Jian Cao
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Jian Cao has a total of 3 co-authors. Here are the top co-authors by number of shared publications:
- Qun-Xiong Zhu
Beijing University of Chemical Technology
2 shared publications - Yan-Lin He
Beijing University of Chemical Technology
1 shared publication Yan‐Lin He
College of Information Science & Technology Beijing University of Chemical Technology Beijing China
1 shared publication
Latest Publications
- 25 November 2020
- Published by Wiley in The Canadian Journal of Chemical Engineering
- Vol. 99 (S1) , S443-S457
Solutions selection based on the P‐graph integrated data envelopment analysis for material scheduling in the ethylene production
Material scheduling is significant in the ethylene production process. However, factors such as the production scale and the technology also affect the choice of material scheduling solutions. Therefore, this paper proposes a novel P‐graph methodology integrated data envelopment analysis (DEA) for the solutions selection of material scheduling. First, based on the basic procedure, a scheduling superstructure model expanding from the time dimension is built. With the cost as the objective function, the optimal and partially feasible scheduling solutions are generated based on the P‐graph, and the results are analyzed in detail with reference to ISA‐95. Then the DEA is used to analyze the indicators of material consumption and product yields to give a selection strategy from the input‐output perspective. The optimal solution and suboptimal solution sets are evaluated and analyzed, and decision making units (DMUs) with the highest score are calculated. Based on the scheduling solution with the highest score and relatively low cost, the potential adjustment of other solution is also given. Finally, a complete base of material scheduling solution has been implemented, which provides more references for decision makers. This paper considers the lowest cost as the goal and gives a more suitable alternative from the perspective of input‐output efficiency in combination with the actual production conditions, which is a good extension of the P‐graph.
- 25 November 2020
- Published by Wiley in The Canadian Journal of Chemical Engineering
- Vol. 99 (S1) , S443-S457
Solutions selection based on the P‐graph integrated data envelopment analysis for material scheduling in the ethylene production
Material scheduling is significant in the ethylene production process. However, factors such as the production scale and the technology also affect the choice of material scheduling solutions. Therefore, this paper proposes a novel P‐graph methodology integrated data envelopment analysis (DEA) for the solutions selection of material scheduling. First, based on the basic procedure, a scheduling superstructure model expanding from the time dimension is built. With the cost as the objective function, the optimal and partially feasible scheduling solutions are generated based on the P‐graph, and the results are analyzed in detail with reference to ISA‐95. Then the DEA is used to analyze the indicators of material consumption and product yields to give a selection strategy from the input‐output perspective. The optimal solution and suboptimal solution sets are evaluated and analyzed, and decision making units (DMUs) with the highest score are calculated. Based on the scheduling solution with the highest score and relatively low cost, the potential adjustment of other solution is also given. Finally, a complete base of material scheduling solution has been implemented, which provides more references for decision makers. This paper considers the lowest cost as the goal and gives a more suitable alternative from the perspective of input‐output efficiency in combination with the actual production conditions, which is a good extension of the P‐graph.
- 28 August 2020
- Published by Wiley in The Canadian Journal of Chemical Engineering
- Vol. 99 (2) , 530-542
An ontology‐based procedure knowledge framework for the process industry
Process industry enterprises rely heavily on expert experience in production, and expert knowledge is stored in multiple formats like, pictures, texts, videos, etc. Several isolated islands of information or knowledge are formed, and they are difficult to store, share, and expand upon. Therefore, the same procedure appears multiple times in different application scenarios, such as optimization scheduling, optimization operation, or fault diagnosis. If redundant knowledge is paid too much attention, decision‐makers will not be able to comprehensively consider business knowledge. Thus, a novel framework is proposed for the process industry to manage procedure knowledge. This paper first divides the detailed procedure of process plants into four layers, that is, raw materials, intermediate materials, operation, and products based on the P‐graph theory, which involves virtual hierarchies, nodes, and operations. Second, the domain ontology‐based procedure knowledge model is constructed. Finally, two experimental cases, the Tennessee Eastman (TE) and the ethylene production process, are studied to verify the procedure knowledge framework (PKF). The PKF provides a useful foundation for the subsequent construction of a superstructure model based on the P‐graph theory and is different from the previous industrial process industrial ontology model. The PKF has a theoretical basis for simulation calculation and makes future work based on PKF more accurate and interpretable.
- 28 August 2020
- Published by Wiley in The Canadian Journal of Chemical Engineering
- Vol. 99 (2) , 530-542
An ontology‐based procedure knowledge framework for the process industry
Process industry enterprises rely heavily on expert experience in production, and expert knowledge is stored in multiple formats like, pictures, texts, videos, etc. Several isolated islands of information or knowledge are formed, and they are difficult to store, share, and expand upon. Therefore, the same procedure appears multiple times in different application scenarios, such as optimization scheduling, optimization operation, or fault diagnosis. If redundant knowledge is paid too much attention, decision‐makers will not be able to comprehensively consider business knowledge. Thus, a novel framework is proposed for the process industry to manage procedure knowledge. This paper first divides the detailed procedure of process plants into four layers, that is, raw materials, intermediate materials, operation, and products based on the P‐graph theory, which involves virtual hierarchies, nodes, and operations. Second, the domain ontology‐based procedure knowledge model is constructed. Finally, two experimental cases, the Tennessee Eastman (TE) and the ethylene production process, are studied to verify the procedure knowledge framework (PKF). The PKF provides a useful foundation for the subsequent construction of a superstructure model based on the P‐graph theory and is different from the previous industrial process industrial ontology model. The PKF has a theoretical basis for simulation calculation and makes future work based on PKF more accurate and interpretable.