number of failure mechanisms that can lead to a fast increase of beam losses are analyzed. Most critical are failures in the magnet protection system, namely the quench heaters and a novel protection system called coupling-loss induced quench (CLIQ). An important outcome is that magnet protection has to be evaluated for its impact on the beam and designed accordingly. In particular, CLIQ, which is to protect the new HL-LHC triplet magnets, constitutes the fastest known failure in the LHC if triggered spuriously. A schematic change of CLIQ to mitigate the hazard is presented. A loss of the beam-beam kick due to the extraction of one beam is another source of beam losses with a fast onset. A significantly stronger impact is expected in the upcoming LHC Run III and HL-LHC as compared to the current LHC, mainly due to the increased bunch intensity. Its criticality and mitigation methods are discussed. It is shown that symmetric quenches in the superconducting magnets for the final focusing triplet can have a significant impact on the beam on short timescales. The impact on the beam due to failures of the beam-beam compensating wires as well as coherent excitations by the transverse beam damper are also discussed.
- 11 August 2020
- Published by American Physical Society (APS) in Physical Review Accelerators and Beams
- Vol. 23 (8) , 081001
Open AccessFast failures in the LHC and the future high luminosity LHC
An energy of 362 MJ is stored in each of the two LHC proton beams for nominal beam parameters. This will be further increased to about 700 MJ in the future high luminosity LHC (HL-LHC) and uncontrolled beam losses represent a significant hazard for the integrity and safe operation of the machine. In this paper, a number of failure mechanisms that can lead to a fast increase of beam losses are analyzed. Most critical are failures in the magnet protection system, namely the quench heaters and a novel protection system called coupling-loss induced quench (CLIQ). An important outcome is that magnet protection has to be evaluated for its impact on the beam and designed accordingly. In particular, CLIQ, which is to protect the new HL-LHC triplet magnets, constitutes the fastest known failure in the LHC if triggered spuriously. A schematic change of CLIQ to mitigate the hazard is presented. A loss of the beam-beam kick due to the extraction of one beam is another source of beam losses with a fast onset. A significantly stronger impact is expected in the upcoming LHC Run III and HL-LHC as compared to the current LHC, mainly due to the increased bunch intensity. Its criticality and mitigation methods are discussed. It is shown that symmetric quenches in the superconducting magnets for the final focusing triplet can have a significant impact on the beam on short timescales. The impact on the beam due to failures of the beam-beam compensating wires as well as coherent excitations by the transverse beam damper are also discussed.