Keita Shimizu
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Keita Shimizu has a total of 2 co-authors. Here are the top co-authors by number of shared publications:
- Tadashi Yamada
中央大学研究開発機
2 shared publications - Tomohito J. Yamada
Faculty of Engineering, Hokkaido University
2 shared publications
Latest Publications
- Open Access
Introduction of Confidence Interval Based on Probability Limit Method Test into Non-Stationary Hydrological Frequency Analysis
Nonstationarity in hydrological variables has been identified throughout Japan in recent years. As a result, the reliability of designs derived from using method based on the assumption of stationary might deteriorate. Non-stationary hydrological frequency analysis is among the measures to counter this possibility. Using this method, time variations in the probable hydrological quantity can be estimated using a non-stationary extreme value distribution model with time as an explanatory variable. In this study, we build a new method for constructing the confidence interval regarding the non-stationary extreme value distribution by applying a theory of probability limit method test. Furthermore, by introducing a confidence interval based on probability limit method test into the non-stationary hydrological frequency analysis, uncertainty in design rainfall because of lack of observation information was quantified, and it is shown that assessment pertaining to both the occurrence risk of extremely heavy rainfall and changes in the trend of extreme rainfall accompanied with climate change is possible.
Open AccessIntroduction of Confidence Interval Based on Probability Limit Method Test into Non-Stationary Hydrological Frequency Analysis
Nonstationarity in hydrological variables has been identified throughout Japan in recent years. As a result, the reliability of designs derived from using method based on the assumption of stationary might deteriorate. Non-stationary hydrological frequency analysis is among the measures to counter this possibility. Using this method, time variations in the probable hydrological quantity can be estimated using a non-stationary extreme value distribution model with time as an explanatory variable. In this study, we build a new method for constructing the confidence interval regarding the non-stationary extreme value distribution by applying a theory of probability limit method test. Furthermore, by introducing a confidence interval based on probability limit method test into the non-stationary hydrological frequency analysis, uncertainty in design rainfall because of lack of observation information was quantified, and it is shown that assessment pertaining to both the occurrence risk of extremely heavy rainfall and changes in the trend of extreme rainfall accompanied with climate change is possible.
- Open Access
Uncertainty Evaluation in Hydrological Frequency Analysis Based on Confidence Interval and Prediction Interval
The shortage of extreme rainfall data gives substantial uncertainty to design rainfalls and causes predictions for torrential rainfall to deviate strongly from adopted probability distributions used in river planning. These torrential rainfalls are treated as outliers which existing studies do not evaluate. However, probability limit method test which its acceptance region expresses with high accuracy the range where observed ith order statistics could realize. Confidence interval which quantifies uncertainty of adopted distributions can be constructed by assuming that these critical values in both sides of the adopted region follow the same function form applied to actual observed data. Furthermore, its validity is proved through comparison of confidence interval derived from ensemble downscaling calculations. In addition, these critical values are almost in accordance with outliers in samples from the ensemble downscaling calculations. Therefore, prediction interval which expresses the range that an unknown observed datum can take is constructed by extrapolating the critical values for limit estimation of a future datum. In this paper, quantification method of uncertainty of design rainfall and occurrence risk of outliers in the traditional framework, using the proposed confidence interval and prediction interval, is shown. Moreover, their application to future climate by using Bayesian statistics is explained.
Open AccessUncertainty Evaluation in Hydrological Frequency Analysis Based on Confidence Interval and Prediction Interval
The shortage of extreme rainfall data gives substantial uncertainty to design rainfalls and causes predictions for torrential rainfall to deviate strongly from adopted probability distributions used in river planning. These torrential rainfalls are treated as outliers which existing studies do not evaluate. However, probability limit method test which its acceptance region expresses with high accuracy the range where observed ith order statistics could realize. Confidence interval which quantifies uncertainty of adopted distributions can be constructed by assuming that these critical values in both sides of the adopted region follow the same function form applied to actual observed data. Furthermore, its validity is proved through comparison of confidence interval derived from ensemble downscaling calculations. In addition, these critical values are almost in accordance with outliers in samples from the ensemble downscaling calculations. Therefore, prediction interval which expresses the range that an unknown observed datum can take is constructed by extrapolating the critical values for limit estimation of a future datum. In this paper, quantification method of uncertainty of design rainfall and occurrence risk of outliers in the traditional framework, using the proposed confidence interval and prediction interval, is shown. Moreover, their application to future climate by using Bayesian statistics is explained.