Xianliang Zhou
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Research Interests
Xianliang Zhou has a total of 4 co-authors. Here are the top co-authors by number of shared publications:
- Changwu Liu
College of Water Resource and Hydropower, Sichuan University, Chengdu, China
1 shared publication - Jun Zhu
State Key Laboratory of Hydraulics and Mountain River Engineering, Sichuan University, Chengdu 610065, China
1 shared publication - Ping Wang
Work Safety Key Lab on Prevention and Control of Gas and Roof Disasters for Southern Goal Mines, Hunan University of Science and Technology, Xiangtan 411201, China
1 shared publication - Yuanjun Ma
State Key Laboratory of Hydraulics and Mountain River Engineering, Sichuan University, Chengdu, China
1 shared publication
Latest Publications
- Open Access
- 6 September 2020
- Published by MDPI AG in Applied Sciences
- Vol. 10 (18) , 6195
Blast Vibration Control in A Hydropower Station for the Safety of Adjacent Structure
The transverse cofferdam in Xiangjiaba hydropower station was a water retaining concrete structure with a length of 126 m, a width of 12 m, and a height of 25.2 m, consisting of masonry, plain concrete structure (PC), and roller compacted concrete (RCC), which had to be demolished by blasting after the dam was built. There were many precise instruments nearby the cofferdam which had strict restrictions on blasting vibration. Therefore, the cofferdam was divided into six blasting regions, including land blasting and underwater blasting. Blasting parameters and blasting network structure were accurately designed and continuously optimized through blast-induced vibration test results. At nine measurement points in different locations, 57 blast vibration data were recorded. Consequently, 1386 holes with an explosive weight of 9641.3 kg were detonated in land blasting. The highest levels of vibration were recorded as 8.74 cm/s in the desilting tunnel on the right of the cofferdam. The explosives up to 11887.7 kg were detonated in an underwater blasting. According to the analysis of the law of vibration attenuation, the blast vibration value was reduced to 7.65 cm/s. The results showed that the research on the attenuation law of blasting vibration can effectively increase the charge weight per delay and control the blast-induced vibration. Consequently, the peak particle velocity (PPV) of underwater blasting could be predicted by analyzing the PPV of land blasting in same structure, which provided the basis for the design of underwater blasting parameters. A reliable method for cofferdam demolition in hydropower station was proposed, which provided a reference for similar projects.
- 6 September 2020
- Published by MDPI AG in Applied Sciences
- Vol. 10 (18) , 6195
Open AccessBlast Vibration Control in A Hydropower Station for the Safety of Adjacent Structure
The transverse cofferdam in Xiangjiaba hydropower station was a water retaining concrete structure with a length of 126 m, a width of 12 m, and a height of 25.2 m, consisting of masonry, plain concrete structure (PC), and roller compacted concrete (RCC), which had to be demolished by blasting after the dam was built. There were many precise instruments nearby the cofferdam which had strict restrictions on blasting vibration. Therefore, the cofferdam was divided into six blasting regions, including land blasting and underwater blasting. Blasting parameters and blasting network structure were accurately designed and continuously optimized through blast-induced vibration test results. At nine measurement points in different locations, 57 blast vibration data were recorded. Consequently, 1386 holes with an explosive weight of 9641.3 kg were detonated in land blasting. The highest levels of vibration were recorded as 8.74 cm/s in the desilting tunnel on the right of the cofferdam. The explosives up to 11887.7 kg were detonated in an underwater blasting. According to the analysis of the law of vibration attenuation, the blast vibration value was reduced to 7.65 cm/s. The results showed that the research on the attenuation law of blasting vibration can effectively increase the charge weight per delay and control the blast-induced vibration. Consequently, the peak particle velocity (PPV) of underwater blasting could be predicted by analyzing the PPV of land blasting in same structure, which provided the basis for the design of underwater blasting parameters. A reliable method for cofferdam demolition in hydropower station was proposed, which provided a reference for similar projects.