Deniz Artan
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Deniz Artan has a total of 17 co-authors. Here are the top co-authors by number of shared publications:
- Esin Ergen
Istanbul Technical University Department of Civil Engineering
5 shared publications - Isilay Tekce
Özyeğin University Faculty of Architecture and Design
4 shared publications - Behlul Kula
Ph.D. Student, Dept. of Civil Engineering, Istanbul Technical Univ., Istanbul 34469, Turkey. ORCID:
2 shared publications - Gursans Guven
University of Manitoba
2 shared publications - Hazal Tokdemir
Istanbul Technical University
2 shared publications - Vedat Nalioğlu
Istanbul Technical University
2 shared publications
Latest Publications
- 1 June 2026
- Published by Emerald Publishing in International Journal of Building Pathology and Adaptation
- p. 1-20
Assessing contractors' circular economy performance: barriers and system requirements
Purpose: Contractors are undergoing a transformation to adopt circular economy (CE) principles. Performance assessment is crucial to this transformation; however, existing CE performance assessment (CEPA) systems demonstrate limited applicability to contractors, and a significant research gap remains concerning contractors' requirements for system-level integration. This study identifies the system requirements for assessing contractors' CE performance and proposes quantifiable strategies for measuring and promoting circularity at the firm level. Design/methodology/approach: CEPA models are examined through a systematic literature review to develop a theoretical framework outlining methodological approaches, indicators, technologies, and barriers to applicability. Semi-structured interviews with 15 CE experts identify additional barriers in practice and system requirements, which are subsequently validated and prioritised through a survey of 32 ENR-listed Turkish contractors operating internationally. Findings: Among 16 CEPA models reviewed, most target manufacturing contexts and remain conceptual, lacking empirical validation. Key barriers include the absence of construction-specific indicators aligned with ISO 59020:2024, data reliability and management challenges, and usability constraints. Identified system requirements comprise a customizable, user-friendly design, real-time data exchange and transparency. While dashboards are the preferred interface, interoperability with BIM and material passports is considered essential. Originality/value: Rather than introducing another assessment tool, this study synthesises empirical evidence from international contractors to determine system requirements, exploring how data infrastructure, system design and digital tools should be coherently integrated to guide the development and organisational implementation of CEPA, in the quest to accelerate the adoption of digitally enabled circular practices at the firm level.
- 1 June 2026
- Published by Emerald Publishing in International Journal of Building Pathology and Adaptation
- p. 1-20
Assessing contractors' circular economy performance: barriers and system requirements
Purpose: Contractors are undergoing a transformation to adopt circular economy (CE) principles. Performance assessment is crucial to this transformation; however, existing CE performance assessment (CEPA) systems demonstrate limited applicability to contractors, and a significant research gap remains concerning contractors' requirements for system-level integration. This study identifies the system requirements for assessing contractors' CE performance and proposes quantifiable strategies for measuring and promoting circularity at the firm level. Design/methodology/approach: CEPA models are examined through a systematic literature review to develop a theoretical framework outlining methodological approaches, indicators, technologies, and barriers to applicability. Semi-structured interviews with 15 CE experts identify additional barriers in practice and system requirements, which are subsequently validated and prioritised through a survey of 32 ENR-listed Turkish contractors operating internationally. Findings: Among 16 CEPA models reviewed, most target manufacturing contexts and remain conceptual, lacking empirical validation. Key barriers include the absence of construction-specific indicators aligned with ISO 59020:2024, data reliability and management challenges, and usability constraints. Identified system requirements comprise a customizable, user-friendly design, real-time data exchange and transparency. While dashboards are the preferred interface, interoperability with BIM and material passports is considered essential. Originality/value: Rather than introducing another assessment tool, this study synthesises empirical evidence from international contractors to determine system requirements, exploring how data infrastructure, system design and digital tools should be coherently integrated to guide the development and organisational implementation of CEPA, in the quest to accelerate the adoption of digitally enabled circular practices at the firm level.
- 9 February 2026
- Published by Teknik Dergi in Turkish Journal of Civil Engineering
- Vol. 37 (4) , 99-127
Yapı Bilgi Modellemesi ile Tümleşik Termal Konfor Değerlendirme Sistemi
Termal konfor yapılarda kullanıcı memnuniyetini, sağlığını, üretkenliğini ve enerji tüketimini etkilemektedir. Bu çalışmada, ofis binaları için kullanıcı geri bildirimlerinin gerekli bağlamsal bilgi öğeleriyle (örneğin, bina elemanları ve bina geometrisi) zenginleştirilerek toplanmasını sağlayan ve karar vericilere yapı bilgi modellemesi (BIM) ile entegre şekilde sunan bir termal konfor değerlendirme sistemi geliştirilmiştir. Çalışmanın yöntemi, Yapısal Eşitlik Modeli ile termal konfor ölçüm modeli geliştirilmesi ve önerilen BIM ile tümleşik termal konfor değerlendirme sisteminin prototipi oluşturularak bir ofis binasında vaka analiziyle doğrulamasını içerir. Sonuçlar, geliştirilen sistemin kullanıcı geri bildirimlerinin etkin şekilde toplanmasını ve analiz edilmesini sağladığını göstermektedir. Önerilen sistemin ofislerde enerji tüketimini optimize ederek termal konforu iyileştirmesi ve böylece kullanıcı memnuniyeti, sağlığı, üretkenliğine katkıda bulunması beklenmektedir.
- 9 February 2026
- Published by Teknik Dergi in Turkish Journal of Civil Engineering
- Vol. 37 (4) , 99-127
Yapı Bilgi Modellemesi ile Tümleşik Termal Konfor Değerlendirme Sistemi
Termal konfor yapılarda kullanıcı memnuniyetini, sağlığını, üretkenliğini ve enerji tüketimini etkilemektedir. Bu çalışmada, ofis binaları için kullanıcı geri bildirimlerinin gerekli bağlamsal bilgi öğeleriyle (örneğin, bina elemanları ve bina geometrisi) zenginleştirilerek toplanmasını sağlayan ve karar vericilere yapı bilgi modellemesi (BIM) ile entegre şekilde sunan bir termal konfor değerlendirme sistemi geliştirilmiştir. Çalışmanın yöntemi, Yapısal Eşitlik Modeli ile termal konfor ölçüm modeli geliştirilmesi ve önerilen BIM ile tümleşik termal konfor değerlendirme sisteminin prototipi oluşturularak bir ofis binasında vaka analiziyle doğrulamasını içerir. Sonuçlar, geliştirilen sistemin kullanıcı geri bildirimlerinin etkin şekilde toplanmasını ve analiz edilmesini sağladığını göstermektedir. Önerilen sistemin ofislerde enerji tüketimini optimize ederek termal konforu iyileştirmesi ve böylece kullanıcı memnuniyeti, sağlığı, üretkenliğine katkıda bulunması beklenmektedir.
- Open Access
- 31 December 2024
- Published by Mugla Sitki Kocman University in Mugla Journal of Science and Technology
- Vol. 10 (2) , 88-97
IMPACT OF PERSONAL DEMOGRAPHICS ON JOB SATISFACTION AND WORK-LIFE BALANCE OF THE TECHNICAL PERSONNEL WORKING AT CONSTRUCTION SITES
The well-being and productivity of the technical personnel working at the construction sites are highly affected by job satisfaction (JS) and work-life balance (WLB). Numerous studies have been conducted on various aspects of JS and WLB, however, empirical studies on the impacts of personal demographics are scanty. This paper aims to explore the technical personnel’s perceptions of JS and WLB by determining (1) the significant differences in the satisfaction levels and (2) any significant clusters based on personal demographics. Data were collected from 307 respondents and analysed using the Mann-Whitney U test and Cluster Analysis. The results reveal that technical personnel, who are older than 29, married, work at the office rather than the construction site, work less than 54 hours a week, and have children, are significantly more satisfied in terms of workload. It is noteworthy that male and single technical personnel, who work at the office rather than the construction site and work less than 54 hours a week, are significantly more satisfied regarding chances for personal development. As a result of the cluster analysis, three clusters were formed concerning JS. Additionally, three clusters were formed for WLB factors and gender. The main contributions of the study are (1) a comprehensive understanding of the impact of demographics on JS and WLB and (2) recommendations on how JS and WLB of the technical personnel can be improved at the construction sites.
- 31 December 2024
- Published by Mugla Sitki Kocman University in Mugla Journal of Science and Technology
- Vol. 10 (2) , 88-97
Open AccessIMPACT OF PERSONAL DEMOGRAPHICS ON JOB SATISFACTION AND WORK-LIFE BALANCE OF THE TECHNICAL PERSONNEL WORKING AT CONSTRUCTION SITES
The well-being and productivity of the technical personnel working at the construction sites are highly affected by job satisfaction (JS) and work-life balance (WLB). Numerous studies have been conducted on various aspects of JS and WLB, however, empirical studies on the impacts of personal demographics are scanty. This paper aims to explore the technical personnel’s perceptions of JS and WLB by determining (1) the significant differences in the satisfaction levels and (2) any significant clusters based on personal demographics. Data were collected from 307 respondents and analysed using the Mann-Whitney U test and Cluster Analysis. The results reveal that technical personnel, who are older than 29, married, work at the office rather than the construction site, work less than 54 hours a week, and have children, are significantly more satisfied in terms of workload. It is noteworthy that male and single technical personnel, who work at the office rather than the construction site and work less than 54 hours a week, are significantly more satisfied regarding chances for personal development. As a result of the cluster analysis, three clusters were formed concerning JS. Additionally, three clusters were formed for WLB factors and gender. The main contributions of the study are (1) a comprehensive understanding of the impact of demographics on JS and WLB and (2) recommendations on how JS and WLB of the technical personnel can be improved at the construction sites.
- Open Access
Riesgo: A Knowledge-Based Qualitative Risk Assessment System for PPP Projects
A successful public-private partnership (PPP) relies heavily on effective risk assessment, given the intricate risk factors and contractual arrangements involved. While quantitative risk assessment methods have received significant attention in the PPP literature, qualitative risk assessment, the sector’s predominant preference, remains underexplored, causing a low level of applicability of academic studies and indicating a noticeable research gap. A qualitative risk assessment tool prototype, Riesgo, is developed in this paper as a customizable, knowledge-based digital risk register incorporating a pre-defined template that guides users using PPP risk factors, compensation and mitigation options, project information requirements, and risk register items. This paper presents the proposed system architecture, explains the research steps adopted in determining the system elements, and delineates the system functions through a use case developed to illustrate the process and information flows. The prototype was verified by 13 PPP experts who employed it for risk assessment, and their feedback was utilized for further development. A validation survey of 21 professionals affirmed Riesgo’s usability and applicability in the industry. The customizable and knowledge-based prototype has the potential to streamline effective risk assessment and guide the users across various PPP phases, such as early risk assessment, feasibility studies, contract preparation, and monitoring.
Open AccessRiesgo: A Knowledge-Based Qualitative Risk Assessment System for PPP Projects
A successful public-private partnership (PPP) relies heavily on effective risk assessment, given the intricate risk factors and contractual arrangements involved. While quantitative risk assessment methods have received significant attention in the PPP literature, qualitative risk assessment, the sector’s predominant preference, remains underexplored, causing a low level of applicability of academic studies and indicating a noticeable research gap. A qualitative risk assessment tool prototype, Riesgo, is developed in this paper as a customizable, knowledge-based digital risk register incorporating a pre-defined template that guides users using PPP risk factors, compensation and mitigation options, project information requirements, and risk register items. This paper presents the proposed system architecture, explains the research steps adopted in determining the system elements, and delineates the system functions through a use case developed to illustrate the process and information flows. The prototype was verified by 13 PPP experts who employed it for risk assessment, and their feedback was utilized for further development. A validation survey of 21 professionals affirmed Riesgo’s usability and applicability in the industry. The customizable and knowledge-based prototype has the potential to streamline effective risk assessment and guide the users across various PPP phases, such as early risk assessment, feasibility studies, contract preparation, and monitoring.
- 23 February 2024
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Engineering Management
- Vol. 71 (00189391) , 14387-14400
An Occupational Safety Risk Management System for Coastal Construction Projects
Inadequate management of safety risks causes fatalities, injuries, delays, and cost overruns in construction projects. Unpredictable and hostile conditions in coastal construction exacerbate these safety risks. Successful risk management requires effective management and communication of risk information as well as rapid access to relevant knowledge. For this purpose, safety risk management systems were developed using digital technologies, however, none focus on coastal construction, where the activities, risk factors, and mitigation methods are significantly different. This study aims to develop an occupational safety risk management system tailored to the specific needs of coastal construction projects that (1) collects risk data from the site in a structured and continuous manner and (2) facilitates knowledge-based decision-making to support effective risk management utilizing digital technologies. A prototype is developed and use cases are presented to illustrate the main objectives of the prototype and the proposed vision for its integration into building information modeling (BIM). The deployment in two real-world projects demonstrates that the developed prototype is applicable, practical, usable and that real-time risk data can be collected and analyzed with the proposed system. Using the risk information collected by the prototype, which supports proactive and dynamic risk management, managers can make critical decisions about the current project, undertake long-term safety planning, and utilize an organizational learning approach for risk avoidance in future projects.
- 23 February 2024
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Engineering Management
- Vol. 71 (00189391) , 14387-14400
An Occupational Safety Risk Management System for Coastal Construction Projects
Inadequate management of safety risks causes fatalities, injuries, delays, and cost overruns in construction projects. Unpredictable and hostile conditions in coastal construction exacerbate these safety risks. Successful risk management requires effective management and communication of risk information as well as rapid access to relevant knowledge. For this purpose, safety risk management systems were developed using digital technologies, however, none focus on coastal construction, where the activities, risk factors, and mitigation methods are significantly different. This study aims to develop an occupational safety risk management system tailored to the specific needs of coastal construction projects that (1) collects risk data from the site in a structured and continuous manner and (2) facilitates knowledge-based decision-making to support effective risk management utilizing digital technologies. A prototype is developed and use cases are presented to illustrate the main objectives of the prototype and the proposed vision for its integration into building information modeling (BIM). The deployment in two real-world projects demonstrates that the developed prototype is applicable, practical, usable and that real-time risk data can be collected and analyzed with the proposed system. Using the risk information collected by the prototype, which supports proactive and dynamic risk management, managers can make critical decisions about the current project, undertake long-term safety planning, and utilize an organizational learning approach for risk avoidance in future projects.
- 3 June 2023
- Published by Springer Nature
- p. 1647-1654
Adopting Digital Twin and Internet of Things in the Construction Industry: A SWOT Analysis
- 3 June 2023
- Published by Springer Nature
- p. 1647-1654
Adopting Digital Twin and Internet of Things in the Construction Industry: A SWOT Analysis
- 3 June 2023
- Published by Springer Nature
- p. 1631-1639
Possible Impacts of Smart Contracts on Construction Claim Management
- 3 June 2023
- Published by Springer Nature
- p. 1631-1639
Possible Impacts of Smart Contracts on Construction Claim Management
- Open Access
- 1 January 2023
- Published by Firenze University Press
- p. 499-507
A Preliminary Investigation of Knowledge Management Tools for the Construction Sector
Knowledge management (KM) is used by construction firms to establish organizational memory (OM) and consequently improve their performance by learning from past mistakes and best practices. Knowledge is the input to innovation; thus, the industry must adopt better ways of managing knowledge for advancement in the construction processes. Knowledge management consists of locating, modifying, and sharing knowledge to meet the needs of the current fast-paced sector. Various tools have been developed to support KM and OM in construction companies, however, it is very important to adequately address the needs of the sector for successful implementations. The aim of this study is to analyze the existing KM tools and evaluate their compatibility with the necessities of today’s sector. First, knowledge types in the construction industry were outlined, and existing KM tools were evaluated. Then, expert interviews were performed with two representatives from a prominent construction and a prominent consulting firm to delineate the contemporaneous KM practices as well as the KM needs in the construction industry. Finally, current practice in KM in the construction sector is evaluated, and a vision is developed for a more effective KM approach that could support OM in construction firms
- 1 January 2023
- Published by Firenze University Press
- p. 499-507
Open AccessA Preliminary Investigation of Knowledge Management Tools for the Construction Sector
Knowledge management (KM) is used by construction firms to establish organizational memory (OM) and consequently improve their performance by learning from past mistakes and best practices. Knowledge is the input to innovation; thus, the industry must adopt better ways of managing knowledge for advancement in the construction processes. Knowledge management consists of locating, modifying, and sharing knowledge to meet the needs of the current fast-paced sector. Various tools have been developed to support KM and OM in construction companies, however, it is very important to adequately address the needs of the sector for successful implementations. The aim of this study is to analyze the existing KM tools and evaluate their compatibility with the necessities of today’s sector. First, knowledge types in the construction industry were outlined, and existing KM tools were evaluated. Then, expert interviews were performed with two representatives from a prominent construction and a prominent consulting firm to delineate the contemporaneous KM practices as well as the KM needs in the construction industry. Finally, current practice in KM in the construction sector is evaluated, and a vision is developed for a more effective KM approach that could support OM in construction firms
- Open Access
- 21 April 2022
- Published by International Council for Research and Innovation in Building and Construction in Journal of Information Technology in Construction
- Vol. 27 (22) , 441-485
Rateworkspace: BIM integrated post-occupancy evaluation system for office buildings
The feedback obtained from occupants regarding their comfort needs and performance of buildings is critical for assessing occupant satisfaction, identifying the operation and maintenance (O&M) issues in time and for improving resource efficiency in buildings. Current facility management (FM) systems and occupant feedback collection practices, however, have limitations in supporting effective decision-making in FM, as they lack the necessary contextual data related to the occupant feedback (e.g., building geometry, systems, elements). Building Information Modeling (BIM)-enabled FM systems are used for combining different types of FM information with building models; however, occupant feedback is still not effectively utilized in FM since it is not integrated with BIM. In this study, a BIM integrated post-occupancy evaluation system prototype is developed for: (1) collecting occupant feedback along with the contextual information related to the feedback items in a structured way, and (2) presenting this information as integrated with BIM to the facility managers. This enables conducting spatio-temporal queries and supports effective decision-making by visualizing the collected feedback. The prototype was designed by using qualitative shadowing with FM teams to identify information needs and use case analysis to determine how contextual data integrated with BIM could be collected from office occupants who are non-technical persons with limited information on building models. This paper identifies the FM query categories that are required to process the occupant feedback and describes the RateWorkSpace prototype developed for office buildings. The deployment of the prototype in a real-world office demonstrates that the proposed system is applicable, practical, usable, and that real-time building performance data can be both collected and analysed with the developed system. This has the potential to increase the effectiveness of the FM and O&M processes, and help to create office spaces with optimized energy use and occupant comfort that also supports occupant well-being and productivity.
- 21 April 2022
- Published by International Council for Research and Innovation in Building and Construction in Journal of Information Technology in Construction
- Vol. 27 (22) , 441-485
Open AccessRateworkspace: BIM integrated post-occupancy evaluation system for office buildings
The feedback obtained from occupants regarding their comfort needs and performance of buildings is critical for assessing occupant satisfaction, identifying the operation and maintenance (O&M) issues in time and for improving resource efficiency in buildings. Current facility management (FM) systems and occupant feedback collection practices, however, have limitations in supporting effective decision-making in FM, as they lack the necessary contextual data related to the occupant feedback (e.g., building geometry, systems, elements). Building Information Modeling (BIM)-enabled FM systems are used for combining different types of FM information with building models; however, occupant feedback is still not effectively utilized in FM since it is not integrated with BIM. In this study, a BIM integrated post-occupancy evaluation system prototype is developed for: (1) collecting occupant feedback along with the contextual information related to the feedback items in a structured way, and (2) presenting this information as integrated with BIM to the facility managers. This enables conducting spatio-temporal queries and supports effective decision-making by visualizing the collected feedback. The prototype was designed by using qualitative shadowing with FM teams to identify information needs and use case analysis to determine how contextual data integrated with BIM could be collected from office occupants who are non-technical persons with limited information on building models. This paper identifies the FM query categories that are required to process the occupant feedback and describes the RateWorkSpace prototype developed for office buildings. The deployment of the prototype in a real-world office demonstrates that the proposed system is applicable, practical, usable, and that real-time building performance data can be both collected and analysed with the developed system. This has the potential to increase the effectiveness of the FM and O&M processes, and help to create office spaces with optimized energy use and occupant comfort that also supports occupant well-being and productivity.
- 1 January 2021
- Published by American Society of Civil Engineers (ASCE) in Journal of Computing in Civil Engineering
- Vol. 35 (1) , 04020055
Formalization of Occupant Feedback and Integration with BIM in Office Buildings
Occupant feedback is not effectively used in the facility management (FM) phase for operations and maintenance activities as well as retrofit and refurbishment investment decisions. One of the reasons is related to incomplete or mostly unstructured occupant feedback data. The goal of this paper is (1) to formalize occupant feedback in office buildings by developing a semantic data model, and (2) to implement the semantic data model in a prototype to demonstrate that capturing and storing occupant feedback and integrating it with building information modeling (BIM) improves the experience of both occupants and FM personnel. Interviews were conducted with office occupants and facility managers, and use cases were created to develop the semantic data model. This data model was implemented in the Industry Foundation Classes (IFC) schema and a case study was conducted, in which a prototype for collecting occupant feedback integrated with BIM was developed to test the proposed approach. The applicability, practicability, and usability of the system were measured via usability tests that were applied to the occupants and FM team members. The findings showed that the proposed semantic data model can be utilized to store occupant feedback in a structured manner and to integrate this information with BIM-enabled FM systems. This approach facilitates (1) continuous collection of occupant feedback along with the vital contextual information including geometric data, and (2) effective utilization of this information in FM operations by providing visualization and analysis capabilities.
- 1 January 2021
- Published by American Society of Civil Engineers (ASCE) in Journal of Computing in Civil Engineering
- Vol. 35 (1) , 04020055
Formalization of Occupant Feedback and Integration with BIM in Office Buildings
Occupant feedback is not effectively used in the facility management (FM) phase for operations and maintenance activities as well as retrofit and refurbishment investment decisions. One of the reasons is related to incomplete or mostly unstructured occupant feedback data. The goal of this paper is (1) to formalize occupant feedback in office buildings by developing a semantic data model, and (2) to implement the semantic data model in a prototype to demonstrate that capturing and storing occupant feedback and integrating it with building information modeling (BIM) improves the experience of both occupants and FM personnel. Interviews were conducted with office occupants and facility managers, and use cases were created to develop the semantic data model. This data model was implemented in the Industry Foundation Classes (IFC) schema and a case study was conducted, in which a prototype for collecting occupant feedback integrated with BIM was developed to test the proposed approach. The applicability, practicability, and usability of the system were measured via usability tests that were applied to the occupants and FM team members. The findings showed that the proposed semantic data model can be utilized to store occupant feedback in a structured manner and to integrate this information with BIM-enabled FM systems. This approach facilitates (1) continuous collection of occupant feedback along with the vital contextual information including geometric data, and (2) effective utilization of this information in FM operations by providing visualization and analysis capabilities.