Yernur Omarbekov
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Yernur Omarbekov has a total of 4 co-authors. Here are the top co-authors by number of shared publications:
Research Institute of Comprehensive Exploitation of Mineral Resources Russian Academy of Sciences
2 shared publications- S. B. Aliev
Институт проблем комплексного освоения недр им. академика Н.В. Мельникова РАН
2 shared publications Satbayev University
2 shared publications- Khalidilla Yussupov
Satbayev Univ, Alma Ata 50013, Kazakhstan
1 shared publication
Latest Publications
- 25 June 2021
- Published by Institute of Metallurgy and Ore Benefication (Publications) in Kompleksnoe Ispolzovanie Mineralnogo Syra = Complex Use of Mineral Resources
- Vol. 317 (2) , 30-36
Influence of the "pumping wells" technology on the indicators of in situ leaching of uranium
This paper presents the results of experimental research applications "pumping wells" when the mining of uranium deposits by the method of In-Situ Leach Mining ISL in mine "Karatau". Analyzed the experience results of uranium deposits development in the conditions of high-pressure nature of groundwater. The experimental works have been conducted using proposed “pumping wells” technology. The implementation of the proposed "pumping well" technology did not affect the Me and pH values in comparison with the actual technology, but it did reduce the production cost. It is proved that by using the proposed technology and schemes in conditions of high-pressure nature of groundwater reduces the cost of procurement of cables, significantly reducing the cost of acquisition of submersible pumps, savings in the end cap.
- 25 June 2021
- Published by Institute of Metallurgy and Ore Benefication (Publications) in Kompleksnoe Ispolzovanie Mineralnogo Syra = Complex Use of Mineral Resources
- Vol. 317 (2) , 30-36
Influence of the "pumping wells" technology on the indicators of in situ leaching of uranium
This paper presents the results of experimental research applications "pumping wells" when the mining of uranium deposits by the method of In-Situ Leach Mining ISL in mine "Karatau". Analyzed the experience results of uranium deposits development in the conditions of high-pressure nature of groundwater. The experimental works have been conducted using proposed “pumping wells” technology. The implementation of the proposed "pumping well" technology did not affect the Me and pH values in comparison with the actual technology, but it did reduce the production cost. It is proved that by using the proposed technology and schemes in conditions of high-pressure nature of groundwater reduces the cost of procurement of cables, significantly reducing the cost of acquisition of submersible pumps, savings in the end cap.
- 25 March 2021
- Published by Institute of Metallurgy and Ore Benefication (Publications) in Kompleksnoe Ispolzovanie Mineralnogo Syra = Complex Use of Mineral Resources
- Vol. 316 (1) , 40-45
Technological improvement of the scheme unit reception and distribution of solution under conditions of high-pressure nature of groundwater
This paper analyses the experience uranium deposits mine development under conditions of highpressure nature of groundwater proposed technology "pumping wells" and upgrading technological scheme unit receiving and distribution of the solution. The results of experimental study of the use of "pumping wells" in mining deposits of uranium by in-situ leaching mine "Karatau". It is proved that by using the proposed technology and circuits under conditions of the high groundwater pressure reduces the cost of procurement of cables, significantly reduced the cost of acquisition of submersible pumps, savings in the end cap. In practice, one processing unit is equipped with one unit for receiving and distributing the solution, therefore, a leaching solution with the same acidity is supplied to all injection wells. To avoid such cases requires selective supply of different concentrations of acid with the different indicators pH. The modernization of the scheme of the unit for receiving and distributing the solution was carried out by connecting two bypass lines, where one bypass line is designed to transfer the injection wells to the pumping one, and the second one is to transfer the pumping wells to the pumping one. By connecting the two bypass lines, it will be possible to supply a leach solution with a higher acid concentration, selectively to any injection well. As a result, acid consumption will decrease due to its selective supply and pH values in wells will be balanced.
- 25 March 2021
- Published by Institute of Metallurgy and Ore Benefication (Publications) in Kompleksnoe Ispolzovanie Mineralnogo Syra = Complex Use of Mineral Resources
- Vol. 316 (1) , 40-45
Technological improvement of the scheme unit reception and distribution of solution under conditions of high-pressure nature of groundwater
This paper analyses the experience uranium deposits mine development under conditions of highpressure nature of groundwater proposed technology "pumping wells" and upgrading technological scheme unit receiving and distribution of the solution. The results of experimental study of the use of "pumping wells" in mining deposits of uranium by in-situ leaching mine "Karatau". It is proved that by using the proposed technology and circuits under conditions of the high groundwater pressure reduces the cost of procurement of cables, significantly reduced the cost of acquisition of submersible pumps, savings in the end cap. In practice, one processing unit is equipped with one unit for receiving and distributing the solution, therefore, a leaching solution with the same acidity is supplied to all injection wells. To avoid such cases requires selective supply of different concentrations of acid with the different indicators pH. The modernization of the scheme of the unit for receiving and distributing the solution was carried out by connecting two bypass lines, where one bypass line is designed to transfer the injection wells to the pumping one, and the second one is to transfer the pumping wells to the pumping one. By connecting the two bypass lines, it will be possible to supply a leach solution with a higher acid concentration, selectively to any injection well. As a result, acid consumption will decrease due to its selective supply and pH values in wells will be balanced.
- 1 January 2020
- Published by Dnipro University of Technology in Mining of Mineral Deposits
- Vol. 14 (3) , 112-118
Improving the technology of uranium mining under the conditions of high groundwater pressure
- 1 January 2020
- Published by Dnipro University of Technology in Mining of Mineral Deposits
- Vol. 14 (3) , 112-118
Improving the technology of uranium mining under the conditions of high groundwater pressure