Jiang Xiangming
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Jiang Xiangming has a total of 4 co-authors. Here are the top co-authors by number of shared publications:
- Jiahao Wang
Department of Municipal Engineering Design, Tongji Architectural Design (Group) Co., Ltd., Shanghai 200092, China
1 shared publication - Shuang Hui
Environmental Engineering Company, China Design Group Co., Ltd., Nanjing 210001, China
1 shared publication - Wanghua Sui
School of Resources and Geosciences, Institute of Mine Water Hazard Prevention and Controlling Technology, China University of Mining and Technology, Xuzhou, China
1 shared publication - Zhiyuan Shi
School of Resources and Geosciences, Institute of Mine Water Hazards Prevention and Controlling Technology, China University of Mining and Technology, Xuzhou 221116, China
1 shared publication
Latest Publications
- 25 September 2024
- Published by Springer Nature
- p. 439-450
Mechanism of Water Inrush in Deep Coal Mining Based on Dark Structure
- 25 September 2024
- Published by Springer Nature
- p. 439-450
Mechanism of Water Inrush in Deep Coal Mining Based on Dark Structure
- Open Access
Influence of the Aggregate-Pouring Sequence on the Efficiency of Plugging Inundated Tunnels through Drilling Ground Boreholes
This paper presents an experimental and field investigation on the efficiency of plugging by pouring aggregate in different sequences through multiple boreholes in a tunnel with flowing water. There have been controversies surrounding the selection of the pouring order for different particle sizes of aggregates and the order in different boreholes. A visualized experimental setup is used to investigate the influence of the pouring orders on the efficiency of plugging through multiple boreholes under the flowing-water condition. A case study of the salvage of a flooded mine using ground directional boreholes was investigated and compared with the experimental results. The water-pressure difference at the aggregate-capping moment, when fine aggregate was poured first and coarse aggregate later, was relatively small, compared to that when fine aggregate was poured upstream and coarse aggregate, downstream. The result implies that the efficiency of plugging with the order of pouring fine aggregate first and coarse aggregate later in different boreholes is better than that with the order of pouring fine aggregate upstream and coarse aggregate downstream. When the poured aggregate is about to be capped, increasing the pouring intensity with the same or a larger particle size is more conducive to capping. The case study shows that pouring fine materials in the early stage reduced the cross-sectional area; in the later stage, the aggregate particle size was gradually increased, which can be helpful in forming an effective water-barrier section in the tunnel. The pouring of aggregate provided a base for cement grouting to form a water-plug section with a length of 106 m, resulting in a sealing efficiency of 100% for the case.
Open AccessInfluence of the Aggregate-Pouring Sequence on the Efficiency of Plugging Inundated Tunnels through Drilling Ground Boreholes
This paper presents an experimental and field investigation on the efficiency of plugging by pouring aggregate in different sequences through multiple boreholes in a tunnel with flowing water. There have been controversies surrounding the selection of the pouring order for different particle sizes of aggregates and the order in different boreholes. A visualized experimental setup is used to investigate the influence of the pouring orders on the efficiency of plugging through multiple boreholes under the flowing-water condition. A case study of the salvage of a flooded mine using ground directional boreholes was investigated and compared with the experimental results. The water-pressure difference at the aggregate-capping moment, when fine aggregate was poured first and coarse aggregate later, was relatively small, compared to that when fine aggregate was poured upstream and coarse aggregate, downstream. The result implies that the efficiency of plugging with the order of pouring fine aggregate first and coarse aggregate later in different boreholes is better than that with the order of pouring fine aggregate upstream and coarse aggregate downstream. When the poured aggregate is about to be capped, increasing the pouring intensity with the same or a larger particle size is more conducive to capping. The case study shows that pouring fine materials in the early stage reduced the cross-sectional area; in the later stage, the aggregate particle size was gradually increased, which can be helpful in forming an effective water-barrier section in the tunnel. The pouring of aggregate provided a base for cement grouting to form a water-plug section with a length of 106 m, resulting in a sealing efficiency of 100% for the case.