Zhao Jin
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Zhao Jin has a total of 22 co-authors. Here are the top co-authors by number of shared publications:
- Bingda Zhang
The Key Laboratory of Smart Grid of Ministry of Education, Tianjin University, Tianjin 300072, China
7 shared publications - Yanjie Wu
The Key Laboratory of Smart Grid of Ministry of Education, Tianjin University, Tianjin 300072, China
3 shared publications - Shuyuan Wang
The Key Laboratory of Smart Grid of Ministry of Education, Tianjin University, Tianjin 300072, China
2 shared publications - Sijia Tu
The Key Laboratory of Smart Grid of Ministry of Education, Tianjin University, Tianjin 300072, China
2 shared publications - Yang Wang
The Key Laboratory of Smart Grid of Ministry of Education, Tianjin University, Tianjin 300072, China
2 shared publications Bd. Zhang
1 shared publication
Latest Publications
- Open Access
Component-Oriented Modeling Method for Real-Time Simulation of Power Systems
This paper proposes a component-oriented modeling method for power system simulation, which optimizes the modeling process of the FPGA-based real-time digital simulator (FRTDS) to enhance its computational efficiency. In this paper, a component modeling method for various types of elements in the power system is presented, which makes the modeling process in FRTDS more user-friendly and highly scalable. By applying the concepts of combination and reconstruction of components to electrical components, the component-oriented modeling method becomes better suited for combined elements with fixed connection modes and elements that require online model replacement in the power system. Utilizing the characteristics of component-oriented modeling, the variable declaration structure and node elimination strategy in the simulation script are optimized, enabling the simulation script to fit better with the hardware structure of FRTDS. Additionally, a substation is simulated in FRTDS with a simulation step size of 50 µs, thus verifying the correctness of the component-oriented modeling method and its ability to improve the computational power of FRTDS.
Open AccessComponent-Oriented Modeling Method for Real-Time Simulation of Power Systems
This paper proposes a component-oriented modeling method for power system simulation, which optimizes the modeling process of the FPGA-based real-time digital simulator (FRTDS) to enhance its computational efficiency. In this paper, a component modeling method for various types of elements in the power system is presented, which makes the modeling process in FRTDS more user-friendly and highly scalable. By applying the concepts of combination and reconstruction of components to electrical components, the component-oriented modeling method becomes better suited for combined elements with fixed connection modes and elements that require online model replacement in the power system. Utilizing the characteristics of component-oriented modeling, the variable declaration structure and node elimination strategy in the simulation script are optimized, enabling the simulation script to fit better with the hardware structure of FRTDS. Additionally, a substation is simulated in FRTDS with a simulation step size of 50 µs, thus verifying the correctness of the component-oriented modeling method and its ability to improve the computational power of FRTDS.
- Open Access
FPGA-Based Real-Time Simulation of Dual-Port Submodule MMC–HVDC System
Aiming at the problems of the high switch numbers, complex working mechanisms, and complicated real-time simulation of modular multilevel converters (MMCs) composed of dual-port submodules, in this study, we designed a unified equivalent model of the multiple submodule network by analyzing the combination of parallel submodules in the bridge arm. The proposed model decouples the submodules that do not affect each other in the subnetwork calculation process, thereby reducing the number of prestored parameters in the subnetwork simulation. In the Xilinx Virtex-7 FPGA VC709 (Xilinx Corporation, San Jose, CA, USA) development board, we replaced the inline computation combined with the prestorage of parameters with the proposed equivalent model to optimize the execution unit structure and redesigned the FPGA-Based Real-Time Digital Solver (FRTDS). Taking the P-FBSM-based MMC–HVDC system as the simulation object, we performed a real-time simulation with a step size of 10 μs, which verified the effectiveness of the proposed model and the improvement in the hardware. We compared the results with the offline MATLAB/Simulink simulation results to verify the accuracy of the simulation.
Open AccessFPGA-Based Real-Time Simulation of Dual-Port Submodule MMC–HVDC System
Aiming at the problems of the high switch numbers, complex working mechanisms, and complicated real-time simulation of modular multilevel converters (MMCs) composed of dual-port submodules, in this study, we designed a unified equivalent model of the multiple submodule network by analyzing the combination of parallel submodules in the bridge arm. The proposed model decouples the submodules that do not affect each other in the subnetwork calculation process, thereby reducing the number of prestored parameters in the subnetwork simulation. In the Xilinx Virtex-7 FPGA VC709 (Xilinx Corporation, San Jose, CA, USA) development board, we replaced the inline computation combined with the prestorage of parameters with the proposed equivalent model to optimize the execution unit structure and redesigned the FPGA-Based Real-Time Digital Solver (FRTDS). Taking the P-FBSM-based MMC–HVDC system as the simulation object, we performed a real-time simulation with a step size of 10 μs, which verified the effectiveness of the proposed model and the improvement in the hardware. We compared the results with the offline MATLAB/Simulink simulation results to verify the accuracy of the simulation.
- 23 December 2021
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 2585-2592
Multi-rate Real Time Simulation of Power System with Combined Heating and Power
The real-time simulation of the power system with integrated energy of combined heat and power faces the contradiction between simulation scale and simulation step length. After analyzing the model of the key links in the system, this paper divides the system into three subsystems: power system, gas turbine system, and heating system according to different time scales. The coupling is decoupled by asynchronous data interaction, and different simulation steps are used to simulate the subsystems. When solving the power system, two multi-rate methods based on explicit and implicit hybrid integration and Norton equivalent are used. In order to ensure the real-time performance of the simulation, for the large-step sub-network with a large amount of calculation in the Norton equivalent method, a calculation method which solves the large step sub-network before the small-step sub-network is given. Finally, on the real-time simulation platform (FRTDS), the power system with integrated energy of combined heat and power is divided into different subsystems, and simulated at four rates. The simulation results are compared with the single-rate simulation, which verifies the feasibility of the multi-rate real-time simulation scheme.
- 23 December 2021
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 2585-2592
Multi-rate Real Time Simulation of Power System with Combined Heating and Power
The real-time simulation of the power system with integrated energy of combined heat and power faces the contradiction between simulation scale and simulation step length. After analyzing the model of the key links in the system, this paper divides the system into three subsystems: power system, gas turbine system, and heating system according to different time scales. The coupling is decoupled by asynchronous data interaction, and different simulation steps are used to simulate the subsystems. When solving the power system, two multi-rate methods based on explicit and implicit hybrid integration and Norton equivalent are used. In order to ensure the real-time performance of the simulation, for the large-step sub-network with a large amount of calculation in the Norton equivalent method, a calculation method which solves the large step sub-network before the small-step sub-network is given. Finally, on the real-time simulation platform (FRTDS), the power system with integrated energy of combined heat and power is divided into different subsystems, and simulated at four rates. The simulation results are compared with the single-rate simulation, which verifies the feasibility of the multi-rate real-time simulation scheme.
- Open Access
High Flexibility Hybrid Architecture Real-Time Simulation Platform Based on Field-Programmable Gate Array (FPGA)
With the expansion of system scale and the reduction in simulation step size, the design of a power system real-time simulation platform faces many difficulties. The interactive operation of real-time simulation presents the characteristics of phased and centralized. This paper proposes selecting the appropriate simulation method for each sub-network according to the system operation requirements, and the sub-network simulation method can be changed with the change in system operation requirements in the simulation process. In order to change the sub-network simulation method in the simulation process, a high flexibility hybrid architecture real-time simulation platform based on FPGA was designed. The main body of the architecture runs in the high control mode of instruction flow and uses instruction flexibility to realize the requirement of changing methods. The algorithm modularity architecture is used as an auxiliary architecture to reduce the instruction cost and increase the computing power. Finally, the hybrid architecture real-time simulation platform was implemented in the Xilinx VC709 board (Xilinx corporation, San Jose, CA, USA), and the verification results show that under the same system scale, the hybrid architecture simulation platform combined with simulation method changing realizes shorter simulation step and complex interactive operation.
Open AccessHigh Flexibility Hybrid Architecture Real-Time Simulation Platform Based on Field-Programmable Gate Array (FPGA)
With the expansion of system scale and the reduction in simulation step size, the design of a power system real-time simulation platform faces many difficulties. The interactive operation of real-time simulation presents the characteristics of phased and centralized. This paper proposes selecting the appropriate simulation method for each sub-network according to the system operation requirements, and the sub-network simulation method can be changed with the change in system operation requirements in the simulation process. In order to change the sub-network simulation method in the simulation process, a high flexibility hybrid architecture real-time simulation platform based on FPGA was designed. The main body of the architecture runs in the high control mode of instruction flow and uses instruction flexibility to realize the requirement of changing methods. The algorithm modularity architecture is used as an auxiliary architecture to reduce the instruction cost and increase the computing power. Finally, the hybrid architecture real-time simulation platform was implemented in the Xilinx VC709 board (Xilinx corporation, San Jose, CA, USA), and the verification results show that under the same system scale, the hybrid architecture simulation platform combined with simulation method changing realizes shorter simulation step and complex interactive operation.
- Open Access
- 25 May 2020
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Access
- Vol. 8, 155797-155810
An FRTDS Real-Time Simulation Optimized Task Scheduling Algorithm Based on Reinforcement Learning
This paper presents a deep reinforcement learning (DRL)-based task scheduling algorithm that is applied to an FPGA-based real-time digital simulation (FRTDS) system to generate arrangements to minimize the makespan of a task sequence with limited resources. The algorithm has two parts, which are synthetic cost construction and DRL processing to make arrangements. The synthetic cost represents the cost of different selections of arrangements in both resource usage and blockage arranging probability. This study uses the cost to measure the state-action value function to process the deep Q network (DQN) procedure to generate an optimized scheduling strategy. We establish the reinforcement learning strategy generation process by instantiating the computing components in the hardware as agents, and RAM resources and communication I/O ports as environment. A hardware-design-based decision rule is constructed to ensure that the computing variables are distributed as evenly as possible in storage, while making full use of the pipeline characteristics of FPGA. A compiler is written to generate an FRTDS binary stream to drive FRTDS. Accuracy and performance of the proposed method are verified and evaluated. We present simulation results of the modeling method, as well as from a classic method 20. Comparing these results, the makespan obtained by the proposed method is significantly shorter. It corresponds to the possibility of having higher computing power and dealing with larger-scale real-time simulation.
- 25 May 2020
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Access
- Vol. 8, 155797-155810
Open AccessAn FRTDS Real-Time Simulation Optimized Task Scheduling Algorithm Based on Reinforcement Learning
This paper presents a deep reinforcement learning (DRL)-based task scheduling algorithm that is applied to an FPGA-based real-time digital simulation (FRTDS) system to generate arrangements to minimize the makespan of a task sequence with limited resources. The algorithm has two parts, which are synthetic cost construction and DRL processing to make arrangements. The synthetic cost represents the cost of different selections of arrangements in both resource usage and blockage arranging probability. This study uses the cost to measure the state-action value function to process the deep Q network (DQN) procedure to generate an optimized scheduling strategy. We establish the reinforcement learning strategy generation process by instantiating the computing components in the hardware as agents, and RAM resources and communication I/O ports as environment. A hardware-design-based decision rule is constructed to ensure that the computing variables are distributed as evenly as possible in storage, while making full use of the pipeline characteristics of FPGA. A compiler is written to generate an FRTDS binary stream to drive FRTDS. Accuracy and performance of the proposed method are verified and evaluated. We present simulation results of the modeling method, as well as from a classic method 20. Comparing these results, the makespan obtained by the proposed method is significantly shorter. It corresponds to the possibility of having higher computing power and dealing with larger-scale real-time simulation.
- Open Access
A New FPGA-Based Real-Time Digital Solver for Power System Simulation
Considering the rational use of field programmable gate array (FPGA) resources, this paper proposes a new FPGA-based real-time digital solver (FRTDS) for power system simulation. Based on the relationship between the number of computing components, the operating frequency, and the pipeline length, the best selection principle is given. By analyzing the implementation method of the Multi-Port Read/Write Circuit, the computing formula of the Look-Up-Table (LUT) consumption was derived. Given the excessive use of LUTs in the original computing components, the computing components were assembled in a single typical arithmetic expression of the power system simulation program, as the basic computing formula was characterized by a subset of the typical computing formula and multiple uses of the same variable. Data communication between different computing components was realized by using Multi-Port Input Circuits that share some outputs of read controller, and Multi-Port Output Circuits, which share some outputs of computing cores. According to the test results of original FRTDS and new FRTDS, it was found that the solution proposed in this paper had a shorter ideal simulation time and a higher parallel computing capability, which was very suitable for real-time digital simulation of power systems.
Open AccessA New FPGA-Based Real-Time Digital Solver for Power System Simulation
Considering the rational use of field programmable gate array (FPGA) resources, this paper proposes a new FPGA-based real-time digital solver (FRTDS) for power system simulation. Based on the relationship between the number of computing components, the operating frequency, and the pipeline length, the best selection principle is given. By analyzing the implementation method of the Multi-Port Read/Write Circuit, the computing formula of the Look-Up-Table (LUT) consumption was derived. Given the excessive use of LUTs in the original computing components, the computing components were assembled in a single typical arithmetic expression of the power system simulation program, as the basic computing formula was characterized by a subset of the typical computing formula and multiple uses of the same variable. Data communication between different computing components was realized by using Multi-Port Input Circuits that share some outputs of read controller, and Multi-Port Output Circuits, which share some outputs of computing cores. According to the test results of original FRTDS and new FRTDS, it was found that the solution proposed in this paper had a shorter ideal simulation time and a higher parallel computing capability, which was very suitable for real-time digital simulation of power systems.
- Open Access
FPGA-Based Real-Time Digital Solver for Electro-Mechanical Transient Simulation
A field-programmable gate array (FPGA)-based digital solver for real-time electromechanical transient simulation is designed in this paper. The solving process for a device or sub-network in an electromechanical transient simulation is packaged into the orders in soft function solvers. The orders are reused by soft function solvers that are invoked by microprocessor cores. The data exchange between the microprocessor cores and soft function solvers is enhanced through explicit and implicit channels. The orders of the microprocessor cores are stored in the synchronous dynamic random access memory on the FPGA board, which solves the problem of insufficient storage space for the orders in electromechanical transient simulation. A real-time digital solver for electromechanical transient simulation, whose feasibility is verified by a simulation of part of the power system in East China, is successfully constructed by applying a small number of microprocessor cores and multiple soft function solvers.
Open AccessFPGA-Based Real-Time Digital Solver for Electro-Mechanical Transient Simulation
A field-programmable gate array (FPGA)-based digital solver for real-time electromechanical transient simulation is designed in this paper. The solving process for a device or sub-network in an electromechanical transient simulation is packaged into the orders in soft function solvers. The orders are reused by soft function solvers that are invoked by microprocessor cores. The data exchange between the microprocessor cores and soft function solvers is enhanced through explicit and implicit channels. The orders of the microprocessor cores are stored in the synchronous dynamic random access memory on the FPGA board, which solves the problem of insufficient storage space for the orders in electromechanical transient simulation. A real-time digital solver for electromechanical transient simulation, whose feasibility is verified by a simulation of part of the power system in East China, is successfully constructed by applying a small number of microprocessor cores and multiple soft function solvers.
- Open Access
Electromagnetic Transient-Transient Stability Analysis Hybrid Real-Time Simulation Method of Variable Area of Interest
To make the object of electromagnetic transient (EMT) simulation flexible to change, the authors propose using the method of electromagnetic transient-transient stability analysis (TSA) hybrid real-time simulation of the variable area of interest. The area where the fault is to be set, or where the operation takes place, is defined as the area of interest. The simulation object is divided into multiple sub-networks. The EMT simulation range is determined according to the voltage drop depth at the boundary of the adjacent sub-network caused by the three-phase short-circuit fault at the boundary of an area of interest. The Norton equivalent is obtained by using the sub-network as a basic unit. The electromagnetic sub-network forms its own Norton equivalent on the TSA side by means of the Norton equivalent admittance of its TSA model. Based on this, the overall framework of hybrid real-time simulation of the variable area of interest is constructed. The fundamental phasor prediction and Norton equivalent current source prediction are adopted to reduce the interface error. The performance of the proposed method in terms of feasibility, flexibility, and effectiveness have been verified by the simulation studies on the IEEE 118-bus system.
Open AccessElectromagnetic Transient-Transient Stability Analysis Hybrid Real-Time Simulation Method of Variable Area of Interest
To make the object of electromagnetic transient (EMT) simulation flexible to change, the authors propose using the method of electromagnetic transient-transient stability analysis (TSA) hybrid real-time simulation of the variable area of interest. The area where the fault is to be set, or where the operation takes place, is defined as the area of interest. The simulation object is divided into multiple sub-networks. The EMT simulation range is determined according to the voltage drop depth at the boundary of the adjacent sub-network caused by the three-phase short-circuit fault at the boundary of an area of interest. The Norton equivalent is obtained by using the sub-network as a basic unit. The electromagnetic sub-network forms its own Norton equivalent on the TSA side by means of the Norton equivalent admittance of its TSA model. Based on this, the overall framework of hybrid real-time simulation of the variable area of interest is constructed. The fundamental phasor prediction and Norton equivalent current source prediction are adopted to reduce the interface error. The performance of the proposed method in terms of feasibility, flexibility, and effectiveness have been verified by the simulation studies on the IEEE 118-bus system.
- Open Access
A Real-Time Digital Solver for Smart Substation Based on Orders
In order to expand the simulation scale of smart substation, a simulation model of the inlet-outlet line unit, as described by the 0/108 S conductance for multivalued coefficients pre-storage is presented in this paper. As a part of orders decomposition, the address conversion circuit for multivalued coefficients can reduce the computational burden of processing elements. For the convenience of the generalization of the real-time digital solver based on FPGA (FRTDS, FPGA: Field–Programmable Gate Array), the address conversion circuit for multivalued coefficients is matched with the guide word, the formation module of sampled value (SV) packet, and the resolution module of generic object oriented substation event (GOOSE) packet are associated with the application identification (APPID) in the Ethernet frame. The address conversion circuit for multivalued coefficients, the formation module of SV packet, and the resolution module of GOOSE packet are reconstructed via the orders. A hardware-in-the-loop real-time simulation platform for smart substation is built based on the novel FRTDS. A case is given to demonstrate the simulation calculating capability and the hardware-in-the-loop ability of the novel FRTDS.
Open AccessA Real-Time Digital Solver for Smart Substation Based on Orders
In order to expand the simulation scale of smart substation, a simulation model of the inlet-outlet line unit, as described by the 0/108 S conductance for multivalued coefficients pre-storage is presented in this paper. As a part of orders decomposition, the address conversion circuit for multivalued coefficients can reduce the computational burden of processing elements. For the convenience of the generalization of the real-time digital solver based on FPGA (FRTDS, FPGA: Field–Programmable Gate Array), the address conversion circuit for multivalued coefficients is matched with the guide word, the formation module of sampled value (SV) packet, and the resolution module of generic object oriented substation event (GOOSE) packet are associated with the application identification (APPID) in the Ethernet frame. The address conversion circuit for multivalued coefficients, the formation module of SV packet, and the resolution module of GOOSE packet are reconstructed via the orders. A hardware-in-the-loop real-time simulation platform for smart substation is built based on the novel FRTDS. A case is given to demonstrate the simulation calculating capability and the hardware-in-the-loop ability of the novel FRTDS.
- Open Access
Multivalued Coefficient Prestorage and Block Parallel Method for Real-Time Simulation of Microgrid on FRTDS
The microgrid containing a large amount of high frequency power switches and nonlinear components has put forward high requirements for power system real-time simulation technology. Multivalued coefficient prestorage can reduce the calculation steps in real-time simulation. In order to reduce the storage pressure of the multivalued coefficients, the whole network is divided into multiple subnetworks that can be simulated in parallel, and only the parameters for computing input variables and internal variables are prestored. The multiport hybrid equivalent is performed to reduce the number of simultaneous network equations. The input variables are tied to state variables of the circuit so that the iterative calculation is limited to the local network. The devised methodology is validated through simulation of a low-voltage microgrid on a field programmable gate array (FPGA)-based real-time digital simulation (FRTDS) platform at a 5 μs time step. Comparison with a power systems computer aided design (PSCAD)/electromagnetic transients including DC (EMTDC) model shows that the proposed method is effective.
Open AccessMultivalued Coefficient Prestorage and Block Parallel Method for Real-Time Simulation of Microgrid on FRTDS
The microgrid containing a large amount of high frequency power switches and nonlinear components has put forward high requirements for power system real-time simulation technology. Multivalued coefficient prestorage can reduce the calculation steps in real-time simulation. In order to reduce the storage pressure of the multivalued coefficients, the whole network is divided into multiple subnetworks that can be simulated in parallel, and only the parameters for computing input variables and internal variables are prestored. The multiport hybrid equivalent is performed to reduce the number of simultaneous network equations. The input variables are tied to state variables of the circuit so that the iterative calculation is limited to the local network. The devised methodology is validated through simulation of a low-voltage microgrid on a field programmable gate array (FPGA)-based real-time digital simulation (FRTDS) platform at a 5 μs time step. Comparison with a power systems computer aided design (PSCAD)/electromagnetic transients including DC (EMTDC) model shows that the proposed method is effective.