Hamidreza Arbabi
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Hamidreza Arbabi has a total of 6 co-authors. Here are the top co-authors by number of shared publications:
- Ali Bozorgi-Amiri
School of Industrial Engineering, College of Engineering, University of Tehran, Tehran, Iran
2 shared publications - Reza Tavakkoli-Moghaddam
School of Industrial Engineering, College of Engineering, University of Tehran, Tehran, Iran
2 shared publications - Behdin Vahedi-Nouri
University of Tehran
1 shared publication - Mohammad Mahdi Nasiri
School of Industrial Engineering, College of Engineering, University of Tehran, Tehran, Iran
1 shared publication - Mohammad Rohaninejad
Czech Institute of Informatics, Robotics, and Cybernetics, Czech Technical University in Prague, Prague, Czech Republic
1 shared publication - Zdeněk Hanzálek
Czech Institute of Informatics Robotics and Cybernetics, Czech Technical University in Prague
1 shared publication
Latest Publications
- 3 May 2022
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 61 (9) , 2873-2894
Integrated configuration design and capacity planning in a dynamic cloud manufacturing system
A cloud manufacturing (CMfg) system is presented as a novel service- and customer-oriented manufacturing paradigm that integrates the distributed manufacturing enterprises to share their manufacturing capabilities or resources and collaborate as an interconnected system in a dynamic environment. Since the high performance of this system depends on the formation of a suitable group of manufacturing service providers, this paper develops an integrated c onfiguration design and capacity planning problem for the CMfg system by considering the dynamic environment of this system. In this regard, dynamic service providers and dynamic demand are considered as two aspects of the dynamic nature of this system. A multi-period multi-objective mathematical model is proposed by maximising the utilities of all three stakeholders of the system. Moreover, three extensions of a discrete multi-objective grey wolf optimiser (DMOGWO) algorithm are devised to solve the medium- and large-scale instances. A comprehensive computational experiment is conducted to assess the performance of the developed meta-heuristic algorithms. Furthermore, by carrying out a sensitivity analysis, some managerial insight is suggested for the managers.
- 3 May 2022
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 61 (9) , 2873-2894
Integrated configuration design and capacity planning in a dynamic cloud manufacturing system
A cloud manufacturing (CMfg) system is presented as a novel service- and customer-oriented manufacturing paradigm that integrates the distributed manufacturing enterprises to share their manufacturing capabilities or resources and collaborate as an interconnected system in a dynamic environment. Since the high performance of this system depends on the formation of a suitable group of manufacturing service providers, this paper develops an integrated c onfiguration design and capacity planning problem for the CMfg system by considering the dynamic environment of this system. In this regard, dynamic service providers and dynamic demand are considered as two aspects of the dynamic nature of this system. A multi-period multi-objective mathematical model is proposed by maximising the utilities of all three stakeholders of the system. Moreover, three extensions of a discrete multi-objective grey wolf optimiser (DMOGWO) algorithm are devised to solve the medium- and large-scale instances. A comprehensive computational experiment is conducted to assess the performance of the developed meta-heuristic algorithms. Furthermore, by carrying out a sensitivity analysis, some managerial insight is suggested for the managers.
- 2 September 2020
- Published by Taylor & Francis in Engineering Optimization
- Vol. 53 (9) , 1593-1612
A hub-and-spoke architecture for a parcel delivery system using the cross-docking distribution strategy
This article develops a hub-and-spoke architecture for a parcel delivery system using a network that includes a distribution centre and several cross-dock facilities. Several real-world assumptions, including an electric truck fleet, mobile charging station, third-party logistics, capacity constraints, last-mile deliveries and customer dissatisfaction, are incorporated in this problem. Besides, because of the high complexity of the problem, a novel matheuristic algorithm based on the combination of the fix-and-relax algorithm (FARA) and genetic algorithm (GA), namely Mb-FARGA, is developed to solve large-sized instances. A comprehensive computational analysis is accomplished to validate the proposed mathematical models and evaluate the performance of the Mb-FARGA method. According to the results, the Mb-FARGA method demonstrates a very favourable performance. Moreover, the results show that considering a distribution centre with appropriate capacity in the cross-docking system is an excellent strategy to enhance customer satisfaction, improve the system’s performance and reduce capacity shortages.
- 2 September 2020
- Published by Taylor & Francis in Engineering Optimization
- Vol. 53 (9) , 1593-1612
A hub-and-spoke architecture for a parcel delivery system using the cross-docking distribution strategy
This article develops a hub-and-spoke architecture for a parcel delivery system using a network that includes a distribution centre and several cross-dock facilities. Several real-world assumptions, including an electric truck fleet, mobile charging station, third-party logistics, capacity constraints, last-mile deliveries and customer dissatisfaction, are incorporated in this problem. Besides, because of the high complexity of the problem, a novel matheuristic algorithm based on the combination of the fix-and-relax algorithm (FARA) and genetic algorithm (GA), namely Mb-FARGA, is developed to solve large-sized instances. A comprehensive computational analysis is accomplished to validate the proposed mathematical models and evaluate the performance of the Mb-FARGA method. According to the results, the Mb-FARGA method demonstrates a very favourable performance. Moreover, the results show that considering a distribution centre with appropriate capacity in the cross-docking system is an excellent strategy to enhance customer satisfaction, improve the system’s performance and reduce capacity shortages.
- 17 August 2020
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 59 (7) , 2009-2027
Incorporating order acceptance, pricing and equity considerations in the scheduling of cloud manufacturing systems: matheuristic methods
Rooted from the Industry 4.0 principles, Cloud Manufacturing (CMfg) is a novel customer-oriented manufacturing norm, which can assist enterprises to withstand in the nowadays highly volatile and competitive market. CMfg systems comprise two separate parties, namely, customers and factories, with independent individuals. In this regard, considering the utilities of both customers and factories and establishing the equity amongst their individuals are of particular importance for the survival and flourishment of CMfg systems. Furthermore, due to the limited capacity of resources, tightness of due dates, and customers’ cost expectations, all orders may not be accepted in CMfg systems. Accordingly, this paper aims to explore a scheduling problem in a CMfg system. A multi-objective mathematical model is presented for the problem, which can determine the acceptance or rejection of orders, set prices, and schedule them in an integrated manner to maximise the customers and factories’ utilities, and enhance the equity among their members. Due to the high complexity of the problem, two matheuristic methods based on the Multi-Objective Grey Wolf Optimizer (MOGWO) and Non-dominated Sorting Genetic Algorithm II (NSGA-II) are developed. An extensive computational experiment is carried out to validate the proposed matheuristic methods and evaluate their performance. Moreover, some guidance is presented for managers by conducting a sensitivity analysis.
- 17 August 2020
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 59 (7) , 2009-2027
Incorporating order acceptance, pricing and equity considerations in the scheduling of cloud manufacturing systems: matheuristic methods
Rooted from the Industry 4.0 principles, Cloud Manufacturing (CMfg) is a novel customer-oriented manufacturing norm, which can assist enterprises to withstand in the nowadays highly volatile and competitive market. CMfg systems comprise two separate parties, namely, customers and factories, with independent individuals. In this regard, considering the utilities of both customers and factories and establishing the equity amongst their individuals are of particular importance for the survival and flourishment of CMfg systems. Furthermore, due to the limited capacity of resources, tightness of due dates, and customers’ cost expectations, all orders may not be accepted in CMfg systems. Accordingly, this paper aims to explore a scheduling problem in a CMfg system. A multi-objective mathematical model is presented for the problem, which can determine the acceptance or rejection of orders, set prices, and schedule them in an integrated manner to maximise the customers and factories’ utilities, and enhance the equity among their members. Due to the high complexity of the problem, two matheuristic methods based on the Multi-Objective Grey Wolf Optimizer (MOGWO) and Non-dominated Sorting Genetic Algorithm II (NSGA-II) are developed. An extensive computational experiment is carried out to validate the proposed matheuristic methods and evaluate their performance. Moreover, some guidance is presented for managers by conducting a sensitivity analysis.